| 1 | Decentralized Material |
| 2 | DEAD END CLAMP WITH I HOOK ABCABLE PCC |
| 3 | STAY CLAMP WITH N&B PCC POLE 8.5MTR |
| 4 | SUSPENSION CLAMP WITH EYE HOOK |
| 5 | M.S. HALF CLAMP FOR PCC MS 35X5 SQ. MM. LT, N&B |
| 6 | MS CLAMP PCC WITH N/B FOR SUSP.CLAMP |
| 7 | SHEAR HEAD TYPE IPC 125 to 25 sq mm |
| 8 | LT BARE N. CONNECTOR PG CLAMP 95-25 sq. mm. |
| 9 | IPC for 120sq. mm to120 sq mm |
| 10 | MS Clamp withN&B for PCC DeadEnd Clamp |
| 11 | LT Bare N Con.PG Clamp For L-L 95-95sqmm |
| 12 | MS FLAT 35X5 mm. SET FOR DISTRIBUTION BOX WITH N&B |
| 13 | LT DISTRUBITON BOX 3 PHASE |
| 14 | Aluminium Lugs CRIMPING type 120 sq. mm. |
| 15 | Aluminium Lugs 0 type 25 mm. (4X25) |
| 16 | Labour Charges for laying of Arial Bunch Cable |
| 17 | Cartage of PCC Pole from Store Center Haldwani/Rudrapur to Work Site With Stacking Site in 1Km Distance, Including Loading & Unloading (Distance 5 Km to 80 Km) |
| 18 | Cartage of Small Line Material from Store Center Kashipur/ Haldwani/Rudrapur to Work Site Incliding, Loading & Unloading ( Distance 5 Km to 80 Km) |
| 19 | Errection of Earthing of support with M.S. Earth rod of 2.5 meter long by hammering of M.S. Rod to proper depth and connecting G.I. wire as per construction manual & Head of the earth rod should be 30cm below the ground level. |
| 20 | Errection of LT Stay with Fixing , tightening and nozzaling of Stay with pole and stay rod on required tension as per drawing / RESSPO manual. |
| 21 | Grouting of Stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including costof Cemaent,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO Manual. |
| 22 | Erection of PCC Single support pole in proper level and alignment alongwith fixing of all accessories, like top channel,X-bracing & clampsas per RESSPO construction Manual. |
| 23 | Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 (1 cement :4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement,sand andstone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO construction Manual. |
| 24 | DISMANTLING OF LT LINE 1 P 2 W(WEASEL) |
| 25 | DISMANTLING OF LT LINE 2 P 3 W(WEASEL) |
| 26 | LAYING OF LT PVC CABLE (UP TO 150 SQ. MM.) |
| 27 | LAYING OF AB CABLE OF SIZE 120 SQMM (LT XLPE AB CABLE 3X120+1X95 SQ.mm.) |
| 28 | DISCONNECTION & RECONNECTIONOF CONsumer |
| 29 | DISMANTLING OF AB CABLE |
| 30 | DISCONNECTION & RECONNECTIONOF CONsumer |
| 31 | ERRECTION OF DEAD END CLAMP |
| 32 | ERRECTION OF SUSPENSION CLAMP |
| 33 | FIXING & Installation of L.T Distribution Board with Fixing of LTDB in the Pole Proper Clamps &Laying & Fixing Insulated Cable 1x95 sqmm complete work |
| 34 | FIXING OF PIERCING CONNECTOR 120-95 MM. |
| 35 | FIXING OF PIERCING CONNECTOR 120-35 MM. |
| 36 | FIXING OF PG CLAMP 120-120 sq. mm. |
| 37 | FIXING OF PG CLAMP 95-70 sq. mm. |