Tender For Repair/Maintenance Of Cooling Appliances At Afs Amla, Betul-Madhya Pradesh

Military Engineer Services-MES has published Tender For Repair/Maintenance Of Cooling Appliances At Afs Amla. Submission Date for this Tender is 08-02-2024. Air Conditioner Tenders in Betul Madhya Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

41596274
Corrigendum : Tender For Repair/Maintenance Of Cooling Appliances At Afs Amla
Open Tender
Indian
Madhya Pradesh
Betul
08-02-2024

Tender Details

Tender For Repair/Maintenance Of Cooling Appliances At Afs Amla

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 27-Jan-2024 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 03-02-2024
2 03-Feb-2024 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 08-02-2024

Key Value

Document Fees
INR 500 /-
EMD
INR 29800.0 /-
Tender Value
INR 14.90 Lakhs /-

BOQ Items

Name of Work: REPAIR/MAINTENANCE OF COOLING APPLIANCE AT AFS AMLA.
Sl. No. Item Description
1Overhauling and Servicing ofsplit type ACs 1.5 TonTon capacity of any make and carry out of following tasks at different location of different establishment including taking down the A/C from existing location, refixing / commissioning and testing the same after overhauling complete including the following :- (a) Inspection taking down, opening (dismantling) washing the condensor and cooling coil complete with chemical followed with pressurized water jet complete as required and cleaning with air blower and testing complete (b) Checking / examine operation of condensor, blower motor, cooling coil and checking the air circulation to ensure complete movement of working part trouble free (c) Inspection of leakage in system (cooling) and removal obstruction if any (d) Checking and correction earth continuity of electric items (e) Checking servicing thermostat and over load and other spares and test its functioning (f) Inspecting all electrical connection and remove if any defects (g) Checking servicing and greasing oiling of blower motor (g) Checking the functional of electronic remote control unit to ensure satisfactory functioning of unit complete all as specified and as directedby Engr-in-Charge. Note: 1-The contractor will send his rap to this office to collect the complaint regarding AC complaint comming from the user day to day. 2-The contractor will depute a skilledmech of refrigeration and air conditioning for proper maintenance of cooling appliances and day to day complaint regarding ACs, water cooler,Refrigerator, Desert cooler etc. 3- Any work regarding AC/Water Cooler/Refrigerator/Deep freezer and desert cooler will be done by skilled machenic who has the working experience of refrigeration and cooling appliances.
2All as per item No.1 here in before but for Split type Air Conditioner up to 2.0 Ton.
3Shifting of Air Conditioner of any type and make, up to 2 TR from existing location to other location and, Installingindoor and outdoor units of split type AC & window type ACat the locations as directed including provision of necessary brackets (L type) clamps, GI nuts, bolts and washers etc for fixing of indoor/ outdoor units/ window type AC including complete servicing leaktesting and commissioning and making good disturbed surface all as specified & directed at site . Note : PVC pipe protection/ drain pipe/ control cable, extra copper tubing of any sizefor suction/discharge will be measured and paid separately. Connecting up, topping up of refrigerant gas. Nitrogen pressure test to find out leakage, commissioning and testing complete all as specified & directed. Note : Gas charging will be measured and paid only once in throughout contract period after repetitive leakage/topping.
4Supply and fixing in replacementrotary compressor sealed unit suitable for 1.5 ton split AC suitable for working on 230 V 50Hz including necessary welding/bracing work to existing refrigerant pipes, supply & charging refrigerant gasR22 of required quantity including testing on full load complete all as specified and directed by Engr-in-Charge. Make- Blue Star/LG/ Voltas
5Supply and fixing in replacement rotary compressor sealed unit suitable for 2 ton split type AC suitable for working on 230 V 50Hz including necessary welding / bracing work to existing refrigerant pipes, supply & charging refrigerant gasR22 of required quantity including testing on full load complete all as specified and directed by Engr-in-Charge. Make- Blue Star/LG/Voltas
6Supply only the spares incorporated during the routine maintenance/ repairs/servicing of Air conditioner SplitAC 1.5/2 TR vide Sl Item No. 1 & 2 herein before.
