Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 of MoRD by manual means and CESS etc. complete as per specification and direction of the Engineer-in-Charge.
2
Providing, laying, spreding and compacting stone aggregates of specific sizes to WMM specification including spresding in uniform thickness, hand packing,rolling with three wheeled steel roller 8-10 tonnes in stage to proper grade and camber, applying and brooming requisite type of screenig/binding materials to fill up the interstices of coarse aggregates, watering and compacting to the required density as per clause 404 of MoSRT&H specifications for Road & Bridge works(4th Revision) with all labour, materials, T&P, royalty, taxes and CESS etc. complete as per specification and direction of the Engineer-in-Charge
3
WMM
4
Providing and applying Primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and sparying primer at the rate of 0.7-1.0 kg/sqmas per Technical Specification Clause 502 including 1 % CESS & as per specification and direction of the Engineer-in-charge.
5
Providing and applying Tack coat with bitumen (RS-1) using emulsion sprayer at the rate of 2.0 kg/10sqmon prepared bituminous/ granular surfaceproperly cleaned with hydraulic broom as per Technical Specification Clause 503 including 1 % CESS & as per specification and direction of the Engineer-in-charge.
6
Bitumen Surface
7
Providing & laying SDBC with batch mix hot mix plant using crushed aggregate of specified grading, premixed with bituminous binder of 60/70 penetration grade, transporting the hot mix to work site, laying with a hydrostatic paver finisher wit censor control to the required grade, level, alignment, rolling with smooth wheeled, vibratory & tandem rollers to achieve the desired compaction as per clause 508 of MoSRT&H specification for road and bridge works (4th revision) etc complete in all respectincluding 1 % CESS as per direction of the Engineer-in-charge..
8
Providing & spreadinggood laterite moorum from approved quarryincluding cost, conveyance, royalty with all leads lifts and other taxes of all materials T&P articles required for the work complete and labour for conveying from stacks, speeding moorum in layers not exceeding 23 cm thickness watering with ordinary compaction including H & R.C of PRR etc. complete in all respects including 1 % CESS & as per specification and direction of the Engineer-in-charge.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.