Nagar Palika Parishad-NPP has published Tender For Rebore Of (300X200)Mm Size Deep Bore Tubewell By Rc Rig Machine And Devlopment Of The Tubewell By Air Compressure And Op Unit In Mohalla -Chauhanan,Kiratpur. Submission Date for this Tender is 31-01-2024. Tube Well Tenders in kiratpur Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Transportation from store. Transportation OF ringmachice |
2 | Transportation of T&P by truck |
3 | Loading & unloading of T&P 2-2 jobs |
4 | Toeing of Air of Compressor T&P tractor |
5 | Transportation of Compressor T&P by truck |
6 | loading & unloading of T&P1-2 jobs |
7 | Toeing of OP unit troll by tractor |
8 | Transportation of OP unit T&P |
9 | Loading & Unloading of T&P |
10 | Retunr trip above T&P Rig m/c compressor and OP Unit |
11 | Transportation of Tube well assembly |
12 | Loading & Unloading of T&w assembly |
13 | Supply of Tube well assembly 300 mm dia Ms ERW Housing pipe of 7.1 mm thickness as per IS-3589 |
14 | 200 mm dia Ms ERW Plan pipe of 7.1 mm thickness as per IS-3589 |
15 | 33x200 mm dia MS Reducer |
16 | 200 mm dia Ms ERW Slotted pipe of 7.1 mm thickness as per IS-3589 |
17 | 300 mm dia M. Socket/Ring |
18 | 200 mm dia M. Socket/Ring |
19 | 200 mm dia bail plug |
20 | 200 mm dia center Guide |
21 | 300 mm dia MS Housing clamp |
22 | 300 mm dia MS Tube well |
23 | 200x100m dia Tube well foundation RS Jount 2.5mt long |
24 | Driling of Bore Erection of RC Rig Machine and camp equipage |
25 | Driling of 675 m bore GL to 90M BGL |
26 | Driling of 600 bore From50 M to90M BGL |
27 | Driling of 600 bore From90 M to 120M BGL |
28 | Driling of 600 bore From 120 M to 150M BGL |
29 | Driling of 600 bore From 150 M to 180M BGL |
30 | Dismentling of Rig Machine and T&P after Completion of the work |
31 | Water arrangement for construction of T.W. |
32 | Provision of temporary fencing baricating at T.W. site for the protection of children, animals and human being by barbered wire during competion of tube well and dismantling after completion of work |
33 | lowering of tube well asembly.Lowering of 300 mm dia MS Housing pipe From GL to 40 m BGL |
34 | Lowering of 200 mm dia MS Blind/Slotted From GL to 40 m 90 BGL |
35 | Same as above but from 90 to 120 M BGL |
36 | Same as above but from 120 to 170 M BGL |
37 | Supply of 1.6 mm to 4.8 mm size pea gravel Lalquan Quarry |
38 | Devlopment of the Tube well.Erection of Compressor Unit and cap equpage |
39 | Dismentling of above after completion of work |
40 | Devlopment of Tube well by 600 PSI Capacity air compressor |
41 | Erection of OP Unit and camp equipage |
42 | Dismentling of above after completion of work |
43 | Devlopment of the Tube well by OP Unit |
44 | Yield and verticality test of Tube well |
45 | Chemical and bacterilogical test of water |
46 | Rental charges of rig Machine air commpressor and OP unit |
47 | Site clearance after completion of TW & Cutting, Welding of Well cap after development and earth filling in water pits |
48 | Add SGST @6% |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail