Tender For Consultancy Services For Preparation Of Detailed Project Report For A) Chandurbazar Bypass On Nh 353J (Length 6.00Km) B) Morshi Byapss On Nh 353 K( Length 9.00Km) C) Udkhed Realignment On Nh 353J ( Length 4 Km. D) Warud Bypass On Nh 353 K, morshi-Maharashtra

Ministry Of Road Transport And Highways has published Tender For Consultancy Services For Preparation Of Detailed Project Report For A) Chandurbazar Bypass On Nh 353J (Length 6.00Km) B) Morshi Byapss On Nh 353 K( Length 9.00Km) C) Udkhed Realignment On Nh 353J ( Length 4 Km. D) Warud Bypass On Nh 353 K. Submission Date for this Tender is 29-01-2024. Consultancy Service Tenders in morshi Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

41502394
Corrigendum : Tender For Consultancy Services For Preparation Of Detailed Project Report For A) Chandurbazar Bypass On Nh 353J (Length 6.00Km) B) Morshi Byapss On Nh 353 K( Length 9.00Km) C) Udkhed Realignment On Nh 353J ( Length 4 Km. D) Warud Bypass On Nh 353 K
Open Tender
Indian
Maharashtra
morshi
29-01-2024

Tender Details

Consultancy Services For Preparation Of Detailed Project Report For A ) Chandurbazar Bypass On Nh 353J ( Length 6.00Km ) B ) Morshi Byapss On Nh 353 K ( Length 9.00Km ) C ) Udkhed Realignment On Nh 353J ( Length 4 Km. D ) Warud Bypass On Nh 353 K

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 11-Jan-2024 Other 1 Other 22-01-2024
2 17-Jan-2024 Other2 Other 22-01-2024
3 21-Jan-2024 Date 3 Date 24-01-2024
4 24-Jan-2024 Date 4 Date 29-01-2024

Key Value

Document Fees
INR 11800 /-
EMD
INR 200000.0 /-
Tender Value
Refer document

BOQ Items

NAME OF WORK : Consultancy services for Preparation of Detailed Project Report for A) Chandurbazar Bypass on NH 353J ( Length = 6.00Km) , B) Morshi Byapsson NH 353 K ( Length = 9.00Km) , C) Udkhed realignment on NH 353J ( length = 4 km. D) Warud Bypass on NH 353 K ( Length = 12.00 km. E) Digras bypass on NH 161A ( Length = 5.00 km ) F) Missing link of NH 353J connecting NH 548C in Paratwada in 4L+PS( length = 7.00 km ) G) Forest stretch of NH 353J Morshi Chandurbazar Achalpur (length = 3.5 km ) Total length 46.5 km length in the state of Maharashtra.
Sl. No. Item Description
1Key Personnel
2Team Leader cum Senior Highway Engineer
3Senior Bridge Engineer
4Highway cum Pavement Engineer
5Material-cum-Geotechnical Engineer- Geologist
6Senior Survey Engineer
7Traffic and Safety Expert
8Environmental Specialist
9Quantity Surveyor/ Documentation Expert
10Land Acquisition Expert
11Utility Expert
12B: Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
13To be filled by Consultant
14To be filled by Consultant
15To be filled by Consultant
16To be filled by Consultant
17Support Staff
18Office Manager
19Typist
20Office Boy
21Night Watchman
22The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For Consultant: Mahindra Bolero or Equivalent (Not more than 2 years old)
23Innova or Equivalent (Not more than 2 years old) (Fixed Costs)
24Office Rent (Fixed Costs) The rent cost includes maintenance, Cleaning, repairs, etc.
25VI. Office Supplies, Utilities and Communication ( Fixed Costs )
26Office Supplies Drafting
27Supplies computer
28Running Costs
29Domestic and International Communication
30Office Furniture and Equipment ( Rental )
31Office Furniture and Equipment
32VIII.Reports and Document Printing
33Monthly Report (3 per month)
34Inception Report & QAP
35Environment and Social Impact Screening Report
36Draft Feasibility Report
37Final Feasibility Report
38Strip Plan with L.A. Reports
39Draft LA and Clearances I Report
40Final LA and Clearances I Report
41Draft Environmental Assessment report & RAP
42Final Environmental Assessment report & RAP
43Draft Detailed Design Report & Drawings etc.
44Draft EMP
45Draft Bidding Documents
46Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings ,etc
47Final EMP
48Final Bidding Documents
49Draft 3(a) ,3(A) and 3(D) notification for land acquisition ( 3 copies each)
50LA & Clearances II Report
51IX Survey and Investigation
52Topographic Survey including hire charges for equipment and supply of survey Teams comprising of project survey field staff etc. inclusive of cost of materials , labourer.
53Detailed topographic surveys using Air Borne Tomography and Air Borne LiDAR Technology
54B. Investigation (Fixed cost)
55Road and Bridge Inventory
56FWD Test and Pavement Evaluation
57Roughness Survey
58Axle Load Survey
59Material Survey and Investigation
60Sub-grade Investigation
61Traffic Survey
62Socio-economic & Census Survey/ Studies
63Land Acquisition Studies
64Sub Soil investigation (Boring)
65a) Boring in all types of soil(other than hard rock)
66b) Boring in hard rock
67Any other investigations/surveys/drone survey
68C. NET WORK SURVEY AND GPR
69Net work Survey of the existing Highways as a responsitory for civil work as per direction from Authority
70GPR Survey for detection of under ground utilities
71Cost of supply and fixing boundary pillars
72Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967:Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
73Land acquisition Team including support staff and logistics/transportation
74Ex-Land revenue inspector/officer or equivalent
75EX-kanoogo/Girdwar or equivalent
76Ex-Patwari or equivalent
77typist
78peon
79Estimate of Costfor Expatriate Consultants (INR) Remuneration of Exptriate staff including per diem allowances
80Staff 1
81Staff 2
82Staff 3
83Staff 4
84Staff 5
85Staff 6
86International Airfares (Fixed Cost) Mobilization andDemobilization
87Position 1
88Position 2
89Position 3
90Position 4
91Inland Travel in Home Country (Fixed Costs)
92Airlines
93Other Miscellaneous expenses (like DA, internal travel expenses other incidentals)
94Income Tax (Expariate)( as per prevaling Norms)
95Other Taxes / Duties (if any) Specify clearly
96Goods & Service Tax( as per prevaling Norms)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail