|
| 1 | Dismantling of pre-existing Table Maestro (Main Desk, ERU,Bookcase)of EO & CE Room, shifting from 4 th. floor and reinstallation the same at 8 th. floorat Nabadadignta Bhavan as per direction of Engineer in charge. |
| 2 | Dismantling of pre-existing La Sede High Back Chair ofEO & CE Room, shifting from 4 th. floor and reinstallation the same at 8 th. Floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 3 | Dismantling of pre-existing La Sede Visitor Chair ofEO & CE Room, shifting from 4 th. floor and reinstallation the same at 8 th. Floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 4 | Dismantling of pre-existing Storage 4 Dr Filing Cabinet ofEO & CE Room , shifting from 4 th. floor and reinstallation the same at 8 th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 5 | Dismantling of pre-existing Almirah Storwel Plain ofEO & CE Room, shifting from 4 th. floor and reinstallation the same at 8 th. floorat Nabadadignta Bhavan as per direction of Engineer in charge. |
| 6 | Dismantling of pre-existing Patro Sofa (3+1+1) of Waiting Area beside Chairman Room , shifting from 4 th. floor and reinstallation the same at 8 th. floorat Nabadadignta Bhavan as per direction of Engineer in charge. |
| 7 | Dismantling of pre-existing Corner Table Bloom of Waiting Area beside Chairman Room, shifting from 4 th. floor and reinstallation the same at 8 th. floorat Nabadadignta Bhavan as per direction of Engineer in charge. |
| 8 | Dismantling of pre-existing Storage 4 Dr Filing Cabinet of PA to Chairman Room , shifting from 4 th. floor and reinstallation the same at 8 th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 9 | Dismantling of pre-existing Almirah Storwel Plain of PA to Chairman Room, shifting from 4 th. floor and reinstallation the same at 8 th. floorat Nabadadignta Bhavan as per direction of Engineer in charge. |
| 10 | Dismantling of pre-existing Chair 7002 of PA to Chairman, shifting from 4 th. floor and reinstallation the same at 8 th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 11 | Dismantling of pre-existing Chair 7003 of PA to Chairman, shifting from 4 th. floor and reinstallation the same at 8 th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 12 | Dismantling of pre-existing Storage 4 Dr Filing Cabinet of Accounts & Tender Room , shifting from 3rd. floor and reinstallation the same at 6th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 13 | Dismantling of pre-existing Almirah Storwel Plain ofAccounts & Tender Room, shifting fromfrom 3rd. floor and reinstallation the same at 6th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 14 | Dismantling of pre-existing Chair 7002 ofAccounts & Tender Room, shifting fromfrom 3rd. floor and reinstallation the same at 6th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 15 | Dismantling of pre-existing Chair 7003 of Accounts & Tender Room, shiftingfrom 3rd. floor and reinstallation the same at 6th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 16 | Dismantling of pre-existing Table 4020 ofAccounts & Tender Room, shiftingfrom 3rd. floor and reinstallation the same at 6th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 17 | Dismantling of pre-existing sofa L53 of Visiting Area , shifting from 3rd. floor and reinstallation the same at 6th. floor atNabadadignta Bhavan as per direction of Engineer in charge. |
| 18 | Dismantling of pre-existing Storage 4 Dr Filing of OSD Room , shifting from 3rd. floor and reinstallation the same at 6th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 19 | Dismantling of pre-existing Almirah Storwel Plain ofOSD Room, shifting fromfrom 3rd. floor and reinstallation the same at 6th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 20 | Dismantling of pre-existing Chair 7001D ofOSD Room, shifting fromfrom 3rd. floor and reinstallation the same at 6th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 21 | Dismantling of pre-existing Chair 7003 of OSD Room, shiftingfrom 3rd. floor and reinstallation the same at 6th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 22 | Dismantling of pre-existing Storage VSDU8 of OSD ROOM , shifting from 3rd. floor and reinstallation the same at 6th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 23 | Dismantling of pre-existing Storage 4 Dr Filing of SAE Room , shifting from 3rd. floor and reinstallation the same at 6th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 24 | Dismantling of pre-existing Almirah Storwel Plain ofSAE Room, shifting fromfrom 3rd. floor and reinstallation the same at 6th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 25 | Dismantling of pre-existing Chair 7002 ofSAE Room, shifting fromfrom 3rd. floor and reinstallation the same at 6th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 26 | Dismantling of pre-existing Chair 7003 of SAE Room, shiftingfrom 3rd. floor and reinstallation the same at 6th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 27 | Dismantling of pre-existing Storage WORK 4020 of SAE ROOM , shifting from 3rd. floor and reinstallation the same at 6th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 28 | Dismantling of pre-existing Storage 4 Dr Filing ofEE&AE ROOM , shifting from 3rd. floor and reinstallation the same at 6th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 29 | Dismantling of pre-existing Almirah Storwel Plain of EE&AE ROOM, shifting fromfrom 3rd. floor and reinstallation the same at 6th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 30 | Dismantling of pre-existing Chair 7001D of EE&AE ROOM, shifting fromfrom 3rd. floor and reinstallation the same at 6th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 31 | Dismantling of pre-existing Chair 7003 of EE&AE ROOM, shiftingfrom 3rd. floor and reinstallation the same at 6th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 32 | Dismantling of pre-existing Storage WORK 5026 of EE&AE ROOM , shifting from 3rd. floor and reinstallation the same at 6th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 33 | Dismantling of pre-existing Storage VSDU8 of EE&AE ROOM , shifting from 3rd. floor and reinstallation the same at 6th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 34 | Dismantling of pre-existing Table Arrive Set (Main Desk, ERU, Pedestal, Black unit)of Chairman Room , shifting from 4 th. floor and reinstallation the same at 8 th. floorat Nabadadignta Bhavan as per direction of Engineer in charge. |
| 35 | Dismantling of pre-existing Impress Back Unit (Main Desk, ERU, Pedestal, Black unit)of Chairman Room , shifting from 4 th. floor and reinstallation the same at 8 th. floorat Nabadadignta Bhavan as per direction of Engineer in charge. |
| 36 | Dismantling of pre-existing Sofa Accoustica 3 str. of Chairman Room , shifting from 4 th. floor and reinstallation the same at 8 th. floorat Nabadadignta Bhavan as per direction of Engineer in charge. |
| 37 | Dismantling of pre-existing Chair Halo Very High Back of Chairman Room , shifting from 4 th. floor and reinstallation the same at 8 th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 38 | Dismantling of pre-existing Chair Halo Revolving Visitos of Chairman Room , shifting from 4 th. floor and reinstallation the same at 8 th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 39 | Dismantling of pre-existing Corner Table Bloom of Chairman Room, shifting from 4 th. floor and reinstallation the same at 8 th. floorat Nabadadignta Bhavan as per direction of Engineer in charge. |
| 40 | Dismantling of pre-existing Manhattan Sofa 3+1+1 Set of Ante-Room for Chairman , shifting from 4 th. floor and reinstallation the same at 8 th. floorat Nabadadignta Bhavan as per direction of Engineer in charge. |
| 41 | Dismantling of pre-existing Corner Table Bloom of Ante-Room for Chairman, shifting from 4 th. floor and reinstallation the same at 8 th. floorat Nabadadignta Bhavan as per direction of Engineer in charge. |
| 42 | Dismantling of pre-existing Cetre Table Bloom of Anti-Room for Chairman, shifting from 4 th. floor and reinstallation the same at 8 th. floorat Nabadadignta Bhavan as per direction of Engineer in charge. |
| 43 | Dismantling of pre-existing Table Senate of Conference Room , shifting from 4 th. floor and reinstallation the same at 8 th. floorat Nabadadignta Bhavan as per direction of Engineer in charge. |
| 44 | Dismantling of pre-existing Chair Halo Very High Back of Conference Room , shifting from 4 th. floor and reinstallation the same at 8 th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 45 | Dismantling of pre-existing Chair Halo Revolving Visitos of Conference Room , shifting from 4 th. floor and reinstallation the same at 8 th. floorat Nabadadignta Bhavan as per direction of Engineer in charge. |
| 46 | Dismantling of pre-existing Storage VSDU8 of Conference Room , shifting from 4 th. floor and reinstallation the same at 8 th. floorat Nabadadignta Bhavan as per direction of Engineer in charge. |
| 47 | Dismantling of pre-existing Storage 4 Dr Filing Cabinet of Conference Room , shifting from 4 th. floor and reinstallation the same at 8 th. floor at Nabadadignta Bhavan as per direction of Engineer in charge. |
| 48 | Dismantling of pre-existing Almirah Storwel Plain of Conference Room, shifting from 4 th. floor and reinstallation the same at 8 th. floorat Nabadadignta Bhavan as per direction of Engineer in charge. |
| 49 | Dismantling of pre-existing Chair 1112D of Conference Room , shifting from 4 th. floor and reinstallation the same at 8 th. floorat Nabadadignta Bhavan as per direction of Engineer in charge. |
| 50 | Dismantling of pre-existing Sofa Manhattan 1Str. Of P.S to EO & CE , shifting from 4 th. floor and reinstallation the same at 8 th. floorat Nabadadignta Bhavan as per direction of Engineer in charge. |