Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Tender For Work Contract For 4Nos Tatkal In Vellakuttai Section In Alangayam Subdivision In Vaniyambadi Division. Submission Date for this Tender is 05-02-2024. Prime Mover Tenders in Tirupathur Tamil Nadu. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Excavation of Pole Pits/Stay Set: |
2 | For pole upto 8.0m length by using JCB/Manual |
3 | For pole above 8.0m length by using JCB/Manual |
4 | Excavation of Stay pit of 4.5" to 5" depth using JCB/Manual |
5 | Erection of Poles and Accessories |
6 | Erection of RCC, REC, PSC poles upto 8.00m length by using JCB/Manual |
7 | Erection of RCC, REC, PSC poles above 8.00m length by using JCB/Manual |
8 | Erection of stay set complete with fixing up stay wire Eye, Bow,Guy Shackle, Binding etc. |
9 | Fixing of line materials |
10 | Fixing of HT VCross arms3 1/2, 4 1/2 & 5 feet, Tapping cross arm & Guarding cross arm |
11 | Fixing of LT 3 Phase cross arm |
12 | Fixing of HT / LTTI Fitting |
13 | Fixing of HT Pin Insulators (11/22/33KV) |
14 | Fixing of LT Pin Insulators |
15 | Fixing of HT 11KV stain disc |
16 | Fixing of LT Shackle |
17 | Fixing of Aluminium knob |
18 | Paving and Stringing of conductor |
19 | Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor |
20 | Paving and stringing of conductors of sizes above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR |
21 | Erection of Distribution Transformers: |
22 | Erection of Distribution Transformer structure complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer. (Data as per Annexure II) |
23 | Loading/Unloading Charges |
24 | Loading of DT upto 100KVA |
25 | Unloading of DT upto 100KVA |
26 | Loading of various size of REC, RCC,PSC Poles upto 8.0m length from Road side. |
27 | Loading of various size of REC, RCC,PSC Poles above 8.0m length from Roadside. |
28 | Unloading of various size of REC, RCC,PSC Poles upto 8.0m length to pole pit |
29 | Unloading of various size of REC, RCC,PSC Poles above 8.0m length to pole pit |
30 | Loading of conductor |
31 | Unloading of conductor |
32 | Loading of line material |
33 | Unloading of line material |
34 | Transportation charges |
35 | Transportation of all types and sizes of poles and other associated material from road side to pole pit and vice versa upto 0.50KM |
36 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) upto 5Km from Anaicut Sub-station to Unai, Gudisai & Anaicut village and Poonjolai Sub-station to Agarajapalayam,Mohamadapuram, Ongapadi & Karadikudi village. |
37 | Transportation of conductor of all sizes from road side to pit location upto 1km of conductor. |
38 | Transporting of Distribution Transformer/Line Materials from stores to office/ site upto 10KM distance by engaging 1 ton capacity Minidor |
39 | Dismantling of Line Materials |
40 | Dismantling of RCC, REC, PSC & Metal poles of all sizes including the closing of pit |
41 | Dismantling of Cross arm clamps, TI fittings hardwares, insulators etc. |
42 | WORKSHOP CHARGES :- |
43 | AB switch or open type side arm stud, cutting and drilling holes. |
44 | Manufacturing of earth pipe clamps for structure including of drilling holes and welding and clamp with earth pipe |
45 | G.S.T. @18% should be Entered by the Bidder |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail