Lucknow Development Authority has published Tender For Redevelopment Of Tubewell, Construction Of Pump House And 3 Year Operation And Maintenance Work.. Submission Date for this Tender is 18-01-2024. Pump House Construction Tenders in lucknow Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | (Part-A Redevolopment) |
2 | Excavation of earth in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5m and lead upto 50m filling watering and ramming of excavated earth into the space between building and the side of the foundation trenches or in to the plinth and disposal so surplus earth upto a distance of 50m from the center of the foundation trenches, pwd 2020-21 DAR 2.6.1 |
3 | 100 mm thick Concrete with 40 mm guage stone ballast coarse sand & cement in proportion of 8:4:1 in foundation including supply of all material, labour T&P etc. required for proper completion of the work pwd 2020-21 DAR 4.1.8 |
4 | First class brick in 1:6 cement, coarse sand, mortar in foundation and plinth including supply of all material, labour T&P etc. required for proper completion of the work. pwd 2020-21 DAR 6.1.2 |
5 | 40 mm thick damp proof coarse with cement concrete 1:2:4 (1 cement: 2 coarse sand:4 graded stone aggregate 12.5 nominal size) including supply of all material, labour T&P etc. required for proper completion of the work including curing and shuttering as necessary. pwd 2020-21 DAR 4.10 |
6 | First class brick in 1:6 cement, coarse sand, mortar in superstructure including supply of all material, labour T&P etc. required for proper completion of the work. pwd 2020-21 DAR 6.4.2 |
7 | R.C.C. work with cement, coarse sand and 20 mm gauge approved stone ballast in proportion of 1:1.5:3 excluding supply of reinforcement and its bending but including its fixing and binding the same with 0.50 mm thick binding wire (to be supplied by the contractors) and including necessary centering and shuttering and supply of all material, labour T&P etc required for proper completion of the work. SOR - 2020/5.2.2 |
8 | Mild steel or iron work in plain work in R.C.C. wrought to required shape as necessary including bending for proper completion of work and including supply of steel and wastage etc. pwd 2020-21 DAR 10.1 |
9 | Mild steel or iron work in heavy size such as trusses build up gates record racks, roof work, gates etc wrought to required from including drilling holes riveting or welding where necessary and also including supply of steel bolts nuts etc their fixing required for proper completion of work for rail guard pwd 2020-21 DAR 10.11.1 |
10 | 12 mm thick plaster in 1:6 with cement, fine sand mortar over brick work minimum thickness not to be less than 10 mm including supply of all materials, labour T&P etc required for proper completion of the work. pwd 2020-21 DAR 13.1.2 |
11 | 40 mm thick 1:2:4 PCC Floor with cement, coarse sand & 20 mm gauge approved stone ballast laid on panels, finished with 3 mm floating coat of neat cement & excluding 7.5cm thick base concrete consisting of cement, coarse sand and stone ballast 4 cm gauge in proportion of 1:4:8 and removing and over lapping of mortar in the joints of the panels if any and giving them uniform finish including supply of all materials, labour T&P etc required for proper completion of the work. pwd 2020-21 DAR 11.3.1 |
12 | 15 mm cement plaster in single coat in the complete in 1"3 cement: sand pwd 2020-21 DAR 13.10 |
13 | Painting or varnishing with 2 coat and one priming coat of new iron or wood work with one coat of priming and two coats of approved paint & varnish including supply of all materials, labour T&P etc required for proper completion of the work. pwd 2020-21 DAR 641+643 |
14 | Providing and laying of white cement based putty of average thicknesss 1 mm of approved bran and manufacturer over the plastered wall serface to prepare the serface each and smooth complete pwd sor 2020-1 Dar 13.80 |
15 | Supply and fixing of Fan hook including supply of all material, labour T&P etc required for proper completion of work pwd 2018/1123 |
16 | One priming coat and one coat of dry distemper on new work including supply of all materials labour and T&P etc required for proper completion of work for 3 coat pwd sor 2020-21- 681+682 (36.40+2x18.80) (36.40+37.60) |
17 | Supply of Fan Box. SOR Electrical 2018/1149 |
18 | Wire Point Light. SOR Electrical 2018/174B |
19 | Wire Point Fan. SOR Electrical 2018/177C |
20 | Fan - Miss |
21 | Pluge Socket. SOR Electrical 2018, 1139A |
22 | Tubelight SOR Electrical 2018, 1414 |
23 | Wire 1.5 mm |
24 | Lifting of 150 mm dia MS Collumn Pipe Including Labour all Complete |
25 | Repairing and Rewinding of 20 HP KSB Make motar 6 Stage Pump all Complete. |
26 | Supply and Loaring of 6 Sqmm Submersible Cable 3 Core Copper Flat. |
27 | Supply of Start delta starter including single phase privantor volt meter & ampier meter BCH make |
28 | Installation of submersible pump 20 HP pump set loaring complete |
29 | Tranportation of Air compressor machine & its T&P from store to the site of tubewell and return after completion of work with incude loading and unloading |
30 | Providing & Fixing of C) Sluice Valve with Labour T & Pall Complete. (PSR) |
31 | 150 mm dia |
32 | Supply of Pea Gravel |
33 | Development of State Tubewells by private compressor 300 PSI/800CEM including shifting of compressor utop point, POL operating staff tentage charges, cousumable item. including lowering and lifting of Air line upto 150 to 180 meter |
34 | (a) 250 PSI Compressor upto 120 Mtr Drilling Depth |
35 | Supply and fixing M.s column pipe 150mm dia complete with both side well weldede flanched complete in all respect |
36 | Supply of Nut Bolt Rubber Packing etc. |
37 | S&F of 100 Amp. 415 V metal clad TP HRC type switch fuse unit complete with HRC fuse on angle iron bracket complete in all respect. |
38 | (Part-b Annual Operation & Maintenance) |
39 | Annual operation & Maintenance of Tube Wells complete with repairing and rewinding of moters, moter pannels, submeesible cables, sluice valbe etc. proper completion of work as per direction of E/I (PSR) |