}

Tender For Construction Of Arjunpurva To Aurangabad Dalchand Link Road (Including 5 Year Maintenance Cost) Under Ridf Scheme In Year 2023-24, kanpur-Uttar Pradesh

Public Works Department-PWD has published Tender For Construction Of Arjunpurva To Aurangabad Dalchand Link Road (Including 5 Year Maintenance Cost) Under Ridf Scheme In Year 2023-24. Submission Date for this Tender is 20-01-2024. Road Work Tenders in kanpur Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

41621391
Tender For Construction Of Arjunpurva To Aurangabad Dalchand Link Road (Including 5 Year Maintenance Cost) Under Ridf Scheme In Year 2023-24
Open Tender
Indian
Uttar Pradesh
kanpur
20-01-2024

Tender Details

Tender For Construction Of Arjunpurva To Aurangabad Dalchand Link Road ( Including 5 Year Maintenance Cost ) Under Ridf Scheme In Year 2023-24

Key Value

Document Fees
INR 3671 /-
EMD
INR 561000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work :Construction of Arjunpurvato Aurangabad Dalchand Link Road(including 5 year maintenance cost) – Under RIDF Scheme in Year 2023-24
Sl. No. Item Description
1Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201.
2Construction of embankment with machnicaly compacted earth with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Engineer-in-charge as per MORD clause 3.4 (MORD 301.5). (MORD-(3.4)
3Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavatorat OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per Technical Specification Clause 401. (MORD 4.1) (A) By Mix in Place Method
4Providing, laying, spreading and compacting stone aggregates of specific sizes (45 - 63 mm gauge) to water bound macadam (WBM-2) as Levelling Coat specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per MORD per Technical Specification Clause 405 (MORD 4.7) (2) (a) by Manual Means
5Providing, laying, spreading and compacting stone aggregates of specific sizes (22.4-53 mm guage) to water bound macadam (WBM-3) specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per MORD Technical Specification Clause 405. (MORD 4.7) (3) (a) by Manual Means
6Edging with M-150 Class Bricks, Laid dry lengthwise, including excavation, refilling consolidation, with a hnad packing and spreading nearly surplus earth within a lead of 50 meter including cost of bricks, labour, T&P etc. required for proper completion of the work. (MORTH 11.15)
7Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per MORD Technical Specification Clause 502 (MORD 5.1)
8Providing and applying tack coat with Bitumen (VG-10)using bitumen pressure distributor at the rate of 0.35 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MORD Technical Specification Clause 503. (MORD 5.2)
9Providing, laying and rolling of open-graded Premix Carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen (VG-10) to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in suitable plant, laying and finishing and compaction with three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by Seal Coat "Type-C" as per MORD Technical Specification Clause 508 (MORD 5.9) Case-II By Mechanical Means (i) Bitumen VG 10
10Providing and laying Seal Coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using "Type-C" as per Technical Specification Clause 510 (MORD 5.12) (B) By Mechanical Means Case-III : Type C (i) Bitumen VG 10
11Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (MORD 3.14).
12Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3. (MORD 3.5(iii)
13Providing concrete for plain (1:3:6) concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (M-10) (MORD 11.4) (i) P.C.C grade M 10
14Brick masonry work (1:4) in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 (MORD 11.5) (ii) Brick masonry in 1:4 cement mortar
15Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204 (MORD 12.2)
16Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granularmaterial in single row includingfixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. (MORD 9.3 (B) 1000 mm dia
17Providing and laying Cement Concrete Pipe NP3 (burried conduits) on first class bedding of granular material including fixing collar with cement sand mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonary work in head wall and parapet (MORD 9.7) 500 mm dia
18Providing and fixing of hectometere stone as per IRC-8 including painting and letter writing etc as per direction of E/I. (Hm -stone)
19Providing and fixing of kilometere stone as per IRC-8 including painting and letter writing etc as per direction of E/I.(Km -stone).
20Providing and erecting direction and place indentification retro-reflectroised sign as per IRC-67 made of high intensity grade sheeting vide clause 801.3 fixed over almuminium sheeting,2 mm thickwith area not exceeding 0.9 sqm.Supported on a mild steel single angle iron post 75 x75 x6 mm firmly fixed to the ground by means of property designed foundation with M-15 grade cement concrete 45x45x60 cm,below ground level as per approved drawing,Complete.(90x90 cm)
21Maintenance of bituminous surface road and gravel or WBM road including filling pot holes and patch repair etc. restoration of rain cuts and dressing of side sloop / berms, making up of berms shoulders, maintenance of drain, maintenance of culvert, maintenance of guard rails and parapet, maintenance of road signs, speed breakers, standing tree at adjacent to road wherever required, maintenance of Hectometer and Kilometer stone cutting of branches of tree, shrub and trimming of grass and weeds etc., white washing of parapet including CD work, painting of guard stone, refixing of displaced guard stone as per performance index Annexure-1 mentioned in GO No. 55/2022/187/23-7-2022-02 Nabard/2021 Dated 28.04.2022 & Enc Letter No. 14 BDD-1 (NH)/40 MT-11/2024 dated 03.01.2024 subjected to approval from Govt. Maintenance of 1st Year after completion of work @ Zero % of cost of construction of work / BOQ.
22Item No.21 but Maintenance of 2nd Year after completion of work @ 1.00% of total Work amount of item 1 to 20.
23Item No.21 but Maintenance of 3rd Year after completion of work @ 1.50% of total Work amount of item 1 to 20.
24Item No.21 but Maintenance of 4th Year after completion of work @ 2.00% of total Work amount of item 1 to 20.
25Item No.21 but Maintenance of 5th Year after completion of work @ 3.00% of total Work amount of item 1 to 20.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail