Renovation Of Mal B.D.O. Office Premises B.D.O.S Chamber Under Mal Development Block For The Year 2023-2024 Under The Fund Of 5Th S.F.C.

Issued by Local Bodies · Jalpaiguri, West Bengal
Tender Value
8.91 Lakhs
Estimated cost
Bid Submission
01 Feb 2024
0 days left
EMD
17836
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Jalpaiguri → West Bengal
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Renovation Of Mal B.D.O. Office Premises B.D.O.S Chamber Under Mal Development Block For The Year 2023-2024 Under The Fund Of 5Th S.F.C.

BOQ

Name of Work: Renovation of Mal B.D.O. Office Premises (B.D.O.’S chamber) under Mal Development Block for the year 2023-2024 under the fund of 5th S.F.C.
Sl. No. Item Description
1(Item No. 1, Page No. 10 of PWD Building Schedule (2017)Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m
2(Item No. 10, Page No. 11 of PWD Building Schedule (2017)Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed.
3(Item No. 2, Page No. 1 of PWD Building Schedule (2017)Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
4(Item No. 3, Page No. 1 of PWD Building Schedule (2017)Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.
5(Page No. 2,Item No. 4 ,of PWD Building Schedule (2017)(A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
6(Item No. 1, Page No. 14 of PWD Building Schedule (2017) (3rd Corrigendum)Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
7(Item No. 4(b), Page No. 24 of PWD Building Schedule (2017) (3rd Corrigendum)Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
8(Item No. 10, Page No. 26 of PWD Building Schedule (2017) (3rd Corrigendum)Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (ii ) River Bazree
9(Item No. 36, Page No. 42 of PWD Building Schedule (2017)Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.(f) 25 mm to 30 mm shuttering without staging in foundation
10(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction ofEngineer-In-Charge.
11(Item No. 7(a), Page No. 15 of PWD Building Schedule (2017) (3rd Corrigendum)Brick work with 1st class bricks in cement mortar (1:4)(a) In foundation and plinth
12(b) In superstructure, ground floor
13(Item No. 40, Page No. 43 of PWD Building Schedule (2017) Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel III. TATA/SAIL
14(Item No. 1 (ii)(a & b), Page No. 189 of PWD Building Schedule (2017)Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:4 cement mortar(a) 20 mm thick plaster
15(ii) With 1:4 cement mortar (b) 15 mm thick plaster
16(Item No 47, Page No. 315 of PWD Building Schedule (2017)25mm. thick damp proof course with cement concrete with stone chips (1:1.5:3) [with graded stone aggregate 10 mm nominal size] and admixture of water proofing compound as per manufacturer\"s specification followed by two coat of polymer based paint, (1st coat after 4 to 5 days of concrete laying and 2 nd coat just before brick masonry work) as directed (cost of water proofing compound & polymer based paint to be paid separately).( Chequering not required over concrete or painted surface).
17(Item No. 15, Page No. 192 of PWD Building Schedule (2017)Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m. In ground floor
18(Item No. 1(d), Page No. 114 of PWD Building Schedule (2017)Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be correted upto three decimals).(d) Sal : Local
19(Item No.- 5; Page No.- 116 of PWD Bldg. Schedule)Supplying, Fitting & Fixing Factory made prelaminated P.V.C. door frame of size 50 mmx47 mm with a wall thickness of 5 mm, made out of extruded 5 mm Prelaminated PVC sheet miter cut at two corners and joined with two nos of 1.5 mm long brackets of 15 mm x15 mm M.S. square tube. The two vertical door profiles are to be reinforced with 19 mmx 19 mm M.S. Square tube of 19 gauge, weather seal to be provided through out the frame. The door frame shall be fixed with the wall using 65/100 mm M.S. Screws through the frame by using P.V.C fasteners. A minimum of 4 Nos of screws to be provided for each vertical member and minimum 2 Nos for horizontal member etc. complete as per Manufacturer?s specification and direction of Engineer-in-Charge.
20(Item No.- 16; Page No.- 126 of PWD Bldg. Schedule)Supplying, Fitting & Fixing 30 mm thick both side prelaminated Factory made solid Panel PVC Door Shutter consisting of outer frame made out of M.S. tubes of 19 gauge thickness and size 19 mmx19 mm for styles, top and bottom rails, M.S. frame shall have cost of steel primers of approved make and manufacture, M.S. frame covered with 5 mm th. heat moulded PVC “C” channel of size 30 mm th, 70 mm width out of which 50 mm shall be flat and 20 mm shall be tapered in 45 degree angle on either sides forming styles; and 5 mm th. 95 mm wide PVC sheet out of which 75 mm shall be flat and 20 mm tapered in 45 degree on the inner side to form top & bottom rail and 115 mm wide PVC sheet out of which 75mm shall be flat and 20 mm shall be tapered on both sides to form lock rail. Top, bottom and lock rails shall be provided either side of the panel with 10 mm (5 mmx2) th.,20 mm wide cross PVC sheet as gap insert for top rail and bottom rail sheet to be fitted in the M.S. frame welded/sealed to the styles &rails with 7 mm (5 mm+2 mm) th.x15 mm wide PVC sheet beading on inner side and joined together with solvent cement adhesive. An additional 5 mm th. PVC strip of 20 mm which is to be stuck on the interior side of the “C” channel using PVC solvent adhesive etc. complete excluding all necessary hardwares as per direction of Engineer-in-Charge.
21(Item No. 12, a Page No. 124 of PWD Building Schedule (2017)Supplying solid flush type doors of deluxe decorative (both side) quality,conforming to I:S 2202 timber frame consisting of top and bottom rail and sidestyles of well seasoned timber 65mm wide each and the entire frame fitted with27.5mm wide battens places both ways in order to made the door of solid coreand internal lipping with teak, mahogony or rose wood approved decorativeveneers using phenol formaldehyde as glue etc. complete, including fitting, fixingthe shutters in position but excluding the cost of hinges and other fittings inground floor: (a) 35mm thick shutters (single leaf)
22(Item No. 1(b), Page No. 200 of PWD Building Schedule (2017)Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
23(Item No. 3B(b)IV, Page No. 201 of PWD Building Schedule (2017)Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (iv) Two coats (with any shade except white)
24(Item No. 1(a)IV, Page No. 200 of PWD Building Schedule (2017)Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
25(Item No. 3B(b)IV, Page No. 201 of PWD Building Schedule (2017)(B) Painting with superior quality aluminium paint of approved make andbrand including smoothening surface by sand papering etc. on steelsurface : (b) Two coats
26(Item No.5(b), Page No.204 of PWD Building Schedule (2017)(b) Rendering the surface of walls and ceiling with white cement basedwall putty of approved make and brand(1.5mm thick)
27(Item No.7(ii), Page No.195 of PWD Building Schedule (2017)Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer\"s specification and as per direction of the EIC. (In Ground Floor) (b) Two Coats ii) Solvent based interior grade Acrylic Primerii) Solvent based interior grade Acrylic Primer
28(Item No.10, Page No.196 of PWD Building Schedule (2017)Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer\"s specification and as per direction of the EIC. (b) Two Coats
29(Page No. 197 ,Item No. 17(c) (i) of PWD Building Schedule (2017)Protective and Decorative Acrylic exterior emulsion paint of approvedquality, as per manufacturer\"s specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer.In Ground floor (Two Coat)c) Super Protective 100% Acrylic Emulsion
30(Item No. viii, Page No. 140 of PWD Building Schedule (2017)Iron butt hinges of approved quality fitted and fixed with steel screws, with ISI mark.(viii) 100mm. X 75mm. X 3.50mm
31(Item No. iv(c), Page No. 140 of PWD Building Schedule (2017)Supplying, fitting and fixing M.S. clamps for door and window frame made of flat bent bar, end bifurcated with necessary screws etc. by cement concrete(1:2:4) as per direction. (Cost of concrete will be paid separately)(c) 40mm X 6mm, 125mm
32(Item No. 8(c), Page No. 141 of PWD Building Schedule (2017)Iron socket bolt of approved quality fitted and fixed complete.(c) 150mm long x 10mm dia bolt.
33(Item No. 10(b), Page No. 141 of PWD Building Schedule (2017)Iron hasp bolt of approved quality fitted and fixed complete (oxidised) with 16mm dia rod with centre bolt and round fitting. (b) 250mm long.
34( Page No. 141 Item No. 7 b of PWD Building Schedule (2017)Iron catch hook of approved quality fitted and fixed to shutter and chowkat.(b) 6mm dia x 225mm long
35(Item No. 24(ii), Page No. 143 of PWD Building Schedule (2017)Iron door handle of approved quality fitted and fixed complete: (ii) 150mm x 5.5 mm.
36(Item No. 16, b Page No. 143 of PWD Building Schedule (2017)(b) Supplying \"Godrej\" mortice lock chromium plated with keys 6 levers includingfitting & fixing complete
37(Item No. 35 B(a)(i) & A (i), Page No.64 of PWD Building Schedule (2017)Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc. (B) Wall With Sand Cement Mortar (1:3) 15 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @ 0.20kg/Sq.m. (a) Area of each tile upto 0.09 Sq.m(i) Coloured decorative
38(Page No. 66 ,Item No. 36 (I) (A) of PWD Building Schedule (2017) (3rd Corrigendum)Supplying and laying true to line and level vitrified tiles of approved brand (size not less than 600 mm X 600 mm X 10 mm thick) in floor, skirting etc. set in 20 mm sand cement mortar (1:4) and 2 mm thick cement slurry back side of tiles using cement @ 2.91Kg./sqM or using polymerised adhesive (6 mm thick layer applied directly over finished artificial stone floor/Mosaic etc without any backing course) laid after application slurry using 1.75 Kg of cement per sqM below mortar only, joints grouted with admixture of white cement and colouring pigment to match with colour of tiles / epoxy grout materials of approved make as directed and removal of wax coating of top surface of tiles with warm water and polishing the tiles using soft and dry cloth upto mirror finish complete including the cost of materials, labour and all other incidental charges complete true to the manufacturer\"s specification and direction of Engineer-in-Charge. (White cement, synthetic adhesive and grout material to be supplied by the contrr]e)(I) With application slurry @1.75 kg/ Sq.m, 20 mm sandcement mortar (1:4) & 2 mm thick cement slurry at back sideof tiles, 0.2 kg/ Sq.m white cement for joint filling withpigment.(A) Deep Colour & White
39(Item No. 2 (vi), Page No.173 of PWD Building Schedule (2017)Supplying, fitting and fixing boiling water proof ply conforming to IS: 710-1977bonded with phenol formaldehyde synthetic resin conforming to IS: 848-1974 ofapproved make and brand fitted and fixed as per design as per approval anddirection of Engineer-in-Charge. [excluding the cost of supporting frame workand teak wood batten/Lipping] In Ground Floor(vi) 19mm
40(Item No. 18, Page No.165 of PWD Building Schedule (2017)P.V.C- False Ceiling :Providing False Ceiling made with framework of steel tube of 40mm x 20mm ofnot less than 18 gauge,the long and cross section will be welded with each other1000mm to 1200mm apart the entire framework will be fixed in wall usingrawlplug or gutties or screws etc. and suspended from ceiling with M.S flat19mmx3mm as necessary,the entire frame will be painted with red oxide.PRINTED LAMINATED P.V.C Section 150mm x 12mmx 1.00mm (+/- 0.01mm)of approved quality and colour will be fixed on the frame so that the entireframework will not be visible from below P.V.C Section will be fixed with theframe with the help of self tapping steel screws including all materials and labourcharges including fitting,fixing the same and hoisting including mending thedamages in all respect and cost of paint as required as per direction of Engineerin-Charge .In ground floor
41(Item No. 20 (b), Page No.107 of PWD Building Schedule (2017)Supplying, fitting and fixing windows and ventilators with or without integrated grills conforming to IS 1038-1975 and manufactured from rolled steel sections conforming to IS 7452-1974 with non-friction projecting type, box type hinges, glazing clips, lugs locking bracket, handle plate etc, including hoisting in position, straightening if required, fixing lugs in cement concrete ( 1:2:4) with stone chips 20 mm down cutting holes and mending good damages to match with existing surface complete in all respect excluding glazing.
42(Page No. 235 No. 1 (II)(A)(l) of PWD Building Schedule (2017)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized (with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding & casement windows, partitions, formed of basic sections of any ISI embossed / certified make and brand as per direction of Engineer - InCharge. (Payment will be made on finished length of the work).b) 3- track sliding windowII) Colouredi) Bottom frame
43ii) Top frame & Side frame
44a) 2- track sliding window i) Bottom frame
45ii) Top frame & Side frame
46(Page No. 235 No. 1(A)(II)(d)of PWD Building Schedule (2017)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized (with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding & casement windows, partitions, formed of basic sections of any ISIembossed / certified make and brand as per direction of Engineer - InCharge. (Payment will be made on finished length of the work).d) Shutter for all track sliding windowII) Colouredd) Shutter for all track sliding windowi) Bottom & Top member
47ii) Style side member
48iii) Interlock member.
49(Page No. 243 No. 9 (of PWD Building Schedule (2017)Supplying bubble free float glass of approved make and brandconforming to IS: 2835-1987.v) 6mm thick clear glass
50(Page No. 242,Item No. 8 (i)(a) of PWD Building Schedule (2017)Supplying EPDM gusket of approved make and brand as per direction ofEngineer in charge.i) For sliding windows a) \" T\" shaped EPDM gasket for frames.
51(Page No. 239 , Item No. 2,of PWD Building Schedule (2017)Labour charge for fabrication and installation of composite door, window, partitions made from annodized extruded alloy aluminium sections for the following units:-ii ) 3 /4 track sliding window.ii ) 3 /4 track sliding window.
52(Page No. 242,Item No. 7of PWD Building Schedule (2017)Supplying maruti lock (100mm)
53Add Sanitation & Plumbing work
54Add Electrification work
55Add:- GST @ 18%
56Add:- Cess @ 1%

AI Tender Summary

OUR REF NO 41755175
AUTHORITY Local Bodies
TENDER VALUE 8.91 Lakhs
LAST DATE 01-02-2024
Authority
Authority Name Zilla Parishad
Work Description Renovation Of Mal B.D.O. Office Premises B.D.O.S Chamber Under Mal Development Block For The Year 2023-2024 Under The Fund Of 5Th S.F.C.
Basic Detail
Tender No WB/21/EO/MAL PS/2023-24
Bidding Type Tender
Location
City Jalpaiguri
State West Bengal
Key Dates
Publish Date 19 Jan 2024
Submission Date 01 Feb 2024
Open Date 05 Feb 2024
Finance
Tender Value 8.91 Lakhs
Tender Fee Ref. Documents
EMD 17836
Exemption Not Available
Document List
BOQ_1395531.xls
Tendernotice_1.pdf
f28fa3f1-e591-4ebe-9f64-cd93a64b6be5.html

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jan 19, 2024
11:30 IST

Tender Published

Tender notice published.

Completed
Feb 01, 2024
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Feb 05, 2024

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
xls

BOQ_1395531.xls

pdf

Tendernotice_1.pdf

html

f28fa3f1-e591-4ebe-9f64-cd93a64b6be5.html

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders