Supply Of Surgical Instrument Estimate Rate , Laying And Jointing Pvc Pipe. Heading , Adaptor For Suction Cannulae. Luer. 10Cm / 4 , Anal Retractor, Park With 2 Pairs Of Lateral Blades-16 / 10X70mm & 22 / 15X95mm. , Aspirating Dissector. Negus / Freer. 21Cm / 8.25. , Autoclave Drumsmedium , Autoclave Drumssmall , Autoclave Drums Extra Large , Autoclave Drums Large , A-V Retractor , Ball Probe, Goldman. 0.8Mm. 45°. Matt.16Cm. , Ball Probe, Goldman. 1.0Mm. 45°. Matt. , Blakesley Ethmoid Fcps. Thrucut.2Mm / Str. Length 12.5Cm. Solid. , Blakesley Ethmoid Fcps. Thrucut. 2Mm / Ald Up 45° .Length 12.5Cm.Solid. , Blakesley-Wilde Ethmoid Fcps., 3Mm / Ald.Up 90°. Length 12.5Cm. Solid. , Blakesley-Wilde Ethmoid Fcps., 3Mm / Str. Length 12.5Cm. Solid. , Blakesley-Wilde Ethmoid Fcps., 4Mm / Str. Length 12.5Cm. Solid. , Blakesley-Wilde Ethmoid Fcps., 3.5Mm / Ald.Up 45°. Length 12.5Cm. Solid. , Blakesley-Wilde Ethmoid Fcps., 3.5Mm / Str. Length 12.5Cm. Solid. , Bohler - Brown Splint , Bohler Stirrup , Bone Distractor Large 1 , Bone Distractor Medium 1 , Bone Distractor Small 1 , Bone File With Aliminium , Bone Holding Forceps With Drill Guide For Butterfly Fragment 2 , Bone Hook Large , Bone Hook Medium , Bone Hook Small , Bone Levers All Sizes 4 , Bone Spikes.Types & Sizes All Size 4 Each ( Pointed ) , Bone Spikes.Types & Sizes All Size 4 Each ( Blunt ) , Bowls Large , Bowls Medium , Bowls Small , Bur, Cutting. Imp. Round, 1Mm. Str. 7Cm. , Bur, Cutting. Imp. Round, 0.6Mm. Str. 7Cm , Bur, Cutting. Imp. Round, 1.4Mm. Str. 7Cm. , Bur, Cutting. Imp. Round, 1.8Mm. Str. 7Cm. , Bur, Cutting. Imp. Round. 4Mm. Str. 7Cm. , Bur, Cutting. Imp. Round. 5Mm. Str. 7Cm , Bur, Cutting. Imp. Round. 6Mm. Str. 7Cm. , Bur, Cutting. Imp. Round. 7Mm. Str. 7Cm. , Bur, Cutting. Imp. Round. 0.8Mm. Str. 7Cm , Bur, Cutting. Imp. Round. 2.3Mm. Str. 7Cm. , Bur, Cutting. Imp. Round. 2.7Mm. Str. 7Cm , Bur, Cutting. Imp. Round. 3.1Mm. Str. 7Cm. , Bur, Cutting. Imp. Round. 3.5Mm. Str. 7Cm. , Bur, Cutting. Imp. Round. 4.5Mm. Str. 7Cm. , Bur, Diamond. Imp. Round. 1Mm. Str. 7Cm , Bur, Diamond. Imp. Round. 4Mm. Str. 7Cm. , Bur, Diamond. Imp. Round. 5Mm. Str. 7Cm. , Bur, Diamond. Imp. Round. 6Mm. Str. 7Cm. , Bur, Diamond. Imp. Round. 7Mm. Str. 7Cm. , Bur, Diamond. Imp. Round. 0.6Mm. Str. 7Cm. , Bur, Diamond. Imp. Round. 0.8Mm. Str. 7Cm. , Bur, Diamond. Imp. Round. 1.4Mm. Str. 7Cm. , Bur, Diamond. Imp. Round. 1.8Mm. Str. 7Cm. , Bur, Diamond. Imp. Round. 2.3Mm. Str. 7Cm. , Bur, Diamond. Imp. Round. 2.7Mm. Str. 7Cm. , Bur, Diamond. Imp. Round. 3.1Mm. Str. 7Cm. , Bur, Diamond. Imp. Round. 3.5Mm. Str. 7Cm. , Bur, Diamond. Imp. Round. 4.5Mm. Str. 7Cm. , Bur, T / C Carbide Imp. Round 0.8Mm 7Cm. , Bur, T / Carbide. Imp. Round. 0.6Mm. 7Cm. , Bur, T / Carbide. Imp. Round. 1.0Mm. 7Cm. , Bur, T / Carbide. Imp. Round. 1.4Mm. 7Cm. , Bur, T / Carbide. Imp. Round. 1.8Mm. 7Cm. , Bur, T / Carbide. Imp. Round. 2.3Mm. 7Cm. , Bur, T / Carbide. Imp. Round. 2.7Mm. 7Cm. , Bur, T / Carbide. Imp. Round. 3.1Mm. 7Cm. , Bur, T / Carbide. Imp. Round. 3.5Mm. 7Cm. , Bur, T / Carbide. Imp. Round. 4.5Mm. 7Cm. , Bur, T / Carbide. Imp. Round. 4Mm. 7Cm. , Bur, T / Carbide. Imp. Round. 5Mm. 7Cm. , Bur, T / Carbide. Imp. Round. 6Mm. 7Cm. , Bur, T / Carbide. Imp. Round. 7Mm. 7Cm. , Burn’S Bone Holding Forceps – All Sizesi ) Curved , Burn’S Bone Holding Forceps – All Sizesi ) Straight , C Retractor , Cannula With Oblique Beak And Trocar Forsinoscopy. Id 5Mm. Length 8.5Cm. , Cannula, Insulated For Suction And Coagulation. Ball End. Od 3Mm. Length 25Cm. , Cannula, Suction. Poole. Str. Od 10Mm.Length 22Cm / 8.75. , Cannula, Suction. Yankauer. Cp. 27Cm. , Cannulae, Verhoeven3mm / 26G-.4Mm / 25G.-.5Mm / 24G.-.6Mm / 23G.-.7Mm / 22G.- .8Mm / 21G.-.9Mm / 20G.-1Mm / 19G.-1.2Mm / 18G.-1.4Mm / 17G.-1.6Mm / 16G.- 1.8Mm / 15G.2Mm / 14G.-2.3Mm / 13G.-2.6Mm / 12G. , Catpaws Retractors 4 , Chisel All Sizes , Chisel, 2Mm. Jenkins. 14Cm / 5.5. , Chisel, 4Mm. Jenkins. 14Cm / 5.5. , Chisel, 6Mm. Jenkins. 14Cm / 5.5. , Clamp, Crushing. Intestinal. 11Cm Jaws. Payr. 29Cm / 11.5. , Clamp, Intestinal. Kocher-Atr. Cvd. 28Cm / 11 , Clamp, Intestinal. Kocher-Atr. Str. 28Cm / 11 , Clamp, Stomach. Str. Fenestrated Blades. Moynihan. 28Cm / 11. , Clip, Sterilizing. Mayo. 15Cm / 6. , Copper Cautery , Corneal Scissors , Cottle Scissors, With 8.5Cm Serrated Heavy Blades.. Aof. 16Cm / 6.5. 1 , Curette, Adenoid; With Cage. St. Clairthomson. Cp / Ss Handle. 10Mm, 24Cm / 9.25. , Curette, Adenoid; With Cage. St. Clairthomson. Cp / Ss Handle. 12Mm, 24Cm / 9.25. , Curette, House. Ald.2Mm / 2.5Mm. Length15cm. , Curette, House. Str.1.5Mm / 2Mm. Length15cm. , Curette, House. Str.2Mm / 2.5Mm. Length15cm. , Cuscos Speculum Large , Cuscos Speculum Medium , Cuscos Speculum Small , Denham Pin All Sizes , Diamond Pointed Awl Femur - Straight , Diamond Pointed Awl Humerous , Diamond Pointed Awl Radius / Ulna , Diamond Pointed Awl Tibia - Curve , Dilator Set Heggers 3 Set Of 10 , Dilators, Bile Duct. 3Mm-11Mm. Set Of 9. Bakes. 20Cm / 8. , Director, Gvd. Cvd. With Tongue Tie. 13Cm / 5. , Director, Gvd. Cvd. With Tongue Tie. 15Cm / 6. , Director, Gvd. Str. With Tongue Tie. 15Cm / 6. , Dissector, Thyroid. Kocher. 15Cm / 6. , Distal Locking Awl , Doins Retractor Medium , Draffin Bipod, With 4 Rings. 48Cm / 19. , Dressing Scissors S Cvd 6 , Electric Plaster Cutter , Elevator, Cottle. Cvd. D / E. 22Cm / 8.75. , Elevator, D / E. Broad. Freers. 20Cm / 8. , Elevator, Farabeuf.8Mm. Cvd. 15Cm / 6. , Elevator, Farabeuf.8Mm. Str. 15Cm / 6. , Elevator, Freer-Lempert. D / E. 20Cm / 8. , Elevator, Plester. 8Mm. 18Cm / 7. , Esmarch Bandage ( Rubber / Latex ) 4 Inch , Esmarch Bandage ( Rubber / Latex ) 6 Inch , F Tool , Farabeuf / Periosteum A.O Elevator ( Sizes ) All Size 2 , Fat Injection Syringe . High Pressure. , Fcps., Adson. 1.5Mm. 1X2 Tth. 12Cm / 4.75 , Fcps., Adson. 1.5Mm. Serr. 12Cm / 4.75 , Fcps., Allis. Tissue. 4X5tth. 15Cm / 6 , Fcps., Allis. Tissue. 5X6tth. 20Cm / 8 , Fcps., Allis. Tissue. 5X6tth. 25Cm / 10 , Fcps., Artery. Crile. Cvd. 16Cm / 6.25. , Fcps., Artery. Crile. Str. 16Cm / 6.25. , Fcps., Artery. Kelly-Rankin. Cvd. 16Cm / 6.25. , Fcps., Artery. Kelly-Rankin. Str. 16Cm / 6.25. , Fcps., Artery. Mixter. Rt.Ald. Fine. 28Cm / 11. , Fcps., Artery. Mixter. Rt.Ald. Fine.15Cm / 6. , Fcps., Artery. Mixter. Rt.Ald. Fine.20Cm / 8. , Fcps., Artery. Mixter. Rt.Ald. Fine.23Cm / 9. , Fcps., Artery. Mixter. Rt.Ald. Fine.25Cm / 10. , Fcps., Artery. Mosquito. Cvd. 12.5Cm / 5. , Fcps., Artery. Mosquito. Cvd. 15Cm / 6. , Fcps., Artery. Mosquito. Str. 12.5Cm / 5. , Fcps., Artery. Mosquito. Str. 15Cm / 6. , Fcps., Artery. Sp-Wells. Cvd. 15Cm / 6. , Fcps., Artery. Sp-Wells. Cvd. 20Cm / 8. , Fcps., Artery. Sp-Wells. Cvd. 23Cm / 9. , Fcps., Artery. Sp-Wells. Cvd. 25Cm / 10. , Fcps., Artery. Sp-Wells. Str. 15Cm / 6. , Fcps., Artery. Sp-Wells. Str. 20Cm / 8. , Fcps., Artery. Sp-Wells. Str. 25Cm / 10. , Fcps., Babcock. 20Cm / 8 , Fcps., Babcock. 8Mm Jaw.15Cm / 6 , Fcps., Biopsy-Oval Cup. Tubular. Ø5mm. Length 35Cm. , Fcps., Biopsy-Oval Cup. Tubular. Ø5mm. Length 45Cm. , Fcps., Bipolar Str. 1.5Mm Jaw With Integrated Suction.3 Ring Handle.Length 18Cm. , Fcps., Bipolar. Ald. 1.5Mm Jaw. Rotatable. `X` Action Handle With Lockable Sliding Suction Sleeve.Length 18Cm.Autoclavable , Fcps., Bipolar. Str. Tip Ø3mm For M.L.S. , Fcps., Cholecystectomy. Geary Grant. 1St Cv. / Vrt. Serr. 23Cm / 9. , Fcps., Crocodile Cup. 1Mm / .9Mm. Oval Jaw Cvd.Lt. Matt. 8Cm. , Fcps., Crocodile Cup. 1Mm / .9Mm. Oval Jaw Str. Matt. 8Cm. , Fcps., Crocodile Cup. 1Mm / .9Mm. Oval Jaw. Cvd-Up. Matt. 8Cm. , Fcps., Crocodile. Serr. .8Mm / 4Mm. Jaws.Ald-Up. Matt. 8Cm. , Fcps., Crocodile. Serr. .8Mm / 4Mm. Jaws.Lt.Matt. 8Cm. , Fcps., Crocodile. Serr. .8Mm / 4Mm. Jaws.Rt.Matt. 8Cm. , Fcps., Crocodile. Serr. .8Mm / 4Mm. Jaws.Str. Matt. 8Cm. , Fcps., Denis-Browne. Gland. 20Cm / 8 , Fcps., Dsctg. 3Mm. Serr. Tips. Sup.20Cm / 8. , Fcps., Dsctg. 3Mm. Serr. Tips. Sup.23Cm / 9. , Fcps., Dsctg. 3Mm. Serr. Tips. Sup.25Cm / 10. , Fcps., Dsctg. 3Mm. Serr. Tips. Sup. 15Cm / 6. , Fcps., Dsctg. Mcindoe. 1X2 Tth / Crs.Serr. 15Cm / 6. , Fcps., Dsctg. Russian. 20Cm / 8. , Fcps., Dsctg. Sup. 1X2 Tth. Nrw. 25Cm / 10. , Fcps., Dsctg. Sup. 3Mm. 1X2 Tth. 15Cm / 6. , Fcps., Dsctg. Sup. 3Mm. 1X2 Tth. 20Cm / 8. , Fcps., Dsctg. Sup. 3Mm. 1X2 Tth. 23Cm / 9. , Fcps., Dsctg. Sup. 3Mm. 1X2 Tth. 25Cm / 10. , Fcps., Dsctg. Waugh. 1X2 Tth. 20Cm / 8. , Fcps., Gall Stone. Small Jaw. B / J. Desjardins. 23Cm / 9. , Fcps., Gall Stone. Small Jaw. S / J. Desjardins. 23Cm / 9 , Fcps., Intestinal. Doyen. Cvd. 16Cm / 6.5. , Fcps., Intestinal. Kocher. Cvd.8Cm / 3.5 Light Elastic Blades. 20Cm / 8. , Fcps., Intestinal. Kocher. Cvd. 15Cm / 6 Light Elastic Blades. 28Cm / 11. , Fcps., Intestinal. Kocher. Str. 13Cm / 5Light Elastic Blades. 25Cm / 10. , Fcps., Jefferson. 1.5Mm. Serr. 18Cm / 7 , Fcps., Jefferson. 1.5Mm.1X2 Tth. 18Cm / 7 , Fcps., Kocher [ Oschner ] . Cvd. 16Cm / 6.25. , Fcps., Kocher [ Oschner ] . Cvd. 20Cm / 8. , Fcps., Kocher [ Oschner ] . Str. 16Cm / 6.25. , Fcps., Kocher [ Oschner ] . Str. 20Cm / 8. , Fcps., Lahey. Vrt. Serr. 23Cm / 9. , Fcps., Maxillary Sinus. 90°. 2Mmx12mm. Solid. Working Length 12.5Cm. Dr. Navalakhe. , Fcps., Micro-Laryngeal, 2Mm. Cup Jaw. Rt. Length 23Cm. , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Brick Work In C.M 1:5 Mix Including All Labour Charges Etc Complete , Brick Work In C.M 1:5 Mix Using 2Nd Class Ground Moulded Chamber Burnt Bricks With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And Including All Labour Charges Etc Complete , Plastering In C.M 1:5-12 Mm Thick With Including Cost And Conveyance Of All Materials And In , B ) Ci Bend 22.5° ( 250Mm Dia ) , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve , Supplying, Conveying And Fixing Spls. Including Ea , Supplying, Conveying And Fixing Spls. Including Eart , Construction Of Chamber For 100Mm Sluice Plates , Construction Of Chamber For 100Mm Sluices Valve