}

Tender For Maintenance And Repairs Of Different Size Motor Pumps, Starters, Transformers Etc. And Supplying Of Spare Parts At Pumping Station And Filter Plant Machineries, hinganghat-Maharashtra

Directorate Of Municipal Administration-DMA has published Tender For Maintenance And Repairs Of Different Size Motor Pumps, Starters, Transformers Etc. And Supplying Of Spare Parts At Pumping Station And Filter Plant Machineries. Submission Date for this Tender is 22-01-2024. Electrical Maintenance Tenders in hinganghat Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

41528063
Tender For Maintenance And Repairs Of Different Size Motor Pumps, Starters, Transformers Etc. And Supplying Of Spare Parts At Pumping Station And Filter Plant Machineries
Open Tender
Indian
Maharashtra
hinganghat
22-01-2024

Tender Details

Tender For Maintenance And Repairs Of Different Size Motor Pumps, Starters, Transformers Etc. And Supplying Of Spare Parts At Pumping Station And Filter Plant Machineries=- 1 150 Hp Motor Rewinding, Removing, Dismentalling, Loading & Unloadingof 150 Hp Repairs Of Squirrel Cage Induction Motor, Three Phase Vertical Solid Shaft Motorspdp 415 Volt With Insulation, Varnishing And Painting Etc. ( Scrap Of Winding Material Shall Be Retained By Rewinder ) 2 150 Hp Motor Servicing And Overhauling Of Motor Including Removing From Location, Dismentalling, Cleaning, Winding, Drying, Applying, Warnishing And Changing The Bearing If Necessary, Greasing The Bearing Assembling And Giving Satisfactory Trial On No Load And Full Load ( This Item Will Not Execute If Motor Is Rewinded ) 3 Supplying And Errection Of Bearing As Per Specification Including Removing & Dismentalling Motor Re-Errection Of Motor Etc. Complete Test And Trial For 150 Hppump 4 150 Hp Pump Assembly Removing, Dismentalling, Assembling And Re-Errection Of Pump 5 Removing, Machining, Fitting And Assembly Of Ss Shaft Sleeve Of 150 Hp Pump 6 150 Hp Pump Removing, Supplying And Fitting, Housing, Bushing, Gland Packing, Water Seal Ring , Rubber Sheet, Nut Bolt Etc. And Other Necessary Item 7 150 Hp Testing And Calibrating Electro Magnetics Relays, Electro Statics Kind Of Relays, Contactor, Timer, Indicator And Switches & Other Items Etc. 8 120 Hp Motor Rewinding, Removing, Dismentalling, Loading & Unloadingof 120 Hp Repairs Of Squirrel Cage Induction Motor, Three Phase Vertical Solid Shaft Motorspdp 415 Volt With Insulation, Varnishing And Painting Etc. ( Scrap Of Winding Material Shall Be Retained By Rewinder ) 9 120 Hp Motor Servicing And Overhauling Of Motor Including Removing From Location, Dismentalling, Cleaning, Winding, Drying, Applying, Warnishing And Changing The Bearing If Necessary, Greasing The Bearing Assembling And Giving Satisfactory Trial On No Load And Full Load ( This Item Will Not Execute If Motor Is Rewinded ) 10 Supplying And Errection Of Bearing As Per Specification Including Removing & Dismentalling Motor Re-Errection Of Motor Etc. Complete Test And Trial For 120 Hppump 11 120 Hp Pump Assembly Removing, Dismentalling, Assembling And Re-Errection Of Pump 12 Removing, Machining Fitting And Assembly Of Ss Shaft Sleeve Of 120 Hp Pump 13 120 Hp Pump Removing, Supplying And Fitting, Housing, Bushing, Gland Packing, Water Seal Ring , Rubber Sheet, Nut Bolt Etc. And Other Necessary Item 14 120 Hp Testing And Calibrating Electro Magnetics Relays, Electro Statics Kind Ofrelays, Contactor, Timer, Indicator And Switches & Other Items Etc. 15 100 Hp Motor Rewinding, Removing, Dismentalling, Loading & Unloadingof 100 Hp Repairs Of Squirrel Cage Induction Motor, Three Phase Vertical Solid Shaft Motorspdp 415 Volt With Insulation, Varnishing And Painting Etc. ( Scrap Of Winding Material Shall Be Retained By Rewinder ) 16 100 Hp Motor Servicing And Overhauling Of Motor Including Removing From Location, Dismentalling, Cleaning, Winding, Drying, Applying, Warnishing And Changing The Bearing If Necessary, Greasing The Bearing Assembling And Giving Satisfactory Trial On No Load And Full Load ( This Item Will Not Execute If Motor Is Rewinded ) 17 Supplying And Errection Of Bearing As Per Specification Including Removing & Dismentalling Motor Re-Errection Of Motor Etc. Complete Test And Trial For 100 Hppump 18 100 Hp Pump Assembly Removing, Dismentalling, Assembling And Re-Errection Of Pump 19 Removing, Machining Fitting And Assembly Of Ss Shaft Sleeve Of 100 Hp Pump 20 100 Hp Pump Removing, Supplying And Fitting, Housing, Bushing, Gland Packing, Water Seal Ring , Rubber Sheet, Nut Bolt Etc. And Other Necessary Item 21 100 Hp Testing And Calibrating Electro Magnetics Relays, Electro Statics Kind Ofrelays, Contactor, Timer, Indicator And Switches & Other Items Etc. 22 60 Hp Horizontal Motor Rewinding, Removing, Dismentalling, Loading & Unloadingof 60 Hp Repairs Of Squirrel Cage Induction Motor, Three Phase Vertical Solid Shaft Motorspdp 415 Volt With Insulation, Varnishing And Painting Etc. ( Scrap Of Winding Material Shall Be Retained By Rewinder ) 23 60 Hp Horizontal Motor Servicing And Overhauling Of Motor Including Removing From Location, Dismentalling, Cleaning, Winding, Drying, Applying, Warnishing And Changing The Bearing If Necessary, Greasing The Bearing Assembling And Giving Satisfactory Trial On No Load And Full Load ( This Item Will Not Execute If Motor Is Rewinded ) 24 Supplying And Errectionof Bearing As Per Specification Including Removing & Dismentalling Motor Re-Errection Of Motor Etc. Complete Test And Trial For 60 Hp Horizontalpump 25 60 Hp Horizontal Pump Assembly Removing, Dismentalling, Assembling And Re-Errection Of Pump 26 Removing, Machining Fitting And Assembly Of Ss Shaft Sleeve Of 60 Hp Horizontal Pump 27 60 Hp Horizontal Pump Removing, Supplying And Fitting, Housing, Bushing, Gland Packing, Water Seal Ring , Rubber Sheet, Nut Bolt Etc. And Other Necessary Item 28 60 Hp Horizontal Testing And Calibrating Electro Magnetics Relays, Electro Statics Kind Ofrelays, Contactor, Timer, Indicator And Switches & Other Items Etc. 29 50 Hp Motor Rewinding, Removing, Dismentalling, Loading & Unloadingof 50 Hp Repairs Of Squirrel Cage Induction Motor, Three Phase Vertical Solid Shaft Motorspdp 415 Volt With Insulation, Varnishing And Painting Etc. ( Scrap Of Winding Material Shall Be Retained By Rewinder ) 30 50 Hp Motor Servicing And Overhauling Of Motor Including Removing From Location, Dismentalling, Cleaning, Winding, Drying, Applying, Warnishing And Changing The Bearing If Necessary, Greasing The Bearing Assembling And Giving Satisfactory Trial On No Load And Full Load ( This Item Will Not Execute If Motor Is Rewinded ) 31 Supplying And Errection Of Bearing As Per Specification Including Removing & Dismentalling Motor Re-Errection Of Motor Etc. Complete Test And Trial For 50 Hppump 32 50 Hp Pump Assembly Removing, Dismentalling, Assembling And Re-Errection Of Pump 33 Removing, Machining Fitting And Assembly Of Ss Shaft Sleeve Of 50 Hp Pump 34 50 Hp Pump Removing, Supplying And Fitting, Housing, Bushing, Gland Packing, Water Seal Ring , Rubber Sheet, Nut Bolt Etc. And Other Necessary Item 35 50 Hp Testing And Calibrating Electro Magnetics Relays, Electro Statics Kind Of Relays, Contactor, Timer, Indicator And Switches & Other Items Etc. 36 25 Hp Motor Rewinding, Removing, Dismentalling, Loading & Unloadingof 25 Hp Repairs Of Squirrel Cage Induction Motor, Three Phase Vertical Solid Shaft Motorspdp 415 Volt With Insulation, Varnishing And Painting Etc. ( Scrap Of Winding Material Shall Be Retained By Rewinder ) 37 25 Hp Motor Servicing And Overhauling Of Motor Including Removing From Location, Dismentalling, Cleaning, Winding, Drying, Applying, Warnishing And Changing The Bearing If Necessary, Greasing The Bearing Assembling And Giving Satisfactory Trial On No Load And Full Load ( This Item Will Not Execute If Motor Is Rewinded ) 38 Supplying And Errectionof Bearing As Per Specification Including Removing & Dismentalling Motor Re-Errection Of Motor Etc. Complete Test And Trial For 25 Hppump 39 25 Hp Pump Assembly Removing, Dismentalling, Assembling And Re-Errection Of Pump 40 Removing, Machining Fitting And Assembly Of Ss Shaft Sleeve Of 25 Hp Pump 41 25 Hp Pump Removing, Supplying And Fitting, Housing, Bushing, Gland Packing, Water Seal Ring , Rubber Sheet, Nut Bolt Etc. And Other Necessary Item 42 25 Hp Testing And Calibrating Electro Magnetics Relays, Electro Statics Kind Ofrelays, Contactor, Timer, Indicator And Switches & Other Items Etc. 43 10 Hp Back Wash Submersibal Motor Rewinding, Of 10 Hp Back Wash Submersibal Repairs Of Squirrel Cage Induction Motor, Three Phasewith Insulation, Varnishing And Painting Etc. ( Scrap Of Winding Material Shall Be Retained By Rewinder ) 44 Supplying And Errection Of Bearing As Per Specification Including Removing & Dismentalling Motor Re-Errection Of Motor Etc. Complete Test And Trial For 10 Hp Back Wash Submersibal Pump 45 5 Hp Motor Rewinding, Of 5 Hp Repairs Of Squirrel Cage Induction Motor, With Insulation, Varnishing And Painting Etc. ( Scrap Of Winding Material Shall Be Retained By Rewinder ) 46 Supplying And Errection Of Bearing As Per Specification Including Removing & Dismentalling Motor Re-Errection Of Motor Etc. Complete Test And Trial For 5 Hppump 47 3 Hp Motor Rewinding, Of 3 Hp Repairs Of Induction Motor, With Insulation, Varnishing And Painting Etc. ( Scrap Of Winding Material Shall Be Retained By Rewinder ) 48 Supplying And Errection Of Bearing As Per Specification Including Removing & Dismentalling Motor Re-Errection Of Motor Etc. Complete Test And Trial For 3 Hppump 49 1 Hp Motor Rewinding, Of 1 Hp Repairs Of Induction Motor, With Insulation, Varnishing And Painting Etc. ( Scrap Of Winding Material Shall Be Retained By Rewinder ) 50 Supplying And Errectionof Bearing As Per Specification Including Removing & Dismentalling Motor Re-Errection Of Motor Etc. Complete Test And Trial For 1 Hppump 51 ½ Hp Motor Rewinding, Removing, Dismentalling, Of ½ Hp Repairs Of Squirrel Cage Induction Motor, With Insulation, Varnishing And Painting Etc. ( Scrap Of Winding Material Shall Be Retained By Rewinder ) 52 Supplying And Errection Of Bearing As Per Specification Including Removing & Dismentalling Motor Re-Errection Of Motor Etc. Complete Test And Trial For ½ Hppump 53 Providing, Commissioning And Giving Satisfactory Test And Trial Of Spare Parts Like Contactor, As Kind Of Relays, Timer, Switches, Indicator Lamp, Fuses, Ct, Mcb, Push Button, Thermostat And Other Necessary Items For All Pannels & Other Machinery Etc. 54 Rewindingofoil Immersed Auto Transformer For 150 Hp, 120 Hp, 100 Hp, 60 Hp, 50 Hpmotor Starter Pannel With A Appropriate Filter Transformer Oil Level Filling Complete 55 Repairs Of Bushing Oil Leakage, Sparking & Heatup Problem And Other Work For Auto Transformer Complete 56 Filling And Maintainingfilter Transformer Oil Level Of 630 Kva Pure Water Transformeras Per Requirement 57 Reparing Of 630 Kva Pure Water Transformer Bushing Oil Leakage, Sparking & Heatup Problem Of Transformer, D.O. Fuse, A. B. Fuse & Other Repair Problem Of Substation Complete 58 Filling And Maintainingfilter Transformer Oil Level Of400 Kva Raw Water Transformeras Per Requirement 59 Reparing Of 400 Kva Pure Water Transformer Bushing Oil Leakage, Sparking & Heatup Problem Of Transformer, D.O. Fuse, A. B. Fuse & Other Repair Problem Of Substation Complete 60 Repair Of Clarifacculator Gear Box, Vibration, Noise, Gear Teeth, Misallignment Etc.Complete 61 Repair Of Bridge Gear Box, Vibration, Noise, Gear Teeth, Misallignment Etc.Complete 62 Repair Of Flax Mixure Gear Box, Vibration, Noise, Gear Teeth, Misallignment Etc.Complete 63 Repair Of Alum Mixure Gear Box, Vibration, Noise, Gear Teeth, Misallignment Etc.Complete 64 Carting Charges

Key Value

Document Fees
INR 500 /-
EMD
INR 3000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work:
Sl. No. Item Description
1150 HP motor rewinding, removing, dismentalling, loading & unloadingof 150 HP repairs of squirrel cage induction motor, three phase vertical solid shaft motorSPDP 415 volt with insulation,varnishing and painting etc. (Scrap Of Winding Material shall be retained by rewinder)
2150 HP motor servicing and overhauling of motor including removing from location, dismentalling, cleaning, winding, drying, applying, warnishing and changing the bearing if necessary, greasing the bearing assembling and giving satisfactory trial on no load and full load (This item will not execute if motor is rewinded)
3Supplying and errection of bearing as per specification including removing & dismentalling motor re-errection of motor etc. complete test and trial for 150 HPpump
4150 HP Pump assembly removing, dismentalling, assembling and re-errection of pump
5Removing, machining, fitting and assembly of SS shaft sleeve of 150 HP pump
6150 HP pump removing, supplying and fitting, housing, bushing, gland packing, water seal ring , rubber sheet, nut bolt etc. and other necessary item
7150 HP testing and calibrating electro magnetics relays, electro statics kind of relays, contactor, timer, indicator and switches & other items etc.
8120 HP motor rewinding, removing, dismentalling, loading & unloadingof 120 HP repairs of squirrel cage induction motor, three phase vertical solid shaft motorSPDP 415 volt with insulation,varnishing and painting etc. (Scrap Of Winding Material shall be retained by rewinder)
9120 HP motor servicing and overhauling of motor including removing from location, dismentalling, cleaning, winding, drying, applying, warnishing and changing the bearing if necessary, greasing the bearing assembling and giving satisfactory trial on no load and full load (This item will not execute if motor is rewinded)
10Supplying and errection of bearing as per specification including removing & dismentalling motor re-errection of motor etc. complete test and trial for 120 HPpump
11120 HP Pump assembly removing, dismentalling, assembling and re-errection of pump
12Removing, machining fitting and assembly of SS shaft sleeve of 120 HP pump
13120 HP pump removing, supplying and fitting, housing, bushing, gland packing, water seal ring , rubber sheet, nut bolt etc. and other necessary item
14120 HP testing and calibrating electro magnetics relays, electro statics kind ofrelays, contactor, timer, indicator and switches & other items etc.
15100 HP motor rewinding, removing, dismentalling, loading & unloadingof 100 HP repairs of squirrel cage induction motor, three phase vertical solid shaft motorSPDP 415 volt with insulation,varnishing and painting etc. (Scrap Of Winding Material shall be retained by rewinder)
16100 HP motor servicing and overhauling of motor including removing from location, dismentalling, cleaning, winding, drying, applying, warnishing and changing the bearing if necessary, greasing the bearing assembling and giving satisfactory trial on no load and full load (This item will not execute if motor is rewinded)
17Supplying and errection of bearing as per specification including removing & dismentalling motor re-errection of motor etc. complete test and trial for 100 HPpump
18100 HP Pump assembly removing, dismentalling, assembling and re-errection of pump
19Removing, machining fitting and assembly of SS shaft sleeve of 100 HP pump
20100 HP pump removing, supplying and fitting, housing, bushing, gland packing, water seal ring , rubber sheet, nut bolt etc. and other necessary item
21100 HP testing and calibrating electro magnetics relays, electro statics kind ofrelays, contactor, timer, indicator and switches & other items etc.
2260 HP horizontal motor rewinding, removing, dismentalling, loading & unloadingof 60 HP repairs of squirrel cage induction motor, three phase vertical solid shaft motorSPDP 415 volt with insulation,varnishing and painting etc. (Scrap Of Winding Material shall be retained by rewinder)
2360 HP horizontal motor servicing and overhauling of motor including removing from location, dismentalling, cleaning, winding, drying, applying, warnishing and changing the bearing if necessary, greasing the bearing assembling and giving satisfactory trial on no load and full load (This item will not execute if motor is rewinded)
24Supplying and errectionof bearing as per specification including removing & dismentalling motor re-errection of motor etc. complete test and trial for 60 HP horizontalpump
2560 HP horizontal Pump assembly removing, dismentalling, assembling and re-errection of pump
26Removing, machining fitting and assembly of SS shaft sleeve of 60 HP horizontal pump
2760 HP horizontal pump removing, supplying and fitting, housing, bushing, gland packing, water seal ring , rubber sheet, nut bolt etc. and other necessary item
2860 HP horizontal testing and calibrating electro magnetics relays, electro statics kind ofrelays, contactor, timer, indicator and switches & other items etc.
2950 HP motor rewinding, removing, dismentalling, loading & unloadingof 50 HP repairs of squirrel cage induction motor, three phase vertical solid shaft motorSPDP 415 volt with insulation,varnishing and painting etc. (Scrap Of Winding Material shall be retained by rewinder)
3050 HP motor servicing and overhauling of motor including removing from location, dismentalling, cleaning, winding, drying, applying, warnishing and changing the bearing if necessary, greasing the bearing assembling and giving satisfactory trial on no load and full load (This item will not execute if motor is rewinded)
31Supplying and errection of bearing as per specification including removing & dismentalling motor re-errection of motor etc. complete test and trial for 50 HPpump
3250 HP Pump assembly removing, dismentalling, assembling and re-errection of pump
33Removing, machining fitting and assembly of SS shaft sleeve of 50 HP pump
3450 HP pump removing, supplying and fitting, housing, bushing, gland packing, water seal ring , rubber sheet, nut bolt etc. and other necessary item
3550 HP testing and calibrating electro magnetics relays, electro statics kind of relays, contactor, timer, indicator and switches & other items etc.
3625 HP motor rewinding, removing, dismentalling, loading & unloadingof 25 HP repairs of squirrel cage induction motor, three phase vertical solid shaft motorSPDP 415 volt with insulation,varnishing and painting etc. (Scrap Of Winding Material shall be retained by rewinder)
3725 HP motor servicing and overhauling of motor including removing from location, dismentalling, cleaning, winding, drying, applying, warnishing and changing the bearing if necessary, greasing the bearing assembling and giving satisfactory trial on no load and full load (This item will not execute if motor is rewinded)
38Supplying and errectionof bearing as per specification including removing & dismentalling motor re-errection of motor etc. complete test and trial for 25 HPpump
3925 HP Pump assembly removing, dismentalling, assembling and re-errection of pump
40Removing, machining fitting and assembly of SS shaft sleeve of 25 HP pump
4125 HP pump removing, supplying and fitting, housing, bushing, gland packing, water seal ring , rubber sheet, nut bolt etc. and other necessary item
4225 HP testing and calibrating electro magnetics relays, electro statics kind ofrelays, contactor, timer, indicator and switches & other items etc.
4310 HP back wash submersibal motor rewinding,of 10 HP back wash submersibal repairs of squirrel cage induction motor, three phasewith insulation,varnishing and painting etc. (Scrap Of Winding Material shall be retained by rewinder)
44Supplying and errection of bearing as per specification including removing & dismentalling motor re-errection of motor etc. complete test and trial for 10 HP back wash submersibal pump
455 HP motor rewinding,of 5 HP repairs of squirrel cage induction motor,with insulation,varnishing and painting etc. (Scrap Of Winding Material shall be retained by rewinder)
46Supplying and errection of bearing as per specification including removing & dismentalling motor re-errection of motor etc. complete test and trial for 5 HPpump
473 HP motor rewinding,of 3 HP repairs of induction motor,with insulation,varnishing and painting etc. (Scrap Of Winding Material shall be retained by rewinder)
48Supplying and errection of bearing as per specification including removing & dismentalling motor re-errection of motor etc. complete test and trial for 3 HPpump
491 HP motor rewinding, of 1 HP repairs of induction motor,with insulation,varnishing and painting etc. (Scrap Of Winding Material shall be retained by rewinder)
50Supplying and errectionof bearing as per specification including removing & dismentalling motor re-errection of motor etc. complete test and trial for 1 HPpump
51½ HP motor rewinding, removing, dismentalling, of ½ HP repairs of squirrel cage induction motor,with insulation,varnishing and painting etc. (Scrap Of Winding Material shall be retained by rewinder)
52Supplying and errection of bearing as per specification including removing & dismentalling motor re-errection of motor etc. complete test and trial for ½ HPpump
53Providing, commissioning and giving satisfactory test and trial of spare parts like contactor, as kind of relays, timer, switches, indicator lamp, fuses, CT, MCB, push button, thermostat and other necessary items for all pannels & other machinery etc.
54Rewindingofoil immersed auto transformer for 150 HP, 120 HP, 100 HP, 60 HP, 50 HPmotor starter pannel with a appropriate filter transformer oil level filling complete
55Repairs of bushing oil leakage, sparking & heatup problem and other work for auto transformer complete
56Filling and maintainingfilter transformer oil level of 630 KVA pure water transformeras per requirement
57Reparing of 630 KVA pure water transformer bushing oil leakage, sparking & heatup problem of transformer, D.O. fuse, A. B. fuse & other repair problem of substation complete
58Filling and maintainingfilter transformer oil level of400 KVA raw water transformeras per requirement
59Reparing of 400 KVA pure water transformer bushing oil leakage, sparking & heatup problem of transformer, D.O. fuse, A. B. fuse & other repair problem of substation complete
60Repair of Clarifacculator gear box, vibration, noise, gear teeth, misallignment etc.complete
61Repair of bridge gear box, vibration, noise, gear teeth, misallignment etc.complete
62Repair of flax mixure gear box, vibration, noise, gear teeth, misallignment etc.complete
63Repair of Alum mixure gear box, vibration, noise, gear teeth, misallignment etc.complete
64Carting Charges
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail