}

Workfor Releasing Of Ht And Lt New Service Connections In 33/11 Kv S/S, 20 No., Kashhipur And 132Kv S/S Campus, Kashipur Under Edsd, Kashipur (Town) Under The Head Nsc (Capital Plan, kashipur-Uttarakhand

Uttarakhand Power Corporation Limited-UPCL has published Workfor Releasing Of Ht And Lt New Service Connections In 33/11 Kv S/S, 20 No., Kashhipur And 132Kv S/S Campus, Kashipur Under Edsd, Kashipur (Town) Under The Head Nsc (Capital Plan. Submission Date for this Tender is 31-01-2024. Electrification Work Tenders in kashipur Uttarakhand. Bidders can get complete Tender details and download the document.




Tender Notice

41668222
Workfor Releasing Of Ht And Lt New Service Connections In 33/11 Kv S/S, 20 No., Kashhipur And 132Kv S/S Campus, Kashipur Under Edsd, Kashipur (Town) Under The Head Nsc (Capital Plan
Open Tender
Indian
Uttarakhand
kashipur
31-01-2024

Tender Details

Workfor Releasing Of Ht And Lt New Service Connections In 33 / 11 Kv S / S, 20 No., Kashhipur And 132Kv S / S Campus, Kashipur Under Edsd, Kashipur ( Town ) Under The Head Nsc ( Capital Plan-Supply Of Aluminium Crimping Lugs Of Size 25 Sq.Mm 3 Supply Of Aluminium Crimping Lugs Of Size 70 Sq.Mm 4 Supply Of Aluminium Crimping Lugs Of Size 120 Sq.Mm 5 Supply Of All Type Ms Clamp With N&B Pcc Pole 8.5 Mtr Long ( Ms Flate 50X6mm & 18M Dia Hole For 16X65mm Nut & Bolt As Per Respo Specification ) 6 Supply Of All Type Of Ms Clamp With N&B Stp Pole Sp33 / 55 / 72 ( Ms Flate 50X6mm & 18M Dia Hole For 16X65mm Nut & Bolt As Per Respo Specification ) 7 Supply Of Lt Shackle Insulator With One No Nut & Bolt 150X16 Mm Made Of Best Quality Pore Line And Without Defeets Isi Standard As Per Specification Of Upcl 8 Supply Of Stay Insulator 90X65 Mm 9 Supply Ofppclamp For Stp Sp 55 Pole ( As Per Respo Specification ) 10 Supply Of Clamps For Dead End For Suitable For Ab Cable ( As Per Specification & Drawing Of Upcl ) 11 Supply Of Ms Nut & Bolt 12 Supply Of Clamps For Suspension Clamps For Suitable For Ab Cable ( As Per Specification & Drawing Of Upcl ) 13 Supply Of Lt Insulator Pearcing Connector 120 / 95 Mm To 120 / 95 Mm. ( For Line To Line ) ( As Per Specification & Drawing Of Upcl ) 14 Supply Of Lt Insulator Pearcing Connector 25 / 15 Mm To 25 / 15 Mm. ( For Line To Line ) ( As Per Specification & Drawing Of Upcl ) 15 Supply Of Lt Bare Neutral Connectors Pg Clamp 95Sq Mm To25 Sq Mm ( For Line To Line ) ( As Per Specification & Drawing Of Upcl ) 16 Supply Of Dead End Clamps With I-Hook. ( As Per Specification & Drawing Of Upcl ) 17 Supply Of Suspension Clamps With I-Hook. ( As Per Specification & Drawing Of Upcl ) 18 Danger Board With Clamp 19 Labour Charges 20 Cartage Of St Pole And Pcc Poles From Store Center To Constructuin Site With Loading, Unloading At Both Points. ( Loading, Unloading Pluse Carriage Per Pole ) And Proper Stacking, Cartage Of Other Material ( Other Than Poles ) By Vehicle For Store Center To Nearest Construction Site Store Including Loading And Unloading At Both Ends & Cartages Of The Following Capacity Transformer From Store Center Construction Site With Loading And Unloading At Both Points. ( Loading, Unloaidng Plus Carriageof T / F ) ( 0-20 Km ) 21 Sp-21 / 23 22 Sp-33 23 Sp-55 24 Sp-72 25 Pcc Poles 26 Other Material In Weight 27 25 Kva 28 63 Kva 29 100 Kva 30 250 Kva T / F 31 Lt Prmc 32 11 Kv Prmc 33 Head Load Cartage Of Following Poles From Road To Site ( Rates Are Per Pole / Km ) & Head Load Cartage Of Small Materail. Rates Are Per Km / Quintal Including Loading And Unloading & Head Load Cartages / Maunal Shifting / Lifting With Crane / Hydra Of The Following Transformers Along With Loading / Unloading At Both Points ( The Rates Are Per Transformer / Km ) . ( 0-1Km ) From Dum Store To Pit Site. 34 Upto 0 To 1 Km 35 Sp-21 / 23 36 Sp-33 37 Sp-55 38 Sp-72 39 Pcc Poles 40 Other Material In Weight 41 25 Kva T / F 11 / 0.4Kv 42 63 Kvat / F 11 / 0.4Kv 43 100 Kvat / F 11 / 0.4Kv 44 250 Kva T / F 45 Lt Prmc 46 11 Kv Prmc 47 Excavation Of Earth For Pole Pit Of Size 0.9X0.6X1 / 6 Of Full Legth Of Pole For Erection Of Pole In All Type Of Soil Including Proper Dressing Of Sides And Ramming Of Bottom Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed Complete Work. 48 Additonal Digging Of Pole Pit Hard Cutting Rcc Block Etc. 49 Erection Of Following Single Support Pole In Prrpoer Level And Alignment As Per Resspo Construction Manual 50 Sp-21 51 Pcc Poles 52 Sp-23 53 Sp-33 54 Sp-55 55 Sp-72 56 Erection Of Following Double Support Pole In Proper Level And Alignment Alongwith Fixing Of All Accessories, Like Top Channel, X-Bracing & Clamps As Per Resspo Construction Manual. 57 Pcc Poles 58 Sp-23 59 Sp-33 60 Sp-55 61 Sp-72 62 Erection Of Following Four Pole Support In Proper Level And Alignment Alongwith Fixing Of All Accessories, Like Top Channel, X-Bracing & Clamps As Per Resspo Manual. 63 Sp-23 64 Sp-33 65 Sp-55 66 Sp-72 67 Grouting Of Pole In Size 0.45X0.45X1 / 9 Of The Support In Cc Ratio 1:4:8 ( 1 Cement : 4 Graded Stone 20 Mm Nominal Size : 8 Coarse Sand ) Block Including Cost Of Cement, Sand And Stone Ballast Back Filling Of Soil And Boulders In Pit And Ramming And Proper Alignment, Leveling As Per Resspo Construction Maual. 68 Muffing Of Poles Of Size 45Cm Above Ground Level With Cc Ratio 1:4:8 ( 1 Cement : 4 Graded Stone 10Mm Nominal Size : 8 Coarse Sand ) Block Including Cost Of Cement, Sand And Stone Ballast Back Filling Soil And Boulders In Pit And Ramming And Proper Alignment, Leaving As Per Resspo Construction Manual. 69 Fabrication Of M.S Channel Angle Iron After Cutting In Required Sized With Drilling Of Holes Upto Good Finish For Top Channel, Cracing And Special Type Bracket Etc. As Per Respo Sehedule And Local Approved Drawing. 70 Fixing Of Special Type Bracket 71 Fixing Of D-Type Bracket In L Line 72 Fixing Of Traingular Type Bracket In 11 Kv Line 73 Excavation Of Earth For Stay Pit Of Size 0.6X0.6X1.2Mtr In All Type Of Soil Including Proper Dressing Of Sides And Ramming Of Bottom Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed Complete Work. 74 Fixing Of Stay Clamps For Pcc Pole. 75 Fixing , Tightening And Nozzaling Of Stay With Pole And Stay Rod On Required Tension As Per Drawing / Resspo Manual. 76 Lt Stay 77 11 Kv Line 78 Grouting Of Stay In Size 0.6X0.6X0.3 In Cc Ratio 1:4:8 ( 1 Cement : 4 Graded Stone 20Mm Nominal Size : 8 Coarse Sand ) Block Including Costof Cemaent, Sand And Stone Ballast Back Filling Of Soil And Boulders In Pit And Ramming And Proper Alignment, Leveling As Per Resspo Manual. 79 Earthing Of Support With M.S. Earth Rod Of 2.5 Meter Long By Hammering Of M.S. Rod To Proper Depth And Connecting G.I. Wire As Per Construction Manual & Head Of The Earth Rod Should Be 30Cm Below The Ground Level. 80 Laying, Spreading, Stringing And Sagging Of 11 Kv Line In 3 Phase ( 3 Phase 4 Wire ) Of The Following Wire As Phase Wire With G.I. Earth Wire Complete Including Fixing Of All Accessories In 3 Nos. Conductor In Parallel With Binding And Jumpering As Per Profile And Profile And Sagging Chart. 81 Acsr Weasel 82 Acsr Rabbit 83 Acsr Dog 84 Laying , Spreading, Stringing And Sagging Of L.T. Lines Of Acsr Weasel As Phase Wire With G.I. Earth Wire Complete With Binding And Jumpering As Per Resspo Specn. 85 3 Phase 5 Wire Length 86 3 Phase 4 Wire Length 87 2 Phase 3 Wire Length 88 1 Phase 2 Wire Length 89 Guarding Of Line Over ( Telephone / Road / L.T Line Crossing As Per Drawing With 6 / 8 Swg Gi Wire Including Fixing Of Guarding Channel / Angle As Per Resspo Manual . Lt / 11Kv / 33Kv. 90 L.T. / 11Kv Line. 91 33Kv Line. 92 Laying And Erection Of L.T. Pvc Cable Including Crimping Of Lugs Of Size 1X70, 120, 150 Sq.Mm. 93 Mounting & Fixing Of Tpmo On Double Pole Structures Including Making Of Connections Complete Work 94 Mounting & Fixing Of Fuse Sets On Double Pole Structures Including Making Of Connections Of Complete Work 95 Mounting And Fixing Of Lighting Arrestor Set ( 3 Nos. ) On Double Pole Stucture Including Making All Connections By G.I. Strip Size 35X6mm To Earth Point Complete Work ( Excluding Cost Of G.I. Strip ) 96 Painting Of Poles With Angle And Channel And All Steel Part By One Coat Rod Oxide Primer And Two Coats Of Aluminium Paint And Two Strip Of Fluorescent Altemate Red And White Paint 30 Cm Wide Upto 1.5 Mtrs. From Ground Level. 97 St Pole Sp-72 98 St Pole Sp-55 99 St Pole Sp-33 100 St Pole Sp-23 / 21 101 Jointing And Fixing Of 11 Kv Cable Jointing Kits Indor / Outdoor Cable Boxes. 102 Dismantling Of Existing Transformer Etc. Including Disc Fitting, Insulator, Clamps, Nutt & Bolts And Consumer Connections Including Cartage Back From Site To Je Store 103 100 Kva 104 63 Kva 105 25 Kva 106 Installation / Mounting Of New Tranformer On Double Pole Structure And Fixing Of Channel / Angle Etc. And Making All Connections Of Ht And Lt Side And Its Cmplete Commissioning. 107 100 Kva 108 63 Kva 109 25 Kva 110 250 Kva 111 Route Cleareance By Cutting Of Tree Branches / Proning, Loping And Chopping Of Tree For L.T., 11 & 33 Kv Line. 112 T-Offconnection Complete 11 Kv 113 Providing And Fixing Of Danger Board And Number Plate Complete By Providing Clampsof M.S. Flat 35X5 Mm And Nuts & Bolts, Danger Boards Of M.S. Sheet 2 Mm Thick 11X7 Size ( Including Cost Of All Material ) 114 Laying Of Lt Service Cable From Pole To Consumer End Meter Alongwith Supporting 115 Digging Of Tench Of Size 0.60X0.15 X 0.9 Mtr And Laying Of Undergroundcable With Making Of Brick Housing And Filling Of Sand Including Filling Of Earth With Raining & Reparing Or Road Including Cost Of Cement Sand And Stone Blast 116 Digging Of Tench Of Size 0.60X0.15 X 1.5 Mtr And Laying Of Underground 11 Kv Xlpe Cable With Making Of Brick Housing And Filling Of Sand Including Filling Of Earth With Raining & Reparing Or Road Including Cost Of Cement Sand And Stone Blast 117 Making Of Section Pole For Existing Lt / Ht / 33Kv Line Complete In All Respect 118 Installation Of 11 Kvmetering Cubical 119 Installation Of Ltprmc 120 Fixing Of Gi Pipe Complete ( Size Pipe Dia 4 ) 121 Laying, Sagging & Binding Of Ab Cable Lt Line Complete. 122 Loading, Unloading & Carriage Of Lt Prmc From Store To Pit Site & Installation On The Double Pole With The Help Of Nut Bolt & Clamp And Making To Pass Lt Cable From T / F To Prmc. 123 Fixing Of Special Type Holding Clamps For J / Eye Hook 124 Laying Of 11 Kv Cable In 1.5 Mtr Depth With Suitable Trencheless Technology Including Laying In Trench With Proving & Fixing Of Hdpe Pipe Pe 80 N 6 & Having Dia 160 Mm Conferming To Is 4984 / 1995 & Having Thickness 9.1 To 10.3 Mm 125 Laying Of Ht Cable Xlpe 3X50mm, 3X70mm Xlpe And 3X150 Mm Xlpe Under Ground Complete As Per Respo

Key Value

Document Fees
INR 1180 /-
EMD
INR 45000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Workfor Releasing of HT and LT New Service Connections in 33/11 KV S/S, 20 No., Kashhipur and 132kv S/s Campus, Kashipur under EDSD, Kashipur (Town) under the Head NSC (Capital Plan).
Sl. No. Item Description
1Decentralized Material
2Supply of Aluminium Crimping Lugs of size 25 Sq.mm
3Supply of Aluminium Crimping Lugs of size 70 Sq.mm
4Supply of Aluminium Crimping Lugs of size 120 Sq.mm
5Supply of All Type MS Clamp with N&B PCC Pole 8.5 Mtr Long (MS Flate 50X6mm & 18m Dia hole for 16x65mm nut & bolt as per RESPO Specification)
6Supply of All type of MS Clamp with N&B STP Pole Sp33/55/72 (MS Flate 50X6mm & 18m Dia hole for 16x65mm nut & bolt as per RESPO Specification)
7Supply of LT shackle insulator with one no Nut & bolt 150x16 mm made of best quality pore line and without defeets ISI standard as per specification of UPCL
8Supply of Stay Insulator 90X65 mm
9Supply ofPPClamp for STP SP 55 Pole (as per RESPO specification)
10Supply of clamps for Dead End for Suitable for AB cable (As per Specification & Drawing of UPCL)
11Supply of MS Nut & Bolt
12Supply of clamps for Suspension clamps for Suitable for AB cable (As per Specification & Drawing of UPCL)
13Supply of LT insulator Pearcing connector 120/95 mm to 120/95 mm.(For line to line) (As per Specification & Drawing of UPCL)
14Supply of LT insulator Pearcing connector 25/15 mm to 25/15 mm.(For line to line) (As per Specification & Drawing of UPCL)
15Supply of LT Bare Neutral Connectors PG Clamp 95sq mm to25 sq mm (For line to line) (As per Specification & Drawing of UPCL)
16Supply of Dead End clamps with I-Hook. (As per Specification & Drawing of UPCL)
17Supply of Suspension clamps with I-Hook. (As per Specification & Drawing of UPCL)
18Danger Board With Clamp
19Labour Charges
20Cartage of ST Pole and PCC Poles from store center to constructuin site with loading, unloading at both points. (loading, unloading pluse carriage per pole) and proper stacking, cartage of other material (other than poles) by vehicle for store center to nearest construction site store including loading and unloading at both ends & cartages of the following capacity transformer from store center construction site with loading and unloading at both points. (loading, unloaidng plus carriageof T/F) (0-20 KM)
21SP-21/23
22SP-33
23SP-55
24SP-72
25PCC Poles
26Other material in weight
2725 KVA
2863 KVA
29100 KVA
30250 KVA T/F
31LT PRMC
3211 KV PRMC
33Head load cartage of following Poles from road to site (Rates are per pole/KM) & Head load cartage of small materail. Rates are per Km/ Quintal including loading and Unloading & Head load cartages/ maunal shifting/lifting with crane/hydra of the following transformers along with loading/unloading at both points (the rates are per transformer/Km). (0-1KM) from dum store to pit site.
34Upto 0 to 1 km
35SP-21/23
36SP-33
37SP-55
38SP-72
39PCC Poles
40Other material in weight
4125 KVA T/F 11/0.4KV
4263 KVAT/F 11/0.4KV
43100 KVAT/F 11/0.4KV
44250 KVA T/F
45LT PRMC
4611 KV PRMC
47Excavation of earth for pole pit of size 0.9x0.6x1/6 of full legth of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work.
48Additonal digging of pole pit hard cutting RCC block etc.
49Erection of following single support pole in prrpoer level and alignment as per RESSPO construction manual
50SP-21
51PCC Poles
52SP-23
53SP-33
54SP-55
55SP-72
56Erection of following double support pole in proper level and alignment alongwith fixing of all accessories, like top channel, X-bracing & clamps as per RESSPO construction manual.
57PCC Poles
58SP-23
59SP-33
60SP-55
61SP-72
62Erection of following Four pole support in proper level and alignment alongwith fixing of all accessories, like top channel, X-bracing & clamps as per RESSPO Manual.
63SP-23
64SP-33
65SP-55
66SP-72
67Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 (1 cement : 4 graded stone 20 mm nominal size : 8 coarse sand)block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO construction Maual.
68Muffing of poles of size 45cm above ground level with CC ratio 1:4:8 (1 cement : 4 graded stone 10mm nominal size : 8 coarse sand ) block including cost of Cement, sand and stone ballast back filling soil and boulders in pit and ramming and proper alignment, leaving as per RESSPO construction Manual.
69Fabrication of M.S Channel Angle iron after cutting in required sized with drilling of holes upto good finish for top channel, cracing and special type bracket etc. as per RESPO sehedule and local approved drawing.
70Fixing of special type bracket
71Fixing of D-type bracket in L line
72Fixing of traingular type bracket in 11 kv line
73Excavation of earth for stay pit of size 0.6x0.6x1.2mtr in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work.
74Fixing of stay clamps for PCC pole.
75Fixing , tightening and nozzaling of Stay with pole and stay rod on required tension as per drawing/RESSPO manual.
76LT stay
7711 KV line
78Grouting of Stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including costof Cemaent,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO Manual.
79Earthing of support with M.S. Earth rod of 2.5 meter long by hammering of M.S. Rod to proper depth and connecting G.I. wire as per construction manual & Head of the earth rod should be 30cm below the ground level.
80Laying, Spreading, Stringing and sagging of 11 KV line in 3 phase (3 phase 4 wire) of the following wire as phase wire with G.I. earth wire complete including fixing of all accessories in 3 Nos. conductor in parallel with binding and jumpering as per profile and profile and sagging chart.
81ACSR Weasel
82ACSR Rabbit
83ACSR Dog
84Laying , Spreading, Stringing and sagging of L.T. Lines of ACSR Weasel as phase wire with G.I. earth wire complete with binding and jumpering as per RESSPO Specn.
853 phase 5 wire length
863 phase 4 wire length
872 phase 3 wire length
881 phase 2 wire length
89Guarding of line over (Telephone/Road/L.T line crossing as per drawing with 6/8 SWG GI wire including fixing of guarding channel/angle as per RESSPO manual . LT/11KV/33KV.
90L.T./11KV Line.
9133KV Line.
92Laying and erection of L.T. PVC Cable including crimping of lugs of size 1x70,120, 150 Sq.mm.
93Mounting & Fixing of TPMO on double pole structures including making of connections complete work
94Mounting & Fixing of Fuse sets on double pole structures including making of connections of complete work
95Mounting and Fixing of Lighting arrestor set (3 Nos. ) on double pole stucture including making all connections by G.I. strip size 35x6mm to earth point complete work (excluding cost of G.I. Strip)
96Painting of poles with angle and channel and all steel part by one coat Rod Oxide Primer and two coats of aluminium paint and two strip of fluorescent altemate Red and White paint 30 Cm wide upto 1.5 Mtrs. From ground level.
97ST Pole SP-72
98ST Pole SP-55
99ST Pole SP-33
100ST Pole SP-23/21
101Jointing and Fixing of 11 KV cable jointing Kits indor / outdoor cable boxes.
102DIsmantling of existing Transformer etc. including disc fitting, Insulator, clamps, Nutt & Bolts and consumer connections including cartage back from site to JE store
103100 KVA
10463 KVA
10525 KVA
106Installation / mounting of new Tranformer on double pole structure and fixing of channel / angle etc. and making all connections of Ht and LT side and its cmplete commissioning.
107100 KVA
10863 KVA
10925 KVA
110250 KVA
111Route cleareance by cutting of tree branches / proning, loping and chopping of tree for L.T., 11 & 33 KV line.
112T-offConnection Complete 11 KV
113Providing and fixing of Danger Board and number plate complete by providing clampsof M.S. Flat 35x5 mm and Nuts & Bolts, danger Boards of M.S. Sheet 2 mm Thick 11"x7" size (Including cost of all material)
114Laying of LT service Cable from pole to consumer end meter alongwith supporting
115Digging of tench of size 0.60x0.15 x 0.9 mtr and laying of undergroundcable with making of brick housing and filling of sand including filling of earth with raining & reparing or road including cost of cement sand and stone blast
116Digging of tench of size 0.60x0.15 x 1.5 mtr and laying of underground 11 KV XLPE cable with making of brick housing and filling of sand including filling of earth with raining & reparing or road including cost of cement sand and stone blast
117Making of section pole for existing LT/HT/33KV line complete in all respect
118Installation of 11 KVmetering cubical
119Installation of LTPRMC
120Fixing of GI pipe complete (size pipe Dia "4")
121Laying, sagging & binding of AB cable LT line complete.
122Loading, unloading & carriage of LT PRMC from store to pit site & installation on the double pole with the help of nut bolt & clamp and making to pass LT cable from T/F to PRMC.
123Fixing of special type Holding clamps for J/Eye hook
124Laying of 11 KV cable in 1.5 mtr depth with suitable trencheless technology including laying in trench with proving & fixing of HDPE pipe PE 80 N 6 & having dia 160 mm conferming to IS 4984/1995 & having thickness 9.1 to 10.3 mm
125Laying of HT cable XLPE 3x50mm, 3x70mm XLPE and 3x150 mm XLPE under ground complete as per respo
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail