| 1 | Clearing shrub jungle uprooting stumps and small bushes and trees below 1m girth on premeasurementrequired etc. with supply of all labour and T&P required for the work etc. complete in all respect as directed by the Engineer-in-Charge. |
| 2 | Dismantling brick or stone masonry in lime or cement mortar for all height including stacking the useful materials for reuse and removing the debris within all lead and lifts including all labour & T&P materials required for the item etc. complete as directed by the Engineer-in charge. |
| 3 | Dismantling and removingcement concrete for all height including stacking the useful materials for reuse and removing the debris within all lead and lifts including all labour & T&P materials required for the item etc. complete as directed by the Engineer-in charge. |
| 4 | Earth work in excavation of foundation in all kinds of soil with all leads and lifts including dressing and leveling the bed of foundation to proper slope and level and making it fit for laying concrete including depositing the excavated materials clear of work site with all leads, lifts and delifts etc. complete including dewatering from foundation if required etc. with supply of all labour and T&P required for the work etc. complete in all respect as directed by the Engineer-in-Charge. |
| 5 | Filling in foundation & plinth with sand well watered and rammed in layers of 23.5cm thick including cost, conveyance of materials and supply of all labour,taxes as per prvailing norm and T&P, dewatering if required for the work etc. complete and as directed by Engineer-in-charge. |
| 6 | Cement concrete M 15 grade with crushed granite 20mm down graded coarse aggregate of approved quality mixing by concrete mixer including hoisting, lowering & laying concrete in position to proper slope and level & compacting by vibrator in layers not exceeding 0.15mdepth & finishing the exposed surfacesmooth including watering, curing for required period including cost, conveyance, royaltyall materials labour, T & P materials required for this item including hire and running charges of machineries complete as directed by the Engineer-in-charge. |
| 7 | RCC M 20 grade with crushed granite 20mm down graded coarse aggregate of approved quality mixing by concrete mixer including hoisting, lowering & laying concrete in position to proper slope and level & compacting by vibrator in layers not exceeding 0.15mdepth & finishing the exposed surfacesmooth including watering, curing for required period including cost, conveyance, royaltyall materials labour, T & P materials required for this item including hire and running charges of machineries complete as directed by the Engineer-in-charge. |
| 8 | Supplying, fitting and placing uncoated HYSD bar reinforcenment in position as per approved design & specification including cost, conveyance, royaltyof binding wires of 18 to 20 gauge and M.S. Rods complete in all respect with supply of all labour and T&P required for the work etc. complete in all respect as directed by the Engineer-in-Charge. |
| 9 | Providing rigid shuttering with the box type steel shuttering plates with keys for intermediate construction joints in rafts of weirs, barrages, and dam blocks including cost of materials,labour ,T&P etc. complete as directed by the Engineer-in-charge. |
| 10 | Providing rigid smooth centring and shuttering for mass concrete in column base and footing wall including cost of materials,labour ,T&P etc. complete as directed by the Engineer-in-charge. |
| 11 | Filling the foundation and plinth with excavated earth including watering and ramming properly,with cost of alllabour, t&p reqd. for the item complete and as directed by the Er. In charge. |
| 12 | Providing weep holes in Brick masonary / plain / Reinforced Concrete aboutment, wingwall / Return wall with 50mm dia P.V.C pipe, extending through the full width of the structure with slope of 1 v : 20 H to-wards drawing face etc. complete as per drawing and technical specification. |
| 13 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil including stony earth, gravel and moorum etc. interspread with boulders up to 1/2 cum size with alllifts and delifts including dressing of slopes and bed to design level & section ( benching& stripping of Dam )and depositing the excavated materials away from the work site with ll lead & lifts as per the specificationfrom the place of excavation with supply of all labour, all taxes as per norm, construction & maintaining haul roads required for the work etc. complete as directed by the Engineer-in-charge.(Measurement will betaken on the finished level section ) |
| 14 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil including stony earth, gravel and moorum etc. interspread with boulders up to 1/2 cum size with alllifts and delifts including dressing of slopes and bed to design level & section ( benching& stripping of Dam )and depositing the excavated materials away from the work site within four KM lead & lifts as per the specificationfrom the place of excavation with supply of all labour, all taxes as per norm, construction & maintaining haul roads required for the work etc. complete as directed by the Engineer-in-charge.(Measurement will betaken on the finished level section ) |
| 15 | R.S dry packing in appron and revetments & slopes of dam and dyke with h.g stone15 to 30 cm size with departmental stone including filling the interstices with small stone to proper slope and level with cost, conveyance, rayality and other taxes of all materials , labour and T&P required for the item complete as directed by the Engineer in charge.(1/6 voids volume will be deducted from the quantity) |
| 16 | Ramming or rolling earth work with light H.R.R in embankment in layers not exceeding 0.30m with all materials labour, T & P materials required for this item complete as directed by the Engineer-in-charge. |
| 17 | Collecting, Providing, Supplying, Stacking for premeasurement & Speading moorum and consolidation with HRR including watering, cost of moorum and conveyance of moorum etc complete required for the item as per direction of Engineer incharage |
| 18 | Supplying, Layingand fixing 150mm dia RCC hume pipes of approved qualityfor outlets including cost, conveyance ofpipes to the work site with cost of all other materials and supply of all labour and T&P required for the work etc. complete in all respect as directed by Er. In charge |
| 19 | Earth work in ordinary soil with all leads, lifts and delifts includingdressing and levelling the bed to the design profileas per direction of the Engineer-in-charge. |
| 20 | Earth work in hard soil with all leads andlifts including rough dressing and breaking clods to maximum 5 cm to 7cm , laying in layers not exceeding 0.30m in depth etc completed as per the direction of Engineer in charge. (Measurement will betaken on the finished level section and 12.5 voids volume will be deducted towards settlement of earth in filling section ) |