| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 07-02-2024 | Corrigendum 1 | Date | 16-02-2024 |
| Sl. No. | Item Description |
| 1 | Schedule-1 : Track Linking on Viaduct |
| 2 | Setting up of TCB on Viaduct and Carrying out Primary Welding of Rails |
| 3 | Setting up of TCB on Viaduct as per approved drawings & Specifications duly Designing, Fabricating & Erection of 12 Nos of 1.5T Gantries having Chain Pulley & Sling arrangement , motorised & Synchronised operation of all Slings in gantries. Gantry shall be mounted on Rail Track (Rails shall be Supplied by IRCON at Depot, TCB on Ground/Nearby Store) duly loading, transporting & lifting on to viaduct, fabrication works and fixing over concrete pedestals/wooden supports etc,. Providing & erecting 04 No of 1.5T gantries behind Flash Butt Welding Machine location on Viaduct as per Drawings & Specifications with fixing arrangements. Providing & installation of Conveyor roller arrangement for movement of Rail panels both 25m & 200m welded panels as per appoved Drawings & Specifications. Taking delivery of 02 Nos of Crossovers (1:12 or 1:18 or 1:9 type) with all accessories from IRCON Store/TCB on Ground,transportation, loading, lifting on Viaduct up to locations and fixing on both sides of TCB with all temporary supports/drilling in concrete, wooden blocks, fixing operating handle etc., complete and making it operational. Fixing of 1435mm Gauge Temporary Track with 200m Welded/Jointed Panels on One side of TCB duly lifting of Welded panels, shifting with Gantry, fixing with temporary spacers & clamps, fixing gauges as per approved drawings & specifications, drilling holes in RC Bed Concrete, clamping at Rail joints with suitable Fish Plates to ensure continuous track and its maintainance during TCB working with all Contractors Labor, Machinery, Tools & Tackles, Equipments, Fuel, Lead & Lift, ancillary works, etc., complete as directed by IRCON. NOTE: Arrangement for setting up of 04 TCB\"s at a time shall be made based on the Access provided by Client. Contractor may take away the TCB materials arranged by him after completion of works and shall be his property. |
| 4 | Lifting of 25m JIS 60 Kg Rails from Stacks at TCB Locations (on Ground)using Spreader Beam & Suitable capacity Cranes, Transportation of Rails from Storage Yard/TCB using 80 Feet long Trailors, Lifting on to Viaduct at various TCB Locations using Suitable Cranes up to a height of 25m from Ground to Girder Top , handling of Rails for meeting Flash Butt Welding of Rails, Providing & arranging Rail Stacking bed on Viaduct with intermediate supports, unloading of Rails on Viaduct behind FBW Machine taking all precautions with Contractors own Machinery, supports, labour, tools & tackles, fuel, ropes, slings, Spreader beam of suitable length, rail clamps, taking safety measures, local taxes etc., complete., and as directed by IRCON. Note: The above item includes a free lead of upto 1.0 Km. |
| 5 | Dismantling of the TCB on Viaduct including Gantry arrangements, Conveyor system, temporary turnouts, Rail bed etc., at one location on completion of the welding at that location, taking down the materials & loading of the Welding Plant, Rail Fedder Car Set including Motor Car & wagons, Materials in trailers/truck, transportation of the same to the next location of TCB and installation of the Welding plant and All arrangements on the TCB anywhere alongthe alignment between Vapi to Vadodara, and setting up of the TCB at the next location of the Welding plant, including all the Machinery, Equipments, labour, tools , tackles, taxes, duties etc. complete., and as directed by IRCON. Note: Average distance of shifting to be taken as 130 Kms |
| 6 | Dismantling of the TCB on Viaduct including Gantry arrangements, Conveyor system, temporary turnouts, Rail bed etc.,on completion of the welding at that location, taking down the materials & loading of the Welding Plant, Rail Fedder Car Set including Motor Car & wagons, Materials in trailers/truck, transportation of the same to store/yard located nearby, including all the Machinery, Equipments, labour, tools , tackles, taxes, duties etc. complete., and as directed by IRCON. Note: Average distance of shifting to be taken as 50 Kms |
| 7 | Carrying out Primary flash butt welding of 25m long JIS Grade 60 Kg Rails with IRCON’s welding plant at various locations on TCB over Viaductalongthe alignmentincludingshifting of the rails from rail stack on Viaduct to the rail bedincluding aligning, operation, maintenance , pre-grinding of rail ends, feeding of the rail to the welding plant, carrying out welding to form 200m Panels,grinding of welds as per requirement (Rough Grindings & Final Grindings in 04 Stages) with contractors own suitable grinder/disc/stones etc.,of approved make, Checking of jts using Rail Tread Measuring Device (provided by IRCON) , handlingthe panels using Conveyor arrangement and Gantries, concurrent pulling and side shifting of welded rail panels, final profile grinding, making lighting and power arrangement by deploying sound proof electric generators, USFD testing of joints,making test weld joints, loading and unloading of test piece & Carrying out tests in approved labs, Marking with Strips & Painting of weld joints as per the specification,including all the labour, tools , tackles, Fuel, materials, maintennace ofmachinery & equipments and approved measurement tools and gauges. All work shall be carried out as per the technical specification and detailed scope of work given in the tender documents and as directed by IRCON.Note: The daily /regular maintenance activities alongwith necessary consumablesis also in the scope of this item for the machinery and equipment provided by IRCON for whichno extra payment is admissible. Grinding of Rails shall be carriedout only by Certified Persons. |
| 8 | Schedule-2: Laying Temporary Track, Final Track, Secondary Welding & Destressing of Rails |
| 9 | Supplyingand Fixing of 1435mm gauge Supports for laying of Temporary Track on RC Bed by providing Rail clamps @ 2.5m c/c and providing Gauge strips @ 5m c/c, providing wooden planks/ chalks, using Template etc.,as per approved drawings and Specifications, drilling & fixing bolts and removing the same before track slab laying, cutting/ removingthe bolts as per approved method with plugging of holes with approved materialbefore fixing of Track Slabs, shifting of all materials from one TCB to other, Refixing & Removal with all Contractors materials, tools, tackles, drilling machines, generator, fuel etc., complete., and as directed by IRCON.Note:1.Contractor may take away the temporary track materials arranged by him after completion of works and shall be his property.2. Fixing of track slab is in the scope of other agency for which properinterface with other agency is required. |
| 10 | Handling of 200m Welded Rail Panels from Stack on Viaduct, Lifting & Placing of 10 Nos , 200m long Panels on Rail Feeder Car Set (Issued by IRCON)using Gantry arrangements, Operation of Rail Feeder Car with all Manpower & Fuel, its maintenance, operation of temporary Turnouts/CO for machinery movement, laying of Temporary Track ( using Rollers, Wooden supports and fixing with all Clamps, gauge strips etcby operatingitem 2.1 above) , providing Fish Plates /Clamps at Panel joints as per approved drawings, specifications and methods , maintaining the Track gauge till completion of work with all Contractors materials, fuel, operators, helpers, maintenance, tools & tackles etc., complete and as directed by IRCON to the full satisfaction of Engineer.Note: The daily /regular maintenance activities alongwith necessary consumablesis also in the scope of this item for the machinery and equipment provided by IRCON for whichno extra payment is admissible. |
| 11 | Fixing Base Plates on the Track Slabs before lifting it by the Slab Track laying Contractor duly interfacing with the Track Slab laying Contractor, fixing of remaining Track fastenings & Rail Turnover Prevention device on Track slab over Viaduct/Tunnel as per Drawings & Specifications after placing the Slabs on RC Bed by Track Slab laying Contractor with Contractors own Machinery, labor, tools & tackles, equipments, fuel, trolley, miscellaneous arrangements etc., complete and as directed by IRCON. This item includes scope oftaking delivery of Track Fastenings & Rail Turnover Prevention device from IRCON\"s store near Depot/TCB, assembling them at TCB on Ground/ on viaduct as per requirement. Alternatively, Contractor can also lift all Fastenings on Viaduct/Tunnel, Lead, Transport and Fix it on the Track Slabs duly interfacing with Track Slab laying Contractor. |
| 12 | Handling of 200m long Rail Panels already placed on theviaductand placing it over the Track Slabs fixed on RC Bed and fixing Rail Panels with all Fastenings, Rail Turnover Prevention Device, making it a continuous Track , aligning the Rails to required Gauge and Cantt & Profile etc., as per Drawing & Specifications and approved methods , Bolt tightning for Fastenings & Rail Prevention device using the Bolt Tightening Machine provided by IRCON with all Frames/Gantries, including Electric power, Generator,Rollers, Manpower/Labor, Fuel, all Lead & Lifts, lighting if any, Loading & Unoading as per approved arrangement etc., Complete and as directed by IRCON. |
| 13 | Secondary Welding of Rail joints to convert 200m rail panels into 1 KmContinuously Welded Rails (CWR), usingFlash Butt Welding Machine & RRV issued by IRCON ,Operation of Machineries, releasing of fastening for makingfree railPanels and preparing them for the conversion into CWR by making ontrack Weldingas per required Technical Specifications, drawings and approved methods ,grinding the jointsto the required Profile (passing through all 4 stages)with all Equipments, Tools & Tackles, Labor, Fuel, grinding machines, stones etc., complete, Checking of jts using Rail Tread Measuring Device and as per the directions of IRCON. Lifting of Flush Butt Welding Machine , RRV and required tools/tackles from Ground TCB to Viaduct is included in the scope of this item. Note : Cost includes all tests involed. |
| 14 | Destressing of CWR track as per approved methodology using Rail tensor at destressing temperature duly releasing the fastening to make free rail CWR panels, keeping them on rollers, moving the Rails & gently tapping with wooden hammers, cutting the extra length of Rails, grinding the sides and making them ready for Arc Welding to be carried out by IRCON, fixing the Track with all Fastenings etc., complete and aligning the Track to required Final Profile with Contractors all Materials, Machinery, Tools & Tackles, Labor, Rollers, Hammers, Cutting disks, generator, fuel., etc., complete and as directed by IRCON.All the relaesed naterial i.e. Rails etc shall be handed over to IRCON at designated store/ depots. This item also includes scope for achieving final track parameters as per approved drawings, specifications and methods. During this operation, adjustable pads will be provided , inserted and groutedby another agency to achieve final levels for which interfacing is required with another agency, however, primary responsibility for achieving final track parameters will be in the scope of this item. All the released Material i.e. Rails etc shall be handed over to IRCON at designated store/ depots. |
| 15 | Schedule-3: Fixing of Turnouts, Crossovers ,Expansion Joints nad Insulated Joint |
| 16 | Installation of Turnouts (all types) including Lead portion with Synthetic Sleepers & Fastenings etc as per approved drawings, specifications and methods ., complete by taking delivery fromIRCON\"s Store / Depot/TCB, liftingthe same to viaduct and leading to the specified locations, assembling the same, marking on RC Bed and fixing the samealongwiththe Synthetic Sleepers & Track Fastenings by drilling & grouting the Bolt assembly as per Specifications, Inserting Bags & Grouting with Synthetic Resin below Sleepers usingnecessary pump/equipments, carrying out Survey to make it to line and level to achieve final desired track parameters complete with Contractors own Machinery, labor, Bolt assembly as per Specs, tools & tackles, equipments, fuel, trolley, miscellaneous arrangements etc., complete and as directed by IRCON. Note: Complete Turnouts assemblyset,Synthetic Resin & Bags shall be provided by IRCON at Store/Depot/TCB. Reference Pin Survey shall be done by Other agency. However, Track contractior shall Interface for this. |
| 17 | Installation of Crossover (all types) including lead portion with Synthetic Sleepers & Fastenings etc as per approved drawings, specifications and methods ., complete by taking delivery fromIRCON\"s Store / Depot/TCB, liftingthe same to viaduct and leading to the specified locations, assembling the same, marking on RC Bed and fixing the samealongwiththe Synthetic Sleepers & Track Fastenings by drilling & groutingthe Bolt assembly as per Specifications, Inserting Bags & Grouting with Synthetic Resin below Sleepers usingnecessary equipments, carrying out Survey to make it to line and level to achieve final desired track parameters complete with Contractors own Machinery, labor, tools & tackles, Bolt assembly as per Specs, equipments, fuel, trolley, miscellaneous arrangements etc., complete and as directed by IRCON. Note: Complete Crossoverassemblyset including lead portion ,Synthetic Resin & Bags shall be provided by IRCON at Store/Depot/TCB. Reference Pin Survey shall be done by Other agency. However, Track contractior shall Interface for this |
| 18 | Installationof Expansion Joints (all types) with Synthetic Sleepers & Fastenings etc as per approved drawings, specifications and methods ., complete by taking delivery fromIRCON\"s Store / Depot/TCB, liftingthe same to viaduct and leading to the specified locations, assembling the same, marking on RC Bed and fixing the samealongwiththe Synthetic Sleepers, by drilling & groutingthe Bolt assembly as per Specifications, Inserting Bags & Grouting with Synthetic Resin below Sleepers usingnecessary equipments, carrying out Survey to make it to line and level to achieve final desired track parameters complete with Contractors own Machinery, labor, tools & tackles, Bolt assembly as per Specs, equipments, fuel, trolley, miscellaneous arrangements etc., complete and as directed by IRCON. Note: Complete Expansion Joint ,Synthetic Resin & Bags shall be provided by IRCON at Store/Depot/TCB. Reference Pin Survey shall be done by Other agency. However, Track contractior shall Interface for this |
| 19 | Installation/ insertion of Insulated Joints into the track at specified locationsby cutting the existing Rails on the track and making all arrangemnet/ facilitating for Arc Welding to be done byIRCON. This includes taking delivery fromIRCON\"s store / Depot/TCB,lifting them over Viaduct and leading toVarious specified locationswith Contractors own Machinery, labor, tools & tackles, equipments, fuel, trolley, miscellaneous arrangements etc., complete and as directed by IRCON. All the released material i.e. Rails etc shall be handed over to IRCON at designated store/ depots. One Set of Insulatedjoint consists of twoNos of single insulated joints to be used one each in left and right rail. |
| 20 | Installation of 1 in 12 Turnout in TTF Surat (as part of Training) including Lead portion with Synthetic Sleepers & Fastenings etc as per approved drawings, specifications and methods ., complete by taking delivery fromIRCON\"s Store / Depot/TCB, liftingthe same and leading to the specified locations, assembling, marking on RC Bed and fixing alongwiththe Synthetic Sleepers & Track Fastenings by drilling & grouting the Bolt assembly as per Specifications, Inserting Bags & Grouting with Synthetic Resin below Sleepers usingnecessary pump/equipments, carrying out Survey to make it to line and level to achieve final desired track parameters complete with Contractors own Machinery, labor, Bolt assembly as per Specs, tools & tackles, equipments, fuel, trolley, miscellaneous arrangements etc., complete and as directed by IRCON. Note: Complete Turnouts assemblyset,Synthetic Resin & Bags shall be provided by IRCON at Store/Depot/TCB. Reference Pin Survey shall be done by Other agency. However, Track contractior shall Interface for this. |
| 21 | Dismantling of 1 in 12 Turnout after completion of Training in TTF, by taking out all bolts, Sleepers, Fastenings, Turnout assembly in good condition and transportation to Viaduct site ( average lead 150 Kms) and lifting & leading to work site on Viaduct with all means, Machinery, Crane, Trailor, manpower, tools, tackles, fuel etc., complete and as directed by the Engineer |
| 22 | Schedule-4: Ballasted Track Linking and other associated works in Maintenance Depots and Depots |
| 23 | Supply and Installation of Ballasted Trackwith required materials ( excluding Rails , Sleepers,Turnouts , EJs& IJs) as per the requirements specified in the Contract at (i) Surat Depot(ii) Safety Confirmation Car Base , Billimora and (iii) Maintenance Depots ( Vapi , Surat , Bharuch , Vadodara ) |
| 24 | Manufacturing, supply and stacking of machine crushed Track Ballast conforming to RDSO Specification (IRS-GE-1) with latest correction slips at HSR Depots /Maintenance Depots, Billimora SCC Base (Viaduct) or nominated locations. Engineer/Ircon\"s approval is mandatory before supply. |
| 25 | Leading & Spreading of ballast, from existing stacks in required uniform thickness, compaction of ballast layer laid on new formation at all the locations ( Normal Track, TO, CO, EJ, Level Crossingetc.,)with smooth wheeled power roller of 8-10 tonne capacity to sufficient number of passes to form consolidated ballast bed of required thickness (as per enclosed drgs) to the Specified width symmetrical to centre line of proposed track in correct line & level with all ascents & descents, as directed by Engineer incharge. Note: Item is inclusive of (a) providing ramp for taking roller to formation and removing the same & making good formation after completion of work; (b) redistribution & leveling of excess ballast while rolling to obtain uniform plane cambered surface. Work also includes Spreading Ballast at Billimora SCC Base on Viaduct. |
| 26 | Laying & Linking of 1435 mm Gauge track (On Billimora SCC, Depots & Maintenance Depots etc.,) with JIS 50 kg N and 60 KgN Rails including Compromisedrail section and PC sleeper/Synthetic Sleepers of specified density ( Normal Track, TO, CO, EJ, Level Crossingetc.,), on ballast bed spread and compacted with suitable roller, over prepared formation including Surveying & Pegging, leading free rails/welded panels available along the alignment on to formation with approved Method, leading and spreading all fittings and fastenings, spreading of sleepers at specified spacing, squaring, placing of rails over sleepers and fixing rails to sleepers with all types of fittings and fastenings to correct gauge & alignment, lubrication of fittings and fastenings with contractor\"s grease as per IR and other standards mentioned in the contract with contractors labour, tools, consumables, with all lead, lifts etc. complete and raising, levelling and initial packing of track to make it fit for 30 kmph and meet other prerequisites prescribed inthe contract specifications or other relevant technical standards as per the direction of the Engineer-in-charge.Note: 1.Rail cutting and Hole drilling shall be paid separately.2.Spreading of ballast and compaction shall be paid separately under relevant item.3. Track Materials such as Rails, Sleepers, Fastenings shall be provided by IRCON free of Cost. Executing Agency shall receive the materials from the Stores of IRCON.4. Agency shall be required to handle 25 m to 200 m rail panels for laying and linking of rails as per the approved methodology. |
| 27 | In Depots & Maintenance Depots |
| 28 | On Viaduct at Billimora SCC Base |
| 29 | Assembling , Laying & linking of Turnouts ( all types )with synthetic sleepers & Fastenings as per approved drawings , specifications and methodscomplete by taking delivery from IRCON\"s store and leading to the specified locations , assembling the same , marking on prepared ballast bed and fixing the same on JIS 50 Kg N rail section with the synthetic sleepers and fastenings using necessary equipment , carrying out survey to make it line and level to achieve finaldesired track parameterscomplete with Contractorsown Machinery , labour, tools & tackles , equipment , fuel, trolley &miscellaneous arrangements etc.,complete as directedby IRCON.Note : The Turnout setswith fastenings and sleepers shall be supplied by IRCON at Store. |
| 30 | 1 in 12Turnouts ( Rigid Crossing ) |
| 31 | 1 in 9 Turnouts ( Rigid Crossing ) |
| 32 | Assembling and laying of Expansion Joints with regards to installation direction and alignment (curve/straight) as applicableon synthetic sleepers on JIS 50 kg Railsection as per the approved drawings andin accordance with Appendix-14 of Technical Specifications andincluding leading of Expansion Joint ( EJ ) sets, handling of tongue rails,cutting of rails, drilling of holes as required, gauging, aligning. EJ\"s shall be installed as per the direction of the Engineer-in-charge and in accordance with Employer\"s requirements/Technical specifications.Note : The EJ setswith fastenings and Sleepers shall be supplied by IRCON at Store. |
| 33 | First or second through packing of Track of all Sleeper density including giving a general lift , as desired to eliminate sag after deep screening works, lifting of track, lowering of track and measure realingment of curves and formation , rahabiliattion as per the procedure prescribed in latest edition of IRPWM. Tamping & Packing of Ballast using hand-held tamping machines |
| 34 | Plain Track-1 st Through Packing/Tamping |
| 35 | Plain Track-2nd Through Packing/Tamping |
| 36 | Plain Track-3rd Through Packing/Tamping |
| 37 | 1 in 12Turnouts ( Rigid Crossing )-Through Packing/Tamping |
| 38 | Three round of Packing |
| 39 | 1 in 9 Turnouts ( Rigid Crossing )-Through Packing/Tamping |
| 40 | Three rounds of Packing |
| 41 | EJ-Through Packing/Tamping |
| 42 | Three rounds of Packing |
| 43 | Laying / Installation of Glued Insulated Rail Joints (Ordinary Type) at specified locationsby cutting the existing rails on the trackand making all arrangements /facilitating for AT/Arc welding to be done by IRCON. This includes taking delivery from IRCON store lifting them and leading to various specified locations with Contractors own machinery , labour tools & tackles , equipment , fuel , trolley , miscellaneousarrangements etc., complete as directed by IRCON. All the released materialshall be handed over to IRCONto designated store.Note: One set of Insulated joints consisted of twoNos of Single insulated jointsto be used each in left and right rail. |
| 44 | Supply of Fish plates & Fish Nuts toJIS 50 Kg N & 60 Kg Rail, 560 mmor 820 mm long with bolts and nuts and conforming to Technical Specifications & Tender Drawings.. |
| 45 | 560 mm Long with 4 Bolts for JIS 50 Kg N Rail Section. |
| 46 | 820 mm Long with 6 Bolts for JIS 60 Kg Rail Section. |
| 47 | Bolts and nuts. |
| 48 | Destressing of CWR track as per approved methodology (using Rail Tensor in case of rail temperature is less than the neutral rail temperature) and at destressing temperature duly releasing the fastening to make free rail CWR panels, keeping them on rollers, moving the Rails & gently tapping with wooden hammers, cutting the extra length of Rails, grinding the sides and making them ready for AT/Arc Welding to be carried out by IRCON, fixing the Track with all Fastenings etc., complete and aligning the Track to required Final Profile will Contractors all Materials, Machinery. Tools & Tackles, Labor. Rollers, Hammers, Cutting disks generator, fuel., etc., complete and as directed by IRCON. All the released material i.e., Rails Fastenings, etc., shall be handed over to IRCON at designated store/ depots. This item also includes scope for achieving final track parameters as per approved drawings, specifications and methods. |
| 49 | Supply and Installation of Solid Bed Track with required materials ( excluding Rails , Sleepers,Turnouts , EJs& IJs) as per the requirements specified in the Contract at (i) Surat Depot(ii) Safety Confirmation Car Base , Billimora and (iii) Maintenance Depots ( Vapi , Surat , Bharuch , Vadodara ) |
| 50 | Supply of H-shaped Steel Girders along with stiffeners( 175 x 175 x 7.5 x 11in mm.) of required lengths for Daily inspection tracks andSCC Sheds in Depot and Maintenance Depots and installation of the H-beam with fixing/drilling all required anchor bolts ,fastners,plates etc. as per the approved drawings and specifications in Solid-Bed Track. Fixing of H Beam with anchor bolts using non-shrink mortar & placing the sanein pedestal type concrete in pit lines , Maintenance Car shed track, SCC Shed Track , Wheel reprofiling Track etc., . Note: 175H & YW-2 Type Fastenings shall be supplied by IRCON at Store. Necessary Supports, Frames, Push Pull Props etc., required for fixing shall be arranged by Track Contractor. |
| 51 | Linking and Laying ofSolidBed Trackwith 50 Kg N Rail Section over concrete road bed in Gantry Rail Track, Maintenance Car Shed Track , Safety Car Conformation Shed Track in Maintenance Depots and in Wheel Re Profiling Track and Daily Inspection Track in Surat Depot. This item also includes preparation & casting of Concrete Bed & Grouting as per approved drawings and specifications with Contractors own machinery , GSF, labour tools & tackles , equipment , fuel , trolley , miscellaneousarrangements etc., complete as directed by IRCON. All the released materialshall be handed over to IRCONto designated store. Note: Required Fastenings shall be provided by IRCON at store |
| 52 | Laying & Linking of Solid Bed Track . |
| 53 | Laying & Linking Gantry Rail Track |
| 54 | Casting of Concrete Bed with min grade of concrete of M-35 or grade approved by the Engineer and thickness as per Drawings. This item includes grouting wherever required . |
| 55 | Welding of Rails with all required material as per the requirements specified in the Contract at (i) Surat Depot(ii) Safety Confirmation Car Shed on viaduct and at fuel filling track , Billimora and (iii) Maintenance Depots ( Vapi , Surat , Bharuch , Vadodara ). |
| 56 | Flash Butt Welding of JIS 50 Kg N/60 KgN Rails including compromise rails and finishing of weld to meet the prescribed tolerances and pass all stipulated tests, conforming to Technical Specifications of HSR/other technical Specifications mentioned in the contract for Flash Butt Welding of Rails with latest amendment, using IRCON\"s FBW Machine/self-propelled rail cum road / Mobile FBW Plants. Operation & Maintenance of the Machine, Tools/Tackles, equipment, Fuel and consumables shall be arranged by the Contractor at his own cost. Item also includes painting with anticorrosive paint as approved and marking of welded joints, Numbering as per Specifications, pre-straightening & post-straightening of panels and USFD testing of finished weld as per Specifications and directed by Engineer in-charge. Rate includes shifting of FBW Machine from One place/Depot to another with all Cranes, Trailors, Manpower etc., complete. |
| 57 | Alumino Thermic Welding of Rails JIS 50 Kg/60 Kg with all Materials, Tools, Tackles, Manpower, Fuel etc., complete at Depots/Maintenance Depots, SCC Base including USFD Testing. Welding Portion & Crucibles if arranged by IRCON, actual cost shall be deducted from the Unit Rate. |
| 58 | Supply and Installation ofTrack Sing Boards ; Fouling Marks ( FMs) , Stop Signboards for the Maintenance Car ; Rail Thermometers on Main Line ; Level Crossings at Surat Depot and Level Crossings at Maintenance Depots, Supply & Installation of Pit Coverat (i) Surat Depot(ii) Safety Confirmation Car Shed on viaduct and at fuel filling track , Billimora and (iii) Maintenance Depots ( Vapi , Surat , Bharuch , Vadodara ). |
| 59 | Supply & Erection of Gradient Post , Kilometer Post, Curve Post /Runoff Postof various intervals ofPer Km. , Per 500 m , Per 100 m , Per 10 m etc. ,. fixing the post in cement concrete foundation as per drawing with cement concrete mortar mix using 20mm hard aggregate, as directed by the engineer in charge. |
| 60 | Supply |
| 61 | Chainage Post Type-1 Per Km. |
| 62 | Chainage Post Type-2 Per 500m |
| 63 | Chainage Post Type-3 Per100m |
| 64 | Chainage Post Type-4 Per 10 m |
| 65 | Curve Post and Runoff Post (4 Nos Per Curve ) |
| 66 | Gradient Post (1 no. per gradient ) |
| 67 | Erection & Fixing. |
| 68 | Chainage Post Type-1 Per Km. |
| 69 | Chainage Post Type-2 Per 500m |
| 70 | Chainage Post Type-3 Per100m |
| 71 | Chainage Post Type-4 Per 10 m |
| 72 | Curve Post and Runoff Post (4 Nos Per Curve ) |
| 73 | Gradient Post (1 no. per gradient ) |
| 74 | Supply and fixing in position pre-cast cement concrete Fouling Mark as per approved drawing at station yard, duly painting the top surface and slopes with white enamel paint in two coats and inscribed letters with black of Fouling Mark, complete in all respects with all labour etc. |
| 75 | Fouling Mark ( For Turnout ) |
| 76 | Slow Down Indicator ( For Turnout ) |
| 77 | Stop Sign Maker ( For Turnout ) |
| 78 | Level Crossings - ( 5 m Length) |
| 79 | Misc Schedule ( Minor Items ) |
| 80 | Fixing buffer stopas per the approved drawings ,with all contractor’s labour, materials, tools, plants etc. and all lead and lift including crossing of track where necessary and as directed by Engineer in charge at site.( Buffer Stop Shall be provided by IRCON) |
| 81 | Buffer Stops -First Grade with Gravel. |
| 82 | Buffer Stops -First Grade without Gravel. |
| 83 | Buffer Stops -Second Grade. |
| 84 | Fixing of Calibration Rail (Provided by Interfacing Contractor) as per Technical Specifications at Surat Maintenance Depot with all Tools, Equipment etc., required for Rail Defect Detection Car |
| 85 | Transportation of Rails, TO Sets, EJ Sets from IRCON Store to Depots/Maintenance Depots |
| 86 | Level Crossings |
| 87 | Manufacturing, Supply, and installation of RIRI Type rubberized Level Crossings pads of approved quality and specifications at Railway Track by suitable clamping arrangements to make a rubberized road. The road surface is to be prepared by using multiple sets of rubber pads of the length of 1.20 m each and each set consists of 02 no’s rubber pads placed inside the running rail resting on the RCC edge beam. The item is inclusive of the RCC edge beam at the edge to retain the assembly as per the client/engineer approved drawings & specfications |
| 88 | Fabrication, Providing & Fixing Check Rail assembly with all Nut, Bolts, Washers, Joint Filler etc., as per approved drawings in Level crossings with all fittings and Fastenings. JIS 50 Kg N Rails shall be provided for fabrication by IRCON. Item shall include all costs till fixing & completion |