Tender For Additional Iron Rack, Flooring And Repair Work For The Archives Located In The District Court Campus., aligarh-Uttar Pradesh

Public Works Department-PWD has published Tender For Additional Iron Rack, Flooring And Repair Work For The Archives Located In The District Court Campus.. Submission Date for this Tender is 16-01-2024. Steel Furniture Tenders in aligarh Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

41560665
Tender For Additional Iron Rack, Flooring And Repair Work For The Archives Located In The District Court Campus.
Open Tender
Indian
Uttar Pradesh
aligarh
16-01-2024

Tender Details

Tender For Additional Iron Rack, Flooring And Repair Work For The Archives Located In The District Court Campus.

Key Value

Document Fees
INR 854 /-
EMD
INR 335000.0 /-
Tender Value
INR 33.50 Lakhs /-

BOQ Items

Name of Work : Additional Iron Rack, Flooring and Repair work for the archives located in the District Court Campus.
Sl. No. Item Description
1Dismantling cement concrete or brick or granolithic floors including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet).Ch 17 SI No.697.(Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.)
2Dismantling doors and windows including stacking of materials as directed by Engineer-In-Charge with a distance of 60 meters (200 feet). Ch-17, S.I. No. 703.(Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.)
3Dismantling existing plaster including disposal of refuse as directed by Engineer-In-Charge within a distance of 60 meters. (200 feet) Ch-17, S.I. No. 706(Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.)
4Providing and laying cement concrete in 1:4:8 (1 Cement : 4 Coarsesand : 8 graded Brick ballast 40 mm nominal size) and curing complete, Including cost of form work. in Foundation and floors. (Fine sand not less than in 1.25 FM).Ch.5 S.I.No. 275(a).(Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.)
5Providing and fixing angle/Tee iron frames for doors, windows and ventilators of mild steel Angle sections of size 35×35×5 mm, joints mitred and welded by angle iron 35×35×5 mm or 35×5 mm flat pieces to the existing T-iron frame or to the wall with dash fastener, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer, all complete as per the direction of Engineer-In-charge. Ch 10, SI No 12 (10.19).(Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.)
612mm Cement plaster onbrick work with cement mortar of mix (all floors) 1:4(1 cement : 4 coarse sand). Ch-13 S.I. 586A (II)(Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.)
7Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete. including cost of all material, Labour, T&P etc. complete required for proper completion of the work. Ch-15,S.I. 6 New(13.26) (Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.)
8Distempering (Two coat) with oil bound distemper of approved brand and manufacture and of required shade on undercoated wall surface to give an even shade over & including a priming coat with cement primer of approved brand and manufacture such as Berger, J&N, Shalimar, Asian, paints after thoroughly brushing the surface free from mortar droppings and other foreign matter and also including preparing the surface even with plaster of approved synthetic material and sand papered smooth including cost of all Material, Labours, T&P etc complete required for proper completion of th work. Ch-15, S.I.649 + 650(Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.)
9Re fixing of flush doors, commercial quality conforming of I.S. 2202 part-1 (1983) including fixing of wooden cleats and stoppers and including fixing and adjustment of hinges, bolts, locks, handles, springs,fitting with necessary screws to be supplied departmentally.Ch 9 SI No.470(a). (Only Labour Rate)(Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.)
10Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work over an under coat of suitable shade with wooden Primer of approved brand and manufacture including cost of all material, Labour, T&P etc. complete required for proper completion of the work. Ch.15 Si. No.4 New(Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.)
11Providing and fixing glazing in Z-section, windows, doors, ventilator shutters and partitions etc. with Glass putty/beading etc. complete. Ch 9 SI No.12 New (ii).5.5 mm thick glass panes.(Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.)
12Supply and fixing S.S. Mosquitos proof heavy quality iron wire gauge or expended metal heavy quality over windows and including supply of C.P. teak wood batten 8 cm x 1cm flat iron 25mm x 4mm and including supply of necessary screws all materials, labour, Tools & plants etc. required for proper completion of the work.. Ch. 9. S.I.455.(Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.)
13Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) :25 mm thick. Ch. 14 SI No 12.(Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.)
14Providing and Laying welded mesh 1" x 3" size of gauge wire of steel for providing strength of material including supply of all material, labour, T & P etc complete. (Including cost of all material, labour, labour cess and all other taxes but excluding G.S.T.)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail