Border Security Force-BSF has published Tender For Dry Dock Repair Of Mechanized Boat Krishna. Submission Date for this Tender is 07-02-2024. Commercial Marine Vehicle Tenders in bhuj Gujarat. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | (A )DECK/HULL SIDE All zinc anodes of hull are required to be replaced with new one and Zink anode bolts of both main engine to be replaced. |
2 | Keel protecting plate and protecting plate screw at front portion to be replaced. |
3 | 01 set sea chest non returning valves required replacement. |
4 | In side passenger cabin and pilot house side wall required lamination and FRP work. |
5 | All FRP body to be checked and required to be repaired as per IRS recommendation. |
6 | i) All around damaged rubber fenders required to be replaced. |
7 | ii) All side portable pneumatic fender to be replaced. |
8 | ANCHORING SYSTEM i) 35 Mtr SS anchor chain 10 mm dia to be provided. |
9 | ii) 20 Kgs grapnel anchor with rope approximate 18 mm x 120 feet. |
10 | iii) Anchor winch and lifting motor required to be replace. |
11 | CABIN Pilot, passenger seat with back rest and hand rest foam & rexineto be replaced. |
12 | WINDOW CURTAIN i) All side window glasses curtain required new fitting with curtain. Curtain holder required to be installed. |
13 | WIPER i) Wiper along with blades and holder to be replaced. |
14 | ii) Wiper water spray system to be checked and defective item to be replaced. |
15 | iii) Wiper motor to be replaced. |
16 | MAIN ENGINE AND ENGINE ROOM :- Main Engine Make and Types- 2 x Cummins, QSB 6.7 4801D1 Ref No QSB6.7 4801NT, Power: 473 HP 3000 RPM. Boththe main engine required complete major overhauling. Other maintenance of main engines and its system to be carried out as per the schedules prescribed by OEM/ Manufacture. Engine Srl No. 74090192 (Stbd) & 74090187 (Port) Engine Model No.-QSB 6.7 INT 473 HP Run Hours (Port) – 3864.15 Hrs,(Stbd)- 3865.35 Hrs . i) Both main engines require ‘D’ check maintenance as per OEM schedule by the authorized service agencies of Cummins Engine |
17 | All sea water line and valve required cleaning by chemical and pressure test. If any found damage/poor condition required to be replaced. |
18 | Both main engine and gear box mounting and vibration pad required to be replaced. |
19 | Both main engines inter cooler and oil cooler required to be replaced with new |
20 | Battery of both main engine-02 x 02 (180 AH)=04 Nos, DG Set-01 no (120AH) and emergency battery-(180 AH)=02 Nos required to be replaced. |
21 | Convertor of 24-volt DC to 13.7-volt 10 AMP required replaced. |
22 | All destructive safety device required to be replaced |
23 | Both Sea water pump required to be replaced. |
24 | Bilge /fire line with valve required servicing/cleaning by chemical and pressure test, if any found damage/poor condition required to be replaced as per IRS recommendation. |
25 | Electrical fire pump/ Bilge pump to be replaced. |
26 | Complete rubber hose pipe required to be replaced. |
27 | Fire hydrant, nozzle required to be serviced and hose required to be replaced. |
28 | Engine alarms check and make functional. |
29 | Engine operational instruments servicing and to be functional. |
30 | Flexible fuel line with clamp required to be replaced. |
31 | Turbocharger to be serviced. |
32 | Fuel pump servicing & calibration and adjustment as per specified fuel pressure for marine engine regulation. |
33 | All injector required to be calibration and pressure testing as per prescribed by OEM/ Manufacture. |
34 | Defective silencer pipes /flanges/mufflers required to be replaced. |
35 | Both main engine Exhaust manifold with clamp required to be replaced & inlet manifold decarburization. |
36 | Heat exchanger tube to be servicing. |
37 | Fresh water pump required serving and defective spare parts/ kit to be replaced. |
38 | Both Self-starter required to be replaced. |
39 | Port side alternator required to be serviced and Stbd side required to be replaced. |
40 | Sea water cooling valve of both main engine required to be replaced. |
41 | All retaining /non-retaining /delivery valves and wheel, bolts with gasket of retaining valve,non-retaining valve/discharge valve required to be replaced. |
42 | Over board discharge valve, sea suction valve to be over hauling and pressure tested |
43 | DG SET i) 8 KVA DG set required to be replaced with new version. |
44 | ii) DG set sea water cooling strainer with line required replaced. |
45 | iii) One ½ inch new mono block pump is required to be provided for use in emergency basis. |
46 | FIRE ALARM Complete fire alarm system to be check and required to be made operational and horn system made with 24 Volt stainless steel small size duel (Marine grade) required. |
47 | Defective wiring, switches, cables and sensors of fire alarm required replaced. |
48 | BLOWERS i)02 Nos engine room fan/ blowers & exhaust motor required to be replaced. |
49 | ii)Blower and exhaust fan base required to be repaired. |
50 | STEERING SYSTEM i) Hydraulic steering system to be serviced. |
51 | ii) All hydraulic pressure pipe required to be replaced and pressure tested . |
52 | GEAR BOX i) Both M/E gear box coupling oil seal required to be replaced. |
53 | ii)Recommended gear oil as per OEM to be replaced. |
54 | iii)Gear oil cooler with sensor to be replaced. |
55 | iv)Hydro force 12 volt of gear box required replaced. |
56 | PROPULSION UNIT i)Both stainless steel Propeller shaft 50mm (diameter) to be replaced. |
57 | ii) Both Rudder to be replaced. |
58 | iii)Rudder shaft with seal required to be replaced. |
59 | iv)Both ‘P’ bracket required re-fitted with proper alignment. |
60 | v) Propeller required to be replaced with proper alignment. |
61 | vi) ‘P’ bracket bush and gallon bush required to be replaced. |
62 | vii) Complete unit alignment with gear box, engine, propeller shaft and propeller. |
63 | GPS system required calibration. |
64 | All navigation lights, deck light/wheel house light & crew cabin light to be made operational and defective items be replaced. |
65 | Defective bulbs, switches wiring to be replaced 24 Volt and 230 Volt. |
66 | I) Deck panel board defective switches and lights required to be replaced. |
67 | Main switch board circuit breakers to be servicing. |
68 | ECHO SOUNDER Echo sounder required to be calibrated by authorized dealer and defective item to be replaced |
69 | SEARCH LIGHTS Search light required to be replaced as new version/LED system. |
70 | Flood lights required replace with (LED). |
71 | Rubber packing of Hatch cover of engine room, wheel house, crew cabin and front deck required to be replaced. |
72 | Magnetic compass required to be serviced and calibration. |
73 | LIFE SAVING EQUIPMENT Life raft required to serviced and refilled, as per LSA plan. I) Life raft to be serviced and refilled. (02 Nos) |
74 | ii)Hazardous duty life jackets to be replaced.( 6 Nos) |
75 | iii)Life buoys SOLAS approved with 30 Mtr life lines to be replaced. (4 Nos) |
76 | Distress signals of the vessel should be replaced.( 01 set ) |
77 | FIRE FIGHTING EQUIPMENT’S: All fire extinguishers required to be replaced as per FFA plan I) 6.5kg CO2 type fire extinguisher to be replaced ( 01 No) |
78 | 6 kg DCP type fire extinguisher to be replaced ( 01 No) |
79 | 9 ltr Foam (Mechanical type) fire extinguisher to be replaced( 04 Nos) |
80 | TANKS ii) Black water tank (sewage tank) should be cleaned properly. |
81 | ii) All tank air vent required to be replaced. |
82 | TOILET i) Toilet system sink motor required servicing. |
83 | i) Shower, Tab and all bath room fitting required to be replaced. |
84 | i) Toilet flushing system required replaced. |
85 | AC & VENTILATIONS i) Air conditioning unit required overhauling and defective item to be replaced. |
86 | ii) Refilling of refrigeration gas |
87 | iii) Operating panel board check and defective items replace. |
88 | iv) AC cooling pump required to be replaced. |
89 | MISCELLANEOUS i)02 Nos DC bunks fans to be replaced with new. |
90 | ii) All defective door rubber packing required to be replaced. |
91 | iii) All door defective locking system required to be replaced. |
92 | iv)Water leakage from wheel house roof and crew cabin wall side required repair. |
93 | v)Manual bilge pump required to be replaced. |
94 | vi) New fuel tank require with stainless steel metal SS-316 grade, 1000 ltr capacity at mid of the boatin place existing two fuel tank to reduce their load and exact requirement. |
95 | vii) Visual/manual fuel pipe measuring system may be installed outside the tank to check the fuel level. The fuel supply line to both main engine and DG set be made complete. |
96 | viii)1 KVA Invertor UPS system required to be provided for emergency lighting/fan and charging etc. purpose. |
97 | PLUMBING WORK i) All plumbing line of toilet to be cleaned & operational. |
98 | ii) Discharge motor be serviced and made operational defective parts be replaced. |
99 | ELECTRIC SIDE Insulation resistance (merger test) and OEM recommended preventive maintenance to be carried out and the following electrical items should be made operational/functional. All electronic components, controls and wiring used on engine and the boats are to be marine version complying with IP 65 rating. i) All electrical cable line laying in cable tray. |
100 | ii) All electrical panel board with line required checking and be in functional condition. |
101 | iii) Complete DC line required to be replaced. |
102 | iv) Cabin and exhaust fans with toilet exhaust fan be checked and servicing and make operational. (Defective parts required to be replaced.) |
103 | v) Multi Bty isolator 24Volt DC, 80 AMP 3in, 2 Out required to be provided. |
104 | PAINTING Under water hull surface cleaning and painting Pen guard HB primer (Epoxy primer) 01 Coat – 100 Micron (DFT) Safe guard universal ES grey tie coat 01 Coat – 100 Miscron (DFT) Sea Quantum pro-u light red- 01 coat – 150 micron (DFT) (Silyl Acrylate Anti-fouling self-polishing paint) Sea quantum pro-u-dark red – 01 coat – 150 micron (DFT) (Silyl Acrylate anti-Fouling self-polishing paint) Metal oxide paint & primer to jet units. Under water portion anti-fouling paint (Safe Guard Universal ES Grey, Pen Guard HB Primer, Sea Quantum Pro-U, Light Red, Sea Quantum Pro-U Dark Red) to be required as per international maritime organization (IMO) scheme. |
105 | All above water painting as vessel requirement i) Above water level complete cleaning surface finishing and lamination wherever required and painting as per vessel painting scheme. |
106 | All vessel outer body required painting ii) Vessel outer body cleaning and complete painting in disruptive pattern as per original painting scheme. |
107 | LMG & MMG fitting and LMG & MMG Protection shilled NIJ – level-III & safety guard of gun mount required re-fitted. |
108 | Bollard and cleat serviced/if defective same to be replaced. |
109 | Charges for Dry docking /Piloting/Inspection & Insurance |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail