Madhya Pradesh Power Generating Company Limited-MPPGCL has published Tender For Work Contract For Aoh Of Electrical Equipment And Auxiliaries Of Unit No 5, 210 Mw Atps Chachai. Submission Date for this Tender is 11-03-2024. Circuit Breakers Tenders in chachai Madhya Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

41572377
Corrigendum : Tender For Work Contract For Aoh Of Electrical Equipment And Auxiliaries Of Unit No 5, 210 Mw Atps Chachai
Open Tender
Indian
Madhya Pradesh
chachai
11-03-2024

Tender Details

Tender For Work Contract For Aoh Of Electrical Equipment And Auxiliaries Of Unit No 5, 210 Mw Atps Chachai - 1 Generator : Misc Works In Generator Overhauling 2 Cleaning / Painting Of Bus Duct Pressurization Unit. 3 H2 Purging After Unit Shutdown & H2 Refilling Before Of Unit Light Up. 4 Cleaning / Painting Of H2 Drier 5 Transformers 6 General Overhaulingof Ht Transformers 7 Generating Transformer 8 Cleaning / Washing Of Transformers 9 Painting Of Transformers 10 Terminal Tightness 11 Inspection Of Seal Of Bushing, Insulators, Terminal Bushings, Etc. 12 Overhauling Of Fan & Pumpmotors 13 Station Transformer 14 Cleaning / Washing Of Transformers 15 Painting Of Transformers 16 Terminal Tightness 17 Inspection Of Seal Of Bushing, Insulators, Terminal Bushings, Etc 18 Overhauling Of Fan & Pumpmotors 19 Unit Auxiliary Transformer 20 Cleaning / Washing Of Transformers 21 Painting Of Transformers 22 Terminal Tightness 23 Inspection Of Seal Of Bushing, Insulators, Terminal Bushings, Etc 24 Overhauling Of Fan & Pumpmotors 25 Neutral Grounding Panel ( Gen., Gt, St, UatS ) 26 Cleaning / Inspection / Painting 27 Painting Of Transformer Oil Storage Tank 28 Transformer Oil Storage Tank 18 Kl Capacity 29 Identification Boards Of Transformers 30 Painting Of Ht Transformer Yard Fencing & Gate 31 Transformer Oil Filter Machine Painting 32 General Overhaulingof Lt Transformers:Cleaning, Washing, Tightness Of Terminals, Inspection Of Seal Of Bushing, Insulators, Terminal Bushings Of Following : 33 Lt Dry Type Transformers 34 Cleaning Of Transformers 35 Painting Of Transformers 36 Terminal Tightness, Inspection Of Seal Of Bushing, Insulators, Terminal Bushings, Etc 37 Lt Oil Filled Transformers 38 Cleaning / Washing Of Transformers 39 Painting Of Transformers 40 Terminal Tightness, Inspection Of Seal Of Bushing, Insulators, Terminal Bushings, Etc 41 Excitation Transformer 42 Cleaning 43 Painting 44 Terminal Tightness 45 Painting Of Lt Transformer Yard Fencing Gate 46 Switchyard :- 47 Breaker, Isolators , Earth Switch, Bay Equipments 48 Cleaning & Terminal Tightness 49 Painting And Ryb Colour Identification Marking. 50 Bay Equipments Along With Structure: Ct / Pt / Cvt / La, Circuit Breakers, Marshalling Box, Mom Box, Earth Switch, Bus Post Insulators 51 Identification / Caution Board Painting & Letter Writing. 52 Circuit Breaker Platform Cleaning And Painting 53 Painting Of Switchyard Fencing And Gate 54 Bus Ducts :Inspection, Tightness, Cleaning, Painting And Replacement Of Insulators & Heaters ( If Required ) 55 21 / 15.75 Kv Gen Bus Duct 56 6.6 Kv St Bus Duct 57 6.6 Kv Uat Bus Duct 58 Lt Transformer Bus Duct 59 Esp 60 Ltmsb, Acp Buses & Mcc ( Cleaning , Tightness & Complete Inspection Of All Buses ) 61 Cleaning, Tightness Work In Ec Panel ( Field Controller Panel ) 62 Cleaning, Tightness Work In Ec Panel ( Rapping Controller Panel ) 63 Cleaning & Resistance Checking Of Heaters, Replacement Of Faulty Esp Hopper Heaters 64 Servicing / Replacement Of Hopper Heaters 65 Servicing / Replacement Of Shaft Insulator Heating Elements 66 Servicing / Replacement Of Support Insulator Heating Elements 67 General Overhauling Of : 68 Tr ( Rectifire Transformer ) Set Along With Painting 69 Ht Switchgear Panel ( 11 Kv / 6.6 Kv ) 70 Bus Cleaning, Tightness & Complete Inspection Of Panel. 71 Painting & Writing Of Nomenclatur Of Above Panels 72 415V Ltswbd / Mcc / Acdb / Dcdb Switchgear Panel 73 Bus Cleaning, Tightness & Complete Inspection Of Panel. 74 Painting & Writing Of Nomenclatur Of Above Panels 75 Bop SwitchgearS Panel 76 Bus Cleaning, Tightness & Complete Inspection Of Panel. 77 Painting & Writing Of Nomenclatur Of Above Panels 78 Bop Local Control Panels / Wall Mounted Panels 79 Bus Cleaning, Tightness & Complete Inspection Of All Buses. 80 Painting & Writing Of Nomenclatur Of Above Panels 81 Power House Lighting & Power Supply 82 Cleaning , Painting, Tightness & Complete Inspection Of All Lightning Transformers & Ldb 83 Providing Power Supply As Per Site Requirement & For Other Maintenance Work Of Bmd, Tmd Etc. 84 Overhauling Of Lighting Panels 85 Various Type Of LpS 86 Painting & Writing Of Nomenclatur Of Street Light Poles ( 80 ) &LpS ( 68 ) Nos. 87 Lighting Circuits In Tg, Boiler, Switchgear, Wt Plant, Dm Plant, Fuel Oil Building 88 Cleaning & Dressing Of Cables Of Of Cable Trays Boiler Area, Esp Area & Turbine Area 89 Cleaning & Dressing Of Cables Of Of Cable Trays In Ct / Cw Ph, Dm Plant, Ff Ph, Raw Water Ph, Switchyard Area & Ahp. 90 Ht Motors: 91 Servicing Of Ht Motors 92 Cleaning , Tightness, Bearing Inspection , Greasing Etc. 93 Painting Of Ht Motors 94 Nomenclature Of Motors 95 Painting Of Canopy / Shed Of Ht Motors 96 Lt Motors Servicing 97 Motors Above 40 Kw 98 Motor 40 Kw To 11 Kw 99 Motors 10 Kw To 5.5 Kw 100 Motors 5 Kw To 1.1 Kw 101 Motors 1 Kw And Below 102 Lt Motor Overhauling : 103 Motors Above 40 Kw 104 Motor 40 Kw To 11 Kw 105 Motors 10 Kw To 5.5 Kw 106 Motors 5 Kw To 1.1 Kw 107 Motors 1 Kw And Below 108 Servicing Of Battery Bank 109 Servicing Of Unit / Station / Switchyard Battery Set

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 06-Feb-2024 1st Extension of due date Date 19-02-2024
2 20-Feb-2024 2nd Extension of due date Date 01-03-2024
3 04-Mar-2024 3nd Extension of due date Date 11-03-2024

Key Value

Document Fees
INR 1000 /-
EMD
INR 40500.0 /-
Tender Value
INR 20.26 Lakhs /-

BOQ Items

Name of Work: Work contract for AOH of electrical equipment & auxiliaries of unit no 5, 210 MW ATPS Chachai
Sl. No. Item Description
1GENERATOR : MISC WORKS IN GENERATOR OVERHAULING
2CLEANING / PAINTING OF BUS DUCT PRESSURIZATION UNIT.
3H2 PURGING AFTER UNIT SHUTDOWN & H2 REFILLING BEFORE OF UNIT LIGHT UP.
4CLEANING / PAINTING OF H2 DRIER
5TRANSFORMERS
6GENERAL OVERHAULINGOF HT TRANSFORMERS
7GENERATING TRANSFORMER
8CLEANING / WASHING OF TRANSFORMERS
9PAINTING OF TRANSFORMERS
10TERMINAL TIGHTNESS
11INSPECTION OF SEAL OF BUSHING, INSULATORS, TERMINAL BUSHINGS, ETC.
12OVERHAULING OF FAN & PUMPMOTORS
13STATION TRANSFORMER
14CLEANING / WASHING OF TRANSFORMERS
15PAINTING OF TRANSFORMERS
16TERMINAL TIGHTNESS
17INSPECTION OF SEAL OF BUSHING, INSULATORS, TERMINAL BUSHINGS,ETC
18OVERHAULING OF FAN & PUMPMOTORS
19UNIT AUXILIARY TRANSFORMER
20CLEANING / WASHING OF TRANSFORMERS
21PAINTING OF TRANSFORMERS
22TERMINAL TIGHTNESS
23INSPECTION OF SEAL OF BUSHING, INSULATORS, TERMINAL BUSHINGS,ETC
24OVERHAULING OF FAN & PUMPMOTORS
25NEUTRAL GROUNDING PANEL ( GEN., GT, ST, UAT"S)
26CLEANING / INSPECTION/ PAINTING
27PAINTING OF TRANSFORMER OIL STORAGE TANK
28TRANSFORMER OIL STORAGE TANK 18 KL CAPACITY
29IDENTIFICATION BOARDS OF TRANSFORMERS
30PAINTING OF HT TRANSFORMER YARD FENCING & GATE
31TRANSFORMER OIL FILTER MACHINE PAINTING
32GENERAL OVERHAULINGOF LT TRANSFORMERS: CLEANING, WASHING, TIGHTNESS OF TERMINALS, INSPECTION OF SEAL OF BUSHING, INSULATORS, TERMINAL BUSHINGS OF FOLLOWING :
33LT DRY TYPE TRANSFORMERS
34CLEANING OF TRANSFORMERS
35PAINTING OF TRANSFORMERS
36TERMINAL TIGHTNESS, INSPECTION OF SEAL OF BUSHING, INSULATORS, TERMINAL BUSHINGS,ETC
37LT OIL FILLED TRANSFORMERS
38CLEANING / WASHING OF TRANSFORMERS
39PAINTING OF TRANSFORMERS
40TERMINAL TIGHTNESS, INSPECTION OF SEAL OF BUSHING, INSULATORS, TERMINAL BUSHINGS,ETC
41EXCITATION TRANSFORMER
42CLEANING
43PAINTING
44TERMINAL TIGHTNESS
45PAINTING OF LT TRANSFORMER YARD FENCING GATE
46SWITCHYARD :-
47BREAKER, ISOLATORS ,EARTH SWITCH, BAY EQUIPMENTS
48CLEANING & TERMINAL TIGHTNESS
49PAINTING AND RYB COLOUR IDENTIFICATION MARKING.
50BAY EQUIPMENTS ALONG WITH STRUCTURE: CT / PT/ CVT/ LA, CIRCUIT BREAKERS, MARSHALLING BOX, MOM BOX, EARTH SWITCH, BUS POST INSULATORS
51IDENTIFICATION/CAUTION BOARD PAINTING & LETTER WRITING.
52CIRCUIT BREAKER PLATFORM CLEANING AND PAINTING
53PAINTING OF SWITCHYARD FENCING AND GATE
54BUS DUCTS : INSPECTION, TIGHTNESS, CLEANING, PAINTING AND REPLACEMENT OF INSULATORS & HEATERS (IF REQUIRED)
5521/ 15.75 KV GEN BUS DUCT
566.6 KV ST BUS DUCT
576.6 KV UAT BUS DUCT
58LT TRANSFORMER BUS DUCT
59ESP
60LTMSB, ACP BUSES & MCC (CLEANING , TIGHTNESS & COMPLETE INSPECTION OF ALL BUSES)
61CLEANING, TIGHTNESS WORK IN EC PANEL (FIELD CONTROLLER PANEL)
62CLEANING, TIGHTNESS WORK IN EC PANEL (RAPPING CONTROLLER PANEL)
63CLEANING & RESISTANCE CHECKING OF HEATERS, REPLACEMENT OF FAULTY ESP HOPPER HEATERS
64SERVICING/REPLACEMENT OF HOPPER HEATERS
65SERVICING/ REPLACEMENT OF SHAFT INSULATOR HEATING ELEMENTS
66SERVICING/ REPLACEMENT OF SUPPORT INSULATOR HEATING ELEMENTS
67GENERAL OVERHAULING OF :
68TR (Rectifire Transformer) SET ALONG WITH PAINTING
69HT SWITCHGEAR PANEL (11 KV/ 6.6 KV)
70BUS CLEANING, TIGHTNESS & COMPLETE INSPECTION OF PANEL.
71PAINTING & WRITING OF NOMENCLATUR OF ABOVE PANELS
72415V LTSWBD/ MCC/ACDB/DCDB SWITCHGEAR PANEL
73BUS CLEANING, TIGHTNESS & COMPLETE INSPECTION OF PANEL.
74PAINTING & WRITING OF NOMENCLATUR OF ABOVE PANELS
75BOP SWITCHGEAR"S PANEL
76BUS CLEANING, TIGHTNESS & COMPLETE INSPECTION OF PANEL.
77PAINTING & WRITING OF NOMENCLATUR OF ABOVE PANELS
78BOP LOCAL CONTROL PANELS / WALL MOUNTED PANELS
79BUS CLEANING, TIGHTNESS & COMPLETE INSPECTION OF ALL BUSES.
80PAINTING & WRITING OF NOMENCLATUR OF ABOVE PANELS
81POWER HOUSE LIGHTING & POWER SUPPLY
82CLEANING , PAINTING, TIGHTNESS & COMPLETE INSPECTION OF ALL LIGHTNING TRANSFORMERS & LDB
83PROVIDING POWER SUPPLY AS PER SITE REQUIREMENT & FOR OTHER MAINTENANCE WORK OF BMD,TMD ETC.
84OVERHAULING OF LIGHTING PANELS
85VARIOUS TYPE OF LP"S
86PAINTING & WRITING OF NOMENCLATUR OF STREET LIGHT POLES (80) &LP"S (68) Nos.
87LIGHTING CIRCUITS IN TG, BOILER, SWITCHGEAR, WT PLANT, DM PLANT, FUEL OIL BUILDING
88CLEANING & DRESSING OF CABLES OF OF CABLE TRAYS BOILER AREA, ESP AREA & TURBINE AREA
89CLEANING & DRESSING OF CABLES OF OF CABLE TRAYS IN CT/CW PH, DM PLANT, FF PH, RAW WATER PH, SWITCHYARD AREA & AHP.
90HT MOTORS:
91SERVICING OF HT MOTORS
92CLEANING , TIGHTNESS, BEARING INSPECTION , GREASING ETC.
93PAINTING OF HT MOTORS
94NOMENCLATURE OF MOTORS
95PAINTING OF CANOPY/ SHED OF HT MOTORS
96LT MOTORS SERVICING
97MOTORS ABOVE 40 KW
98MOTOR 40 KW TO 11 KW
99MOTORS 10 KW TO 5.5 KW
100MOTORS 5 KW TO 1.1 KW
101MOTORS 1 KW AND BELOW
102LT MOTOR OVERHAULING :
103MOTORS ABOVE 40 KW
104MOTOR 40 KW TO 11 KW
105MOTORS 10 KW TO 5.5 KW
106MOTORS 5 KW TO 1.1 KW
107MOTORS 1 KW AND BELOW
108SERVICING OF BATTERY BANK
109SERVICING OF UNIT / STATION / SWITCHYARD BATTERY SET
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail