Urban Local Bodies has published Construction Of Rcc Box Culvert Infront Of Shyamol Das At Layekbazar And Baganpara Connecting Road Within The Ward No-02. Submission Date for this Tender is 27-01-2024. Culvert Tenders in bolpur West Bengal. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Page No.-010, Item No.-3(a)Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. (a) In ground floor including roof. |
2 | Page No.-010, Item No.-2(a)Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof. |
3 | Page No.-010, Item No.-2(a)Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof. (a) upto 150 mm. thickm. |
4 | Page No.-1, Item No.-2 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm |
5 | Page No.-02, Item No.-4(b.)Filling in foundation or plinth by silver sand in layers not exceding 150mm as directed and consoledating same by through saturation with water ramming complete, includig the post of supply of sand. (Payment to be made on basis of measurement of finished quantity of work) (B) Do- by fine sand. |
6 | Page No.-14, Item No.- 1Single Brick Flat Soling of picked Jhama Brick including ramming and dressing bed to proper level and filling joints with powder earth or local sand. |
7 | Page No.-24, Item No.- 4(a) Ordinary cement concrete (mix 4:2:1)) with grade stone chips (20mm down excluding shuttering and reinforcement. If any in ground floor as per relevent IS Codes (a) PakurVariety |
8 | Page No.-26, Item No.- 7(i)Ordinary cement concrete (mix 1:1.5:3)) M-20 with grade stone chips (20mm down excluding shuttering and reinforcement. If any in ground floor as per relevent IS Codes.(i) Pakur Variety |
9 | Page No.-42, Item No.- 36 Hire and labour charges for shuttering with centering and necessary staging upto 4m using approved stout props and thick hard wood planks of approved thickness with required braching for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion ofwork.(upto roofof ground floor)(f) 25 mm to 30 mm thick wooden shuttering without staging in foundation. |
10 | (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-in -charge. |
11 | Page No.-43, Item No.- 40(a)(II) Reinforcement for reinforced concrete work in the all sorts of structures including distribution bers, stiriups, binders etc. including supply of rods, initial straightening and removal of loose rust (if necessary) cutting to repuidte length , booking and bending to correct shapes, placing in proper position and binding with 16 mm gauge black anneled wire at every inter section, complete as per drawin and direction. (a) For work in foundation, basement and upto roof of ground floor/upto 4 m.(i) Tor Steel/Mild SteelII. JSW/JSPL/SHYAM/SRMB |
12 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge |
13 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)(iii) With carried earth arranged by the contractor within a radius exceeding 3 km. but not exceeding 5 km. including the cost of carried earth |
14 | ADD 18 % GST |
15 | ADD 1% CESS |