7Dual Capacitor Starting & running 45 / 50 MFD capacity 25 / 085 / 21 MPP SH Make : KELTRON / INCAP/TIBCON / EPCOS
8Supply only running capacitor 36/6 MFD 440VAC. Make : Havells/Amcap/Epcos
9Supply only Relays for Split type AC 1.5 ton / 2.0 ton.
10Supply only running capacitor 45/(+-) 2.5 MFD 440 VAC. Make : Havells/Amcap/Epcos
11Supply only running capacitor 50/6 MFD 440VAC. Make : Havells/Amcap/Epcos
12Supply only running capacitor 50/(+-) 4 MFD 440 VAC. Make : Havells/Amcap/Epcos
13Supply only Starting Capacitor of 80 / 100 mfd for Split type AC 1.5 ton / 2.0 ton.
14Supply only Starting Capacitor of 100 / 120 mfd for Split type AC 1.5 ton / 2.0 ton.
15Supply only Remote Control and Supply & fix Remote Control with cord wire for Split type AC 1.5 ton / 2.0 ton.
16Supply only Air filter for Split type 1.5 ton / 2 ton.
17Suppply only capillary tube and strainer for split AC 1.5/2 TR
18Taking down the unserviceable IDU blower motor and supply and fix IDUblower motor capacity as per existing make all as directed at site for 1.5 TR split AC.
19Taking down the unserviceable IDU blower motor and supply and fix IDUblower motor capacity as per existing make all as directedat site for 2.0 TR split AC.
20Taking down theunserviceable condenser fan blade of (size 3"X8") and supply and fix Condenser fan blade as per existing make all as directed for1.5 TR split AC.
21Taking down theunserviceable condenser fan blade of (size 3"X8") and supply and fix Condenser fan blade as per existing make all as directed for2.0 TR split AC.
22Taking down the unserviceable condenser fan motor and supply and fix condenser fan motoras per existing make all as directed for 1.5 TR split AC.
23Taking down theunserviceable condenserfan motor and supply and fix condenser fan motor as per existing make all as directed for 2.0 TR split AC.
24Material and labour for removing the Split type Air conditioner outdoor unit/indoor unit from installed position leak testing & arrestingthe leakages in condensercoil by brazing or fixing the brass valve of same size and capacity in existingACs etc complete for Split type AC1.5 ton / 2.0 ton all as specified and directed at site by Engr-in- charge. Note :- Gas Charging shall be mesasured and paid separately under relavent item
25Supply and laying in replacement of refrigerant line copper tubing of size 5/8" with clamping on wall surface or concealed with both the ends connection or fixing by brazing as in repair complete all as specified and as directed by Engineer-in-charge.
26Supply and laying in replacement of refrigerant line copper tubing of size 3/8" with clamping on wall surface or concealed with both the ends connection or fixing by brazing as in repair complete all as specified and as directed by Engineer-in-charge.
27Supply and laying in replacement of refrigerant line copper tubing of size 1/2" with clamping on wall surface or concealed with both the ends connection or fixing by brazing as in repair complete all as specified and as directed by Engineer-in-charge.
28Supply and laying in replacement of refrigerant line copper tubing of size 1/4" with clamping on wall surface or concealed with both the ends connection or fixing by brazing as in repair complete all as specified and as directed by Engineer-in-charge.
29M&L for insulation to copper tubing of size (5/8") of split type AC of cap 1.5 TR/2.0 TR with heavy duty rubber foam insulation as per existing density and thermal conductivity including packing material and pvc tie complete all as specified and directed by Engr-in-Charge.Make- Armaflex / Aeroflex/Thermobreak
30M&L for insulation to copper tubing of size (1/2") split type AC of cap 1.5 TR/2.0 TR with heavy duty rubber foam insulation as per existing density and thermal conductivity including packing material and pvc tie complete all as specified and directed by Engr-in-Charge.Make- Armaflex / Aeroflex/Thermobreak
31M&L for insulation to copper tubing of size (1/4") split type AC of cap 1.5 TR/2.0 TR with heavy duty rubber foam insulation as per existing density and thermal conductivity including packing material and pvc tie complete all as specified and directed by Engr-in-Charge.Make- Armaflex / Aeroflex/Thermobreak
32Removing existing unserviceablefan motor of Condenser of Splittype AC & rewinding of fan motor with suitable size of super enamelled copper winding wire etc complete for Split type AC 1.5 ton / 2.0 ton.
33Taking out the AC Manager from position after bypassing the power supply to split ACs, servicing the load manager for pro switching on / offtwo Nos split ACs. Note : Spares shall be measured and paid separately.
34S&F in replacement of Copper Condenser coil unit complete suitable for 1.5 Ton window type AC including R-22 refrigerant gas charging and welding/bracing work etc of existing model & make at site complete all as specified and directed by Engr-in-Charge.
35S&F in replacement of Copper Condenser coil unit complete suitable for 2 Ton split type AC outdoor unit including R- 32 refrigerant gas charging and welding/bracing work etc of existing model & make complete all as specified and directed by Engr-in-Charge.
36Supply and fix in repair indoor unit for 1.5 TR split type AC with copper coil, temperature display with all accessories like blower motor, blower, PCB, remote, etc. complete all as directed at site. [Make: Blue Star/ Carrier/ Voltas/ Hitachi]
37Supply and fix in repair indoor unit for 2 TR split type AC with copper coil, temperature display with all accessories like blower motor, blower, PCB, remote, etc. complete all as specified and as directed by Engr-in- Chargeat site. [Make: Blue Star/ Carrier/ Voltas/ Hitachi]
38Supply and fixing in repairswing motor for split ac (1.5 to 2 ton) with necessary accessories.
39S&F in repairs of electronic circuit board PCB (Multi PCB-AC) suitable for window/split type AC indoor unit of 1.5 ton ACcapacity as per the existing model & make complete all as specified and directed by Engr-in-Charge.
40S&F in repairs of electronic circuit board PCB (Multi PCB-AC) suitable for window/split type AC indoor unit of 2 ton AC capacity as per the existing model & make complete all as specified and directed by Engr-in-Charge.
41M & L for repairing of PCB of split / window AC of 1.5 / 2 Toncapwith change of necessary spare parts such as diode, triode, transformer,sensor etc items as required and as directed by Engineer -in-charge.
42S&F in repairs of PVC insulated and sheathed multistrandedround copper conductor cable 3 core of size 4 sqmm dia for external connection of AC & voltage stabilizer complete all as specified and directed by Engr-in-Charge. Make: Havells/ Plaza/Finolex
43S&F in repair of PVC insulated and sheathed multistranded copper conductorround cable 3 core of size 2.5 Sqmm dia for external connection of water cooler, Refrigerator & voltage stabilizer complete all as specified and directed by Engr-in-Charge. Make : Havells/ Plaza/Finolex
44S&F in repair brass valve1/4" suitable for existing split AC of cap 1.5/ 2.0 TR complete all as directed.
45S&F in repair brass valve1/2" suitable for existing split AC of cap 1.5/ 2.0 TR complete all as directed.
46S&F in repair brass valve 5/8" suitable for existing split AC of cap 1.5/ 2.0 TR complete all as directed.
47S&F in repair brass valve 3/8" suitable for existing split AC of cap 1.5/ 2.0 TR complete all as directed.
48Supply and fixing PVC/ Rubber flexible pipe 15 mm dia medium grade including all accessories for drain out pipe all as directed.
49Material and labour for servicing Deep freezer upto 310/325 Lts capacity complete with cleaning condenser coilwith air blower, wet servicing of condenser coil unit with caustic soda etc, replacement of sheet metal screws wherever necessary, checking and rectifying the wiring defects, proper setting of thermostat & other electrical/ Refrigerent controls, connecting up all connections and testingall as directed.
50Taking out Unserviceable / burnt out sealed compressor Unit from Deep freezer, Supply & replacement factory sealed compressor unit, connecting with copper piping by braziing & Copper tubing etc complete 310/325 Lts capacity. Notes:- (i) Sealed compressor unit shall be replaced with existing capacity/Make. (ii) Gas Charging shall be mesasured and paid separtely under relavent item
51S&F in repair fan motor suitable for existing deep freezer 310 / 325 ltr cap complete all as directed.
52Repair/servicing of desert cooler of capacity upto 3000/4000 CFM by dismantling the fan, motor, pumps etc., including checking up/ rectification of wire connections, replacement unserviceable parts & accessories, cleaning of the water tank, replacement of piping system, reassembling,painting one coat of synthetic enamel paint over a coat of red(inner side of the desert cooler) oxide /primer after rubbing the rust with hammery paper and connecting up and testing complete all as specified and directed. Note :- (i) Cost of spare parts replaced during the process of repair/servicing shall be measured and paid separately as supply only under relevant item herein after. (ii) Labour charges for replacement of spares parts if any required during repair/ servicing deemed to be included in the quoted rate.
53S&F in replacement of Electric motor for fan 18" / 20" sweep, single phase 3 speed 100% water resistance, 100% dust proof withstand, voltage fluctuation 170 V - 270 V, rust proof totally enclosed with double ball bearing 900-1400 RPM, electric connection with copper cable of appropriate gauage including dismantling of unserviceable electric motor complete all as specified and as directed by Engineer-in-charge
54S&F in replacement of submersible pump 230 volts single phase suitable for desert cooler of cap 3000 CuM / Hr to 4000 CuM / Hr complete all as specified and as directed by Engineer-in-charge
55S&F in replacement of wood wool pad (set of 03 Nos) heavy duty suitable for desert cooler of cap 3000 CuM / Hr to 4000 CuM / Hr complete all as specified and as directed by Engineer-in-charge
56S&F in repair fan blade for desert cooler of suitable size complete all as directed at site.
57S&F in repair mounting bracket for fan motor with nut and bolts etc of D/cooler complete all as directed.
58S&F in repair Capacitor for 2.5/4MFD
59S&F in repair Capacitor for 5/6 MFD.
60S&F in repair 3 Pin plug top 15/16 amp
61S&F in repair 3 Pin plug top 5/6 amp
62S&F in repair MCB Single pole 20 amp. Make : Havells/Anchor/ L&T
63S&F in repair MCB Single pole 16 amp. Make : Havells/Anchor/ L&T
64Supply and fix single pole and neutral enclosure with a two pin and earth plug top and socket complete with one single pole MCB of capacity20 to 32 A. Make : Havells/Anchor/Legrand
65Repair/ replacement of 1.5 sqmm roundthree core flexible copper cable of length3 RM with 5/6 amps plug top for connection of desert cooler all as specified and as directed at site.Make : Havells/Anchor/ L&T
66Repair/ replacement of 2.5 sqmm roundthree core flexible copper cable of length3 RM with 15/16 amps plug top for connection of desert cooler/ water cooler/ fridgeall as specified and as directed at site.Make : Havells/Anchor/ L&T
67Material and labour for servicing of Window type AC and taking out theACfrom its existing position/location, shifting the same, servicing thecondenser and cooling coil withblower, cleaning the coils with caustic soda, replacement of sheet metal screws wherever necessary applying oil in fan motor bushes checking and rectifying the wiring defects, proper setting of thermostat & other electrical/ Refrigerant controls, cleaning the air filter, re-installing in its original position, connectingup all connections and testingall as directed for Window type Air Conditioner of1.5 Ton. Note : Gas Charging shall be measured and paid separately under relevant item of this schedule.
68All as per item No.55 here in before but for Window type Air Conditioner 2.0 Ton
69Taking out burnt / unserviceablesealed compressor Unit from Window type air conditioner, Supply &replacement factory sealed compressor unit, connecting refrigeration system after thorough flushing out the system with dry nitrogen, leak testing with nitrogen, vaccumising including neccessery brazing and welding arresting leakages and gas charging with refrigerant gas, testing, re-installing in its original position/location connecting up all electrical connections, testing the complete unit all asdirected for Window type Air Conditioner 1.5 Ton. Notes:– (i)  Factorysealed compressor unit shall be of existing capacity and make. (ii) Gas Charging shall be measured and paid separately under relevant item of this schedule.
70All as per item No.57 here in before but for Window type Air Conditioner 2.0 Ton
71Material and labour for removing the Window type Air conditioner from installed position leak testing and arresting the leakages in condensor/evaporator coil by brazing etc and refixing complete for window type ACof1.5 ton / 2.0 ton Capacity
72Material and labour for charging of refrigerant gas R-22 to the Window type Air conditioner, water coolers, Refrigerator,deep freezer and Split type air conditioner after vaccumisingthe complete system& pressure test with nitrogen to ensure complete system leak proof, testing of air conditioners, water coolers,refrigerator & deep freezer for proper functioning & cooling effect to the entire satisfaction of Engineer in ChargeNote:- contractor has to refill the gas without any additional payment in case of any leakage/less cooling effect.
73All as per item No.60 here in before but for gas R-32.
74All as per item No.60 here in before but for gas R-134/407.
75Supply only the spares incorporated during the repairs to Air conditioner WindowAC vide Sl Item No. 55 & 56 herein before.
76Starting Capacitor of80/ 100 mfd.
77Running Capacitor36 / 45 mfd.
78Potential Relay.
79Thermostat.
80Selector switch.
81Control Knob.
82Supply only dual Capacitor Starting & running 45 / 50 MFD capacity 25 / 085 / 21 MPP SH Make :KELTRON / INCAP/ EPCOS
83Supply only OLPsuitable for compressor all as directed.
84Supply and fix in repairs double ended fan motor forWindow AC 1.5 tonwith capacity 1/6 HPMake: HEE or equivalent ISI mark
85Supply and fix in repairs double ended fan motor forWindow AC 2 tonwith capacity 1/4 HP Make: HEE or equivalent ISI mark
86Material and labour for servicing water coolers of40 / 80 ltrs capacity, Cleaning the water tank by brush, rubbing the inner portion of the tankand then washing the tank by bleaching, washing the outer body by clean water. complete with cleaning condenser coilwith air blower, wet servicing of condensor coil unit with caustic soda etc, replacement of sheet metal screws wherever necessary applying oil in fan motor bushes checking and rectifying the wiring defects, proper setting of thermostat & other electrical/ Refrigerent controls,connectingup all connections and testingall as directed.
87Material and labour for servicing water coolers of60 / 120 ltrs capacitycomplete with cleaning condenser coilwith air blower, wet servicing of condensor coil unit with caustic soda etc, replacement of sheet metal screws wherever necessary applying oil in fan motor bushes checking and rectifying the wiring defects, proper setting of thermostat & other electrical/ Refrigerent controls,connectingup all connections and testingall as directed.
88Material and labour for servicing water coolers of150 ltrs capacitycomplete with cleaning condenser coilwith air blower, wet servicing of condensor coil unit with caustic soda etc, replacement of sheet metal screws wherever necessary applying oil in fan motor bushes checking and rectifying the wiring defects, proper setting of thermostat & other electrical/ Refrigerent controls,connectingup all connections and testingall as directed.
89Taking out burnt / unserviceablesealed compressor Unit from water coolers40 / 80 Ltrs per Hr cooling capacity, Supply & replacement factorysealed compressor unit, connecting refrigeration system after thoroughly flushing out the system and leak testing with CO2, vacuumising and gas charging with refrigerant gas, testing, re-installing in its original position/location connecting up all electrical connections, testing the complete unit all asdirected. Notes:- (i) Sealed compressor unit shall be replaced with existing capacity/Make. (ii)Gas Charging shall be mesasured and paid separately under relavent item
90Taking out burnt / unserviceablesealed compressor Unit from water coolers60 / 120 Ltrs per Hr cooling capacity, Supply & replacement factorysealed compressor unit, connecting refrigeration system after thoroughly flushing out the system and leak testing with CO2, vacuumising and gas charging with refrigerant gas, testing, re-installing in its original position/location connecting up all electrical connections, testing the complete unit all asdirected. Notes:- (i) Sealed compressor unit shall be replaced with existing capacity and Make. (ii)Gas Charging shall be mesasured and paid separately under relavent item
91Taking out burnt / unserviceablesealed compressor Unit from water coolers 150 / 150 Ltrs per Hr cooling capacity, Supply & replacement factorysealed compressor unit, connecting refrigeration system after thoroughly flushing out the system and leak testing with CO2, vacuumising and gas charging with refrigerant gas, testing, re-installing in its original position/location connecting up all electrical connections, testing the complete unit all asdirected. Notes:- (i) Sealed compressor unit shall be replaced with existing capacity and Make. (ii)Gas Charging shall be mesasured and paid separately under relavent item
92Material and labour for removing the water cooler from position and checking all condensor/ compressor coil, arresting the Leakages in condenser coil by brazing etc complete for water cooler 40/60 to 150/150 LtrsperHr cooling capacity all as specified and as directed by Engr-in- charge.
93Supply only the spares incorporated during the repairs to water cooler vide Sl Item No. 66,67& 68 herein before.
94Supply only starting capacitor suitable for water cooler 40 Ltrs/Hr or 60 Litres per Hr cooling capacity.
95Supply only running capacitor suitable for water cooler40 Litres/Hror 60 litres/Hr cooling capacitor.
96Supply only thermostatfor water cooler 40 Litres / Hr or 60 litres/ Hr cooling capacity.
97Supply only potential relay for water cooler of 40Ltr/Hr or 60 Ltrs/Hr cooling capacity.
98Supply only OLPsuitable for compressor all as directed.
99Supply only fan motor. (for water cooler capacity 40 Ltrs/Hr or 60 Ltrs/Hr cooling capacity).
100Supply only new fan blade of same size of existing and design as existing all as directed.
101Supply only brass chromium plated push button tap outer/Inner thread suitable for water cooler of any type of size 15 mm complete .
102Copper Capillary tube-0.40 mm
103Drier filter
104Copper Condensor coil for water cooler 40/60
105Copper Condensor coil for water cooler 60/120
106Supply only 15mm bore PVC ball valves high pressure with epoxy coated aluminium rod & high density plastic ball screwed for iron pipe complete as directed by Engr - in - charge.
107Supply only heavy duty PVC flexible connection braided type 15 mm diaand450 mm long with nuts/ washers on either end all asdirected.
108S&F in repairs of PVC flexible pipe 32 mm dia for water cooler drain out pipe complete all as specified and directed by Engr-in-Charge.
109Repairs to water cooler body, base frame with legs, door unit, storage tank, FHP motor baseetc of any capcity & make by cutting worn out / deteriorated portions of sheet steel and reconstructing bodyincluding providing ventilation grooves, hingeswhere required and steel storage tank to the existing shape and size using PGI sheet of 16 / 20 SWG as per the existing, necessary welding / bracing work to match with the existing surface, including all necessary items such as nuts, bolts, washers, drilling holes etc. and applying two coats of synthetic enamel paint on the affected previously painted area using spray gun over a coat of red oxide primer matching with the existing tint & shade and after repairing the water coolerservicing including checking/ leak testing testingcomplete all as specified and directed by Engr-in-Charge.
110Material and labour for servicing Refrigerators up to 165 Ltrs capacity complete with cleaning condenser coilwith air blower, cleaning internal body of refrigerator,wet servicing of condenser coil unit with caustic soda etc,repair/ replacement of sheet metal screws, minor parts, wherever necessary, checking and rectifying the wiring defects, tapping the loose wiring by proper insulation tape, proper setting of thermostat & other electrical/ Refrigerent controls,connectingup all connections and testingall as directed.
111Material and labour for servicing Refrigerators 165 to 320 Ltrs capacity complete with cleaning condenser coilwith air blower, cleaning internal body of refrigerator,wet servicing of condenser coil unit with caustic soda etc,repair/ replacement of sheet metal screws, minor parts, wherever necessary, checking and rectifying the wiring defects, tapping the loose wiring by proper insulation tape, proper setting of thermostat & other electrical/ Refrigerent controls,connectingup all connections and testingall as directed.
112Taking out Unserviceable / burntout sealed compressor Unit from Refrigerator, Supply & replacement factory sealed compressor unit, connecting with copper piping by braziing & Copper tubing etc complete Up to 165 Lts capacity.1 Notes:- (i) Sealed compressor unit shall be replaced with existing capacity/Make. (ii) Gas Charging shall be mesasured and paid separtely under relavent item
113Taking out Unserviceable / burntout sealed compressor Unit from Refrigerator, Supply & replacement factory sealed compressor unit, connecting with copper piping by braziing & Copper tubing etc complete 165 - 320 Lts capacity. Notes:- (i) Sealed compressor unit shall be replaced with existing capacity/Make. (ii) Gas Charging shall be mesasured and paid separtely under relavent item
114Removing the Refrigerator from position checking, testing and arresting the Leakages in refrigerant line/ copper tubbing/cleaning all the related parts rectify the defect of refrigerant line/ copper tubbing orcondenser coil by brazing or other means which ever is necessary at siteetc. complete for refrigerator up to 320 Ltrs all as specified and as directed at site..
115Supply only the spares incorporated during the repairs to refrigerator vide Sl Item No. 79 & 80 herein before.
116Supply only Thermostat for Refrigerator 165 Ltrs / 250/320 ltrs.
117Supply only Box type Relay for Refrigerators 165 Ltrs / 250/320 Ltrs.
118Supply only OLP for Refrigerator 165 Ltrs / 250/320 ltrs
119Supply only Auto defrost Thermostat switch complete as directed by Engr- in -charge. (Make:Ranutrol / Indfos / Denfos)
120Supply only Pigmay bulb (Thick/Thin Thread) 230 Volt complete as directed by Engr - in - charge.
121Supply in repair only Freezer Fan motor (as per sample) single phase 230 Volt, 50 Hz suitable for refrigerator of capacity 165 to 320 Ltr complete as directed by Engr - in - charge. (Make : Marathon Electric / Frac Master / M Bajaj Electric)
122Supply only Bi-metal for refrigerator
123Supply only timer for refrigerator
124M&L for gas welding/brazing of capillary connections in the refrigerant circuit using copper rod for refrigerator/ watercooler/ window type AC/ Split AC/ Deep Freezer complete all as directed by EIC at site. Note: Copper Tubing Required will be measured and paid separately under relevant item of schedule.
125Material & labour for wiring with 2 runs of 2.5 sqmm FRLSPVC insulated copper conductor wire single core multistrand for phase & neutral, and 1.5 sqmm FRLS grade PVC insulated copper conductor wire for earth continuity drawin in and including PVCconduit20 mm diain wall surface/ recessed ceilingand making good after disturbed surface all as specified and directed. Note :-3 runs of cable and 1 run of conduit measured as 1 RM
126Material & labour for wiring with 2 runs of 4.0 sqmm FRLSPVC insulated copper conductor wire single core multistrand for phase & neutral,and 1 run of 2.5 sqmm FRLS grade PVC insulated copper conductor wire for earth continuity drawin in and including PVCconduit25 mm dia in wall suirface/recessed ceilingand making good after disturbed surface all as specified and directed Note :-3 runs of cable and 1 run of conduit measured as 1 RM
127Taking down of old u/s AC manager and Supply & fix AC load manager with built in programme for on/off of 2 Nos of 1.5 TR/2 TR capacity split type Acs suitable for operating on single phase 230 volts all as specified and directed.
128Servicing theVoltage Stabilizer 3 KVA single phaseof make - Soft line or equivalent after strip opening covers, taking out the burnt out winding from the transformer rewind with super enamelled copper winding wire, insulate properly, setting/testing of buck/boost relay, replacement of U/S electronic parts, assembleback & fixing in its original position including testing for proper functioningcomplete all as specified and as directed.
129Servicing theVoltage Stabilizer 4 KVA single phaseof make - Soft line or equivalent after strip opening covers, taking out the burnt out winding from the transformer rewind with super enamelled copper winding wire, insulate properly, setting/testing of buck/boost relay, replacement of U/S electronic parts, assembleback & fixing in its original position including testing for proper functioningcomplete all as specified and as directed.
130Servicing theVoltage Stabilizer 5 KVA single phaseof make - Soft line or equivalent after strip opening covers, taking out the burnt out winding from the transformer rewind with super enamelled copper winding wire, insulate properly, setting/testing of buck/boost relay, replacement of U/S electronic parts, assembleback & fixing in its original position including testing for proper functioningcomplete all as specified and as directed.
131M&L for half yearly maintenance/ repair/ servicing of water purifier of any type and brand by taking down, dismantling, cleaning and replacing worn out/damaged parts such as carbon filter, UV lamp etc., including reassembling, refixing, connecting up and testing complete all as specified and directed. Note: (i) Cost of spare parts replaced during the process of repair/servicing shall be measured and paid separately as supply only under relevant item herein after. (ii) Labour charges for replacement of spares parts if any required during repair/ servicing deemed to be included in the quoted rate.
132Supply only following spares required for replacement during the process of servicing/ repairing of water purifier herein before.
133Carbon filter suitable for Aqua Guard/ Aqua PlusUV, RO, UF+
134Carbon filter suitable for Kent UV, RO, UF+
135UV Lamp Suitable fot Aqua guard/ Kent purifier
136Note:- The amount against the Schedule of Credit mentioned in the tender document shall be deducted from the total amount quoted against Sch "A" while deriving the Contract Sum for Acceptance.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail