| 1 | Jagdishpur Panchayat Piped Water Supply Scheme |
| 2 | BUILD PHASE (SL. NO. - 1.02 TO SL. NO. -1.55) |
| 3 | Provide all material labour T&P etc. complete required for repairing and painting of pump House,door and window with one coat putty over brick wall plaster then two coat of Apex ultima exterior paint for proper competition of work. |
| 4 | Provide all material labour T&P etc. complete required for repairing and painting of staff quarter,door and window withone coat putty over brick wall plaster then two coat of Apex ultima exterior paint for proper competition of work. |
| 5 | Provide all material labour T&P etc. complete required for repairing and painting of Boundry wall with one coat putty over wall plaster then two coat of Apex ultima exterior paint for proper competition of work. |
| 6 | Repairing and painting of MS gate including all labour T&P complete for proper completion of work. |
| 7 | Repairing and painting of the bypass chamber for the pump house1.0m(L) ×1.0m (W) × 1.15m(H) drawing and as per instruction of engineering charge. |
| 8 | Provide all materials , labour, T&P etc.required for proper completion of work and construct brick on edge approach road |
| 9 | Repair work of RCC over head tank of 200 KL capacity and 12 m staging Scrapping of old paint dismantling of damaged floor Finishing wall with premium acrylic smooth exterior paint (two coat) with silicon additivesall time weather proof paint i.e. apex ultima or other similar approved make quality and of required shade over one priming coat on new work with two coats to give an even shade including cost of one priming coat preparation of surface & supply of all materials labour T &P etc required for proper completion of the work (Outer plaster/Pointing Area), Coating of internal surface of container with water proof material, Repair of flange joints of inlet, outlet, overflow, washout pipe inluding supply of all material, special, labour complete. Also including painting of pipes. 25 mm thick 1:2:4 P.C.C. floor with cement and coarse sand & 20 mm gauge approved stone ballast laid on panels finished with 3 mm floating coat of neat cement and 7.5 cm thick base and concrete consisting of cement and coarse sand and Ist class brick ballast 4 cm gauge in proportion of 1:6:2 and removing any over lapping of mortar in the joints of the panels if any and giving them uniform finish including supply of all materials, labour, T&P etc required for proper completion of the work. Repair of stair case and its railing and Repair of sluice valves and chamber, Repair/ change ofTop dome Manhole mesh, Lightening conductor , water level indicator, earthing stirrups for lightening conductorincluding supply of all material, labour T & P etc. complete. |
| 10 | Excavation in foundation in ordinary soil (loam,clay or sand ) including lift up to 1.50 m& lead up to 50 m,refilling,watering and ramming of evcavated earth into the trenches and disposal of surplus earth up to the distance of 50 mfrom the center of the foundation trenches. |
| 11 | Supply of the following sizes of pipes including railway freight,insurances, taxes etc including cost of all jointing material,labour T & P etc. complete. |
| 12 | 63 mm dia HDPE PN-6 |
| 13 | 75 mm dia HDPE PN-6 |
| 14 | 90 mm dia HDPE PN-6 |
| 15 | 110 mm dia HDPE PN-6 |
| 16 | 140 mm dia HDPE PN-6 |
| 17 | 160 mm dia HDPE PN-6 |
| 18 | Carting of following types of pipeslowering them into already prepared trenches laying and jointing and testing with supply of all labour t&p etc. All complete. |
| 19 | 63 mm dia HDPE PN-6 |
| 20 | 75 mm dia HDPE PN-6 |
| 21 | 90 mm dia HDPE PN-6 |
| 22 | 110 mm dia HDPE PN-6 |
| 23 | 140 mm dia HDPE PN-6 |
| 24 | 160 mm dia HDPE PN-6 |
| 25 | Making inter connections from proposed pipe line to existing pipe line including necessary excavation of trenches, refilling them properly and including supply of all material, labour T & P etc. complete. |
| 26 | All Size of pipe line Joint |
| 27 | Supply,Carting, laying and jointing of the following sizes of Valves including railway freight,insurances, taxes etc, lowering them into the trenches and cost of all jointing material,labour T & P etc. complete. |
| 28 | Sluice Valve 100 mm |
| 29 | Sluice Valve 80 mm |
| 30 | Sluice Valve 65 mm |
| 31 | Sluice Valve 50 mm |
| 32 | Supply of all material,labour T & P and construction of following chambers as per type design. |
| 33 | Sluice valve chamber (surface box Type) |
| 34 | Leakage repairing workin PVC pipe lines includingexcavation of trenches in all type of soil and refilling the trenches, cutting of pipes , fixing of specials, bailing out of water if required and testing of pipe line after repair etc. and also including supply of all jointing material ,ISI mark PVC pipes & specials such as PVC Tee, PVC Socket, CI D-joints etcrequired for leakages repair and also supply of all labour T & P etc. for proper completion of work. |
| 35 | P.V.C. 63 mm dia |
| 36 | P.V.C. 75 mm dia |
| 37 | P.V.C. 90 mm dia |
| 38 | P.V.C. 110 mm dia |
| 39 | P.V.C. 140 mm dia |
| 40 | Provision of Tap house connection of individual household as per departmental type design and drawing including supply of all material such as 20 mm O.D. MDPE Pipe / 15 mm G.I. pipeupto 10 Mts.length and specials (15 mm G.I. Elbow, Saddle, Brass ferrule or stainless steel FCV, adopter, brass bib cock/ stop cock etc.) complete including dismantling and permanent reinstatement of road surfaces with all material, labour, T&P etc required for proper completion of the work. |
| 41 | Repairing of old damaged Tap house connection with fixing of stainless steel FCV of Jagdishpur water supply including supply of all material labour T&P etc required for proper completion of the work. |
| 42 | Dismentalling of following type of road surface (BOE, C.C. , C.C. Tiles & Bitumen) for laying of pipe line including sortingout of serviceable material and disposal of unsereviceable material. |
| 43 | B.O.E. |
| 44 | C.C.Tile road |
| 45 | C.C. Road |
| 46 | Bitumen |
| 47 | Reinstatement of following type of road surface (BOE, C.C. , C.C. Tiles & Bitumen) for laying of pipe line including sortingout of serviceable material and disposal of unsereviceable material. |
| 48 | B.O.E.Road (40% new & 60% old Brick) |
| 49 | C.C.Tile road (40% new & 60% old tiles) |
| 50 | C.C. Road |
| 51 | Bitumen |
| 52 | Crossing of small drains or culverts width as Follows for laying of pipe line including dismentalling of drains and reconstruction the same |
| 53 | Main Drains up to 7.00 m |
| 54 | Small Drains up to 3.00 m |
| 55 | Crossing of metalled road / cc road by trenchless method with use casingpipe including supply of all material, labour T&P etc. complete. |
| 56 | Site clearance works necessary for above work if required depend on site condition & only after direction given by engineer in charge |