Rural Works Department has published Tender For Construction Of Bridge Work -Mmgsuy/23-24 Triveniganj/01. Submission Date for this Tender is 30-01-2024. Bridge Work Tenders in Patna Bihar. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Supaul Pipra Pakki road South of PathratoSupaul. Singherwar P.W.D. road via Mandal Tola. |
2 | Setting Out Pillars:- Providing & Fixing of Working benchmark Pillars 01 nos. per km& 04 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I |
3 | Refrence Pillars 04 Nos. Per Km |
4 | Clearing and Grubbing Road Land Clearing and Grubbing Road Land ( By manual means)including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees ofgirth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I ( By Manual Means) In area of non-thorny jungle |
5 | Scrarifying Existing Bituminous Surface to a Depth of 150 mm and disposal disposal of scrarified materials with a lift upto 3m and lead upto 1000m as per technical specification clause 301.4 |
6 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m & 100 m as per Technical Specification Clause 303.1.(Including Royality & Labour Cess). |
7 | WBM Grading 3 :-Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. |
8 | Prime Coat (Low Porosity) :- Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0kg/sqm using mechanical means as per Technical Specification Clause 502 |
9 | Tack Coat:- Providing and applying tack coat with Bitumen emulsion (RS-1)using emulsiondistributor at the rate of 0.25-0.30kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. |
10 | Bituminous Macadam :- Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over apreviously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction. |
11 | Semi-Dense Bituminous Concrete :- Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. |
12 | Construction OF Dry Lean Concrete Sub Base Over a prepared sub grade with coarse and fine aggregate conforming to IS 383 , the size of Coarse Agg. Not exceeding 25mm , agg. Cememt ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1 , cement content not to be less than 150kg/cm, opc to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant , trasported to site, laid with a paver with electronic sensor , compacting with 8-10 tonnes vibrartory roller, finishing and curing. |
13 | Panel Concrete Pavement-Construction of Panel concrete ,plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Caluse 1501.2.2 M 30(Grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding25mm, mixed in a concrete mixer ofnot less than 0.2 cum capasity and appropriate weigh batcher using approved mix design ,laid in approved fixed side formwork (steel channel,laying and fixing of 125 micron thick polythene film,wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion ,construction joints, applying debonding strips ,primer ,sealant ,dowel bars, near approaches tobridge/ culvert and construction joints, admixture as approved ,curing of concrete slabs for 14 days. Curing compound (where specified) and water finishing to lines andgrade as per drawing and Technical specification Clause 1501. PCC Grade M-30 EachPanel (0.50X0.50) thickness 100 mm |
14 | Ordinary Kilometer Stone (Precast) |
15 | 200 m stone (precast) |
16 | (I)Providing and Fixing "Logo" of MMGSUY Project :-Providing and fixing of typical MMGSUY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges.The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level.The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube.All M.S. will be stove enameled on both sides.Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour.All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 |
17 | Boundary Pillar/Gaurd Post :- Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704 |
18 | Rumble Strips : Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint. |
19 | 600 mm equilateral & triangle |
20 | 600 mm circular |
21 | 600 mm x 450 mm rectangular |
22 | 900 mm side octagon, OR |
23 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface :- Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. |
24 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Conctete Surface |
25 | Supplying and installation of delineators (Road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC- 79 and the drawings. |
26 | Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, planting the saplings, backfilling the trench, watering, fixing the tree guard and maintaining the plants for one year |
27 | Providing and laying of a reinforced cement concrete pipe duct,300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills,constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:981997,bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. |
28 | Parapet Construction Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 ( M25 ) |
29 | Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701 |
30 | GST @ 18% |
31 | Labour Cess @ 1% |
32 | Add Seigniorage Fee :-- |
33 | 1st Year Maintenance cost |
34 | 2nd Year Maintenance cost |
35 | 3rd Year Maintenance cost |
36 | 4th Year Maintenance cost |
37 | 5th Year Maintenance cost |
38 | GST @ 18% |
39 | Labour Cess @ 1% |
40 | Add Seigniorage Fee:-- |
41 | DeenapattitoBathnaha (Lohia Medical College ) |
42 | Benchmark Pillars 01 nos. per km |
43 | Refrence Pillars 04 nos. per km |
44 | Clearing and Grubbing Road Land Clearing and Grubbing Road Land ( By manual means)including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees ofgirth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I ( By Manual Means) In area of non-thorny jungle |
45 | Scrarifying Existing Bituminous Surface to a Depth of 150 mm and disposal disposal of scrarified materials with a lift upto 3m and lead upto 1000m as per technical specification clause 301.4 |
46 | Box Cutting :- Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 |
47 | Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet equirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5. |
48 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 100 m as per Technical Specification Clause 301.5 |
49 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m & 100 m as per Technical Specification Clause 303.1.(Including Royality & Labour Cess). |
50 | Granular Sub-base with Well Graded Material (Table 400.1) :- Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401. (For Grading I Material) |
51 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing thematerial with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, layingin uniform layers in sub-base/base course on a well prepared sub-base and compacting with smoothwheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. |
52 | Prime Coat (Low Porosity) :- Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0kg/sqm using mechanical means as per Technical Specification Clause 502 |
53 | Tack Coat:- Providing and applying tack coat with Bitumen emulsion (RS-1)using emulsiondistributor at the rate of 0.25-0.30kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. |
54 | Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over apreviously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction. |
55 | Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. |
56 | Ordinary Kilometer Stone (Precast) |
57 | 200 m stone (precast) |
58 | (I)Providing and Fixing "Logo" of MMGSUY Project :-Providing and fixing of typical MMGSUY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges.The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level.The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube.All M.S. will be stove enameled on both sides.Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour.All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 |
59 | Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade as per drawings and Technical Specification Clause 1701 |
60 | Boundry Pillar/ Guard PostReinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704 |
61 | 600 mm Equilateral & Triangle |
62 | 600 mm x 450 mm Rectangular |
63 | 900 mm side octagon, OR |
64 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface :- Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. |
65 | Planting of tree by the road side (Avenue Tree) in 0.6 m dia holes, 1 m deep dug in the Ground, Mixing the soil with decayed farm yard/ slug manure, planting the saplings back filling the trench, watering, fixing the tree guard & maintain the Plant for One Year. |
66 | Earth work in excavation of foundation trenches :-- Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitablematerial. |
67 | Sand Filling in Foundation :-- Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108 - rate as per item No. 11.2 (I) of Chapter 11 |
68 | Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 |
69 | Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 |
70 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204. ( M15 (PCC 1:2.5:5) |
71 | Plain/reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 |
72 | Providing RCC M25in Deck Slab :--Providing and laying reinforced cement concretein superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5 |
73 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications |
74 | Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per centbitumen by weight |
75 | Providingweep holes in abutement :-- Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing |
76 | Drainage spouts complete as per drawing and technical specifications Clause 1209. |
77 | Painting on Parapet Wall Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701 |
78 | Cable Duct Across the Road :- Providing and laying of a reinforced cement concrete pipe duct,300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills,constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:981997,bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. |
79 | GST @18% |
80 | L.C @1% |
81 | Seigniorage Fee |
82 | 1st Year Maintenance cost |
83 | 2nd Year Maintenance cost |
84 | 3rd Year Maintenance cost |
85 | 4th Year Maintenance cost |
86 | 5th Year Maintenance cost |
87 | GST @18% |
88 | L.C @1% |
89 | Seigniorage Fee |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail