| 1 | Excavation for foundation in hard rock by chiseling, wedging, line drilling etc including trimming and leveling the bed removing the excavated materials up to 1.50meters, staking as directed including dewatering manually, back filling with available earth, murum, ramming and watering complete. |
| 2 | Filling in plinth and floors with approved excavated materials in 15cm-20cm layers including watering and compaction complete. |
| 3 | Filling plinth and floor with contractor’s murum in 15cm-20cm layers including watering and compaction complete. |
| 4 | Providing dry trap/rubble stone soling 15cm-20cm thick including hand packing and compacting etc. complete. |
| 5 | Providing structure steel work in rolled sections confirming to the relevant Indian standards such as stanchion, column, beam, channels angles tees, fixed with connecting plates or angle cleats for main & cross beams (size up to and inclusive 175mm) |
| 6 | Providing structural steel work in rolled sections such as stanchion, columns, beams Channels etc above 175mm. |
| 7 | Providing and laying in situ cement concrete M-25 of trap metal for foundation bedding including bailing out water manually formwork, compacting and curing. |
| 8 | Providing and laying cement brick bat coba with one part of cement mortar (1:4) and two parts of broken brick bats to be mixed and laid to required slopes properly rammed as directed including curing etc. complete. |
| 9 | Providing and laying waterproofing treatment of 112mm average thickness consisting of 12mm thick layer in C.M1:3 with waterproofing compound @ 1kg / bag of cement as base constructing laying brick bat coba in C.M.1:5 with waterproofing compound @ 1kg bag including all lead all lead, lift & laid to proper slope to drain off water |
| 10 | Providing a laying cement concrete flooring 40mm thick with 1:2:4 cement concrete including waterproofing compound @ 1kg. /Laid to proper slope and level |
| 11 | Providing cement vata C.C.1: 2:4 to the junction of terrace parapet & the elsewhere, with finishing the same with neat cement and curing the same for 7 days etc. complete. |
| 12 | Strengthening the R.R.C. surface by providing plaster in cm 1:3 including neeru finish with portion of the plaster watering curing etc. competed with two coats of colour wash (plaster to be minimum 25mm thick) |
| 13 | Strengthening the load bearing wall by removing existing plaster cracks and loose open joints of the masonry filling hollows wherever found necessary with brick, laid in rich cement mortar replacing broken brick and broken cornices and re plastering with 1:3 cement mortar 25mm-30mm thick in two coats including scaffolding and applying two coats colour wash etc .(old and new ) |
| 14 | Providing & applying two coats of synthetic enamel paint of approved colour and shade to old and new structural steel on all surface in Staircase including scaffolding if necessary, cleaning the surface etc complete (excluding primer coat) size up to & inclusive of 175mm. & above 175mm |
| 15 | Providing & applying colour wash of approved colour & shade to the wall surface, floors in two coats to new surface including scaffolding. |
| 16 | Providing & fixing jute kantan screen to the scaffolding of external side of the building including removing the same after the work is over etc. |
| 17 | Pulling down brick/ stone masonry in cement mortar with plaster of opening. |
| 18 | Providing Doorma Company fire exit doors with glass wool Filling fire resistant doors size 4’-00”x 7’-00”. |
| 19 | Providing second class burnt brick masonry with conventional / I.S type brick in cement mortar 1:6 in superstructure including striking joint racking out joints watering scaffolding complete. |
| 20 | Providing 9 mm M.S. chequared plate for floor landing, midlanding portions all treads |
| 21 | Providing & fixing S.S. Handrails for staircase flight & top surface of railing bars |