Name of Work: ESTIMATE FOR EXCAVATION OF WHS -I(BIPODTARAN BAURI) at DUBERDANGA , JL.-5,PLOT NO.-336 NEW GENERATION WATERSHED WDC-PMKSY 2.0/2021-22,BANKURA(27 m X 15 m X3m)
Sl. No.
Item Description
1
Excavation in ordinary soil / mixed soil i.e. clay mixed with moorum, kankar, pebbles / silt dry or moist / slushy silt / sticky soil for WDS / WHS / RESERVOIR / SFMIS etc with hydraulic excavator of required bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirement of lines, grades and cross section and transporting to embankment/ disposal site within all lifts and lead upto 1500 m including spreading , leveliing disposed spoils at disposed area. ( mode of measurement : pre work and post work)(i ) Volume of earthwork of 1st layer upto 2.00m depth.From0.0 mtr to 2.00 mtr.
2
Excavation in gravel / moorum / kankar / compact moorum / very much weathered rock / sticky soil mixed with moorum or ghooting for WDS / WHS / RESERVOIR / SFMIS etc with hydraulic excavator of required bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirement of lines, grades and cross section and transporting to embankment/ disposal site within all lifts and lead upto 1500 m including spreading , leveliing disposed spoils at disposed area. ( mode of measurement : pre work and post work)(i ) Volume of earthwork of2nd layer upto 3.00m depth.From 2.00 mtr to 3.00mtr.
3
Excavation in soft weather rock / solt laterite rocks for WDS / WHS/RESERVOIR / SFMIS etc with hydraulic excavator of required bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirement of lines, grades and cross section and transporting to embankment/ disposal site within all lifts and lead upto 1500 m including spreading, leveliing disposed spoils at disposed area. (mode of measurement : pre work and post work)From 3.00 mtr to 4.00 mtr
4
Fine dressing the crest, side slope, dwarf bundh etc. including ramming etc. complete in all respect.
5
Cost of Signboard & Inlet, Outlet Pipes.
6
Inlet Outlet Pipes
7
Construction of Signboard (1.80m x 1.275m x 0.25m) incl. painting & lettering
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.