Tender For Dry Dock Repair Of Mechanized Boat Krishna
Open Tender
Indian
Gujarat
bhuj
07-02-2024

Tender Details

Dry Dock Repair Of Mechanized Boat Krishna Dry Dock Repair And Mainteannce Of Mechanized Boat Krishna

Key Value

Document Fees
Refer document
EMD
INR 340000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: <1ST DRY DOCK REPAIR AND MAINTENANCE OF MECHANIZED BOAT KRISHNA>
Sl. No. Item Description
1(A )DECK/HULL SIDE All zinc anodes of hull are required to be replaced with new one and Zink anode bolts of both main engine to be replaced.
2Keel protecting plate and protecting plate screw at front portion to be replaced.
301 set sea chest non returning valves required replacement.
4In side passenger cabin and pilot house side wall required lamination and FRP work.
5All FRP body to be checked and required to be repaired as per IRS recommendation.
6i) All around damaged rubber fenders required to be replaced.
7ii) All side portable pneumatic fender to be replaced.
8ANCHORING SYSTEM i) 35 Mtr SS anchor chain 10 mm dia to be provided.
9ii) 20 Kgs grapnel anchor with rope approximate 18 mm x 120 feet.
10iii) Anchor winch and lifting motor required to be replace.
11CABIN Pilot, passenger seat with back rest and hand rest foam & rexineto be replaced.
12WINDOW CURTAIN i) All side window glasses curtain required new fitting with curtain. Curtain holder required to be installed.
13WIPER i) Wiper along with blades and holder to be replaced.
14ii) Wiper water spray system to be checked and defective item to be replaced.
15iii) Wiper motor to be replaced.
16MAIN ENGINE AND ENGINE ROOM :- Main Engine Make and Types- 2 x Cummins, QSB 6.7 4801D1 Ref No QSB6.7 4801NT, Power: 473 HP 3000 RPM. Boththe main engine required complete major overhauling. Other maintenance of main engines and its system to be carried out as per the schedules prescribed by OEM/ Manufacture. Engine Srl No. 74090192 (Stbd) & 74090187 (Port) Engine Model No.-QSB 6.7 INT 473 HP Run Hours (Port) – 3864.15 Hrs,(Stbd)- 3865.35 Hrs . i) Both main engines require ‘D’ check maintenance as per OEM schedule by the authorized service agencies of Cummins Engine
17All sea water line and valve required cleaning by chemical and pressure test. If any found damage/poor condition required to be replaced.
18Both main engine and gear box mounting and vibration pad required to be replaced.
19Both main engines inter cooler and oil cooler required to be replaced with new
20Battery of both main engine-02 x 02 (180 AH)=04 Nos, DG Set-01 no (120AH) and emergency battery-(180 AH)=02 Nos required to be replaced.
21Convertor of 24-volt DC to 13.7-volt 10 AMP required replaced.
22All destructive safety device required to be replaced
23Both Sea water pump required to be replaced.
24Bilge /fire line with valve required servicing/cleaning by chemical and pressure test, if any found damage/poor condition required to be replaced as per IRS recommendation.
25Electrical fire pump/ Bilge pump to be replaced.
26Complete rubber hose pipe required to be replaced.
27Fire hydrant, nozzle required to be serviced and hose required to be replaced.
28Engine alarms check and make functional.
29Engine operational instruments servicing and to be functional.
30Flexible fuel line with clamp required to be replaced.
31Turbocharger to be serviced.
32Fuel pump servicing & calibration and adjustment as per specified fuel pressure for marine engine regulation.
33All injector required to be calibration and pressure testing as per prescribed by OEM/ Manufacture.
34Defective silencer pipes /flanges/mufflers required to be replaced.
35Both main engine Exhaust manifold with clamp required to be replaced & inlet manifold decarburization.
36Heat exchanger tube to be servicing.
37Fresh water pump required serving and defective spare parts/ kit to be replaced.
38Both Self-starter required to be replaced.
39Port side alternator required to be serviced and Stbd side required to be replaced.
40Sea water cooling valve of both main engine required to be replaced.
41All retaining /non-retaining /delivery valves and wheel, bolts with gasket of retaining valve,non-retaining valve/discharge valve required to be replaced.
42Over board discharge valve, sea suction valve to be over hauling and pressure tested
43DG SET i) 8 KVA DG set required to be replaced with new version.
44ii) DG set sea water cooling strainer with line required replaced.
45iii) One ½ inch new mono block pump is required to be provided for use in emergency basis.
46FIRE ALARM Complete fire alarm system to be check and required to be made operational and horn system made with 24 Volt stainless steel small size duel (Marine grade) required.
47Defective wiring, switches, cables and sensors of fire alarm required replaced.
48BLOWERS i)02 Nos engine room fan/ blowers & exhaust motor required to be replaced.
49ii)Blower and exhaust fan base required to be repaired.
50STEERING SYSTEM i) Hydraulic steering system to be serviced.
51ii) All hydraulic pressure pipe required to be replaced and pressure tested .
52GEAR BOX i) Both M/E gear box coupling oil seal required to be replaced.
53ii)Recommended gear oil as per OEM to be replaced.
54iii)Gear oil cooler with sensor to be replaced.
55iv)Hydro force 12 volt of gear box required replaced.
56PROPULSION UNIT i)Both stainless steel Propeller shaft 50mm (diameter) to be replaced.
57ii) Both Rudder to be replaced.
58iii)Rudder shaft with seal required to be replaced.
59iv)Both ‘P’ bracket required re-fitted with proper alignment.
60v) Propeller required to be replaced with proper alignment.
61vi) ‘P’ bracket bush and gallon bush required to be replaced.
62vii) Complete unit alignment with gear box, engine, propeller shaft and propeller.
63GPS system required calibration.
64All navigation lights, deck light/wheel house light & crew cabin light to be made operational and defective items be replaced.
65Defective bulbs, switches wiring to be replaced 24 Volt and 230 Volt.
66I) Deck panel board defective switches and lights required to be replaced.
67Main switch board circuit breakers to be servicing.
68ECHO SOUNDER Echo sounder required to be calibrated by authorized dealer and defective item to be replaced
69SEARCH LIGHTS Search light required to be replaced as new version/LED system.
70Flood lights required replace with (LED).
71Rubber packing of Hatch cover of engine room, wheel house, crew cabin and front deck required to be replaced.
72Magnetic compass required to be serviced and calibration.
73LIFE SAVING EQUIPMENT Life raft required to serviced and refilled, as per LSA plan. I) Life raft to be serviced and refilled. (02 Nos)
74ii)Hazardous duty life jackets to be replaced.( 6 Nos)
75iii)Life buoys SOLAS approved with 30 Mtr life lines to be replaced. (4 Nos)
76Distress signals of the vessel should be replaced.( 01 set )
77FIRE FIGHTING EQUIPMENT’S: All fire extinguishers required to be replaced as per FFA plan I) 6.5kg CO2 type fire extinguisher to be replaced ( 01 No)
786 kg DCP type fire extinguisher to be replaced ( 01 No)
799 ltr Foam (Mechanical type) fire extinguisher to be replaced( 04 Nos)
80TANKS ii) Black water tank (sewage tank) should be cleaned properly.
81ii) All tank air vent required to be replaced.
82TOILET i) Toilet system sink motor required servicing.
83i)    Shower, Tab and all bath room fitting required to be replaced.
84i)    Toilet flushing system required replaced.
85AC & VENTILATIONS i) Air conditioning unit required overhauling and defective item to be replaced.
86ii) Refilling of refrigeration gas
87iii) Operating panel board check and defective items replace.
88iv) AC cooling pump required to be replaced.
89MISCELLANEOUS i)02 Nos DC bunks fans to be replaced with new.
90ii) All defective door rubber packing required to be replaced.
91iii) All door defective locking system required to be replaced.
92iv)Water leakage from wheel house roof and crew cabin wall side required repair.
93v)Manual bilge pump required to be replaced.
94vi) New fuel tank require with stainless steel metal SS-316 grade, 1000 ltr capacity at mid of the boatin place existing two fuel tank to reduce their load and exact requirement.
95vii) Visual/manual fuel pipe measuring system may be installed outside the tank to check the fuel level. The fuel supply line to both main engine and DG set be made complete.
96viii)1 KVA Invertor UPS system required to be provided for emergency lighting/fan and charging etc. purpose.
97PLUMBING WORK i) All plumbing line of toilet to be cleaned & operational.
98ii) Discharge motor be serviced and made operational defective parts be replaced.
99ELECTRIC SIDE Insulation resistance (merger test) and OEM recommended preventive maintenance to be carried out and the following electrical items should be made operational/functional. All electronic components, controls and wiring used on engine and the boats are to be marine version complying with IP 65 rating. i) All electrical cable line laying in cable tray.
100ii) All electrical panel board with line required checking and be in functional condition.
101iii) Complete DC line required to be replaced.
102iv) Cabin and exhaust fans with toilet exhaust fan be checked and servicing and make operational. (Defective parts required to be replaced.)
103v) Multi Bty isolator 24Volt DC, 80 AMP 3in, 2 Out required to be provided.
104PAINTING Under water hull surface cleaning and painting Pen guard HB primer (Epoxy primer) 01 Coat – 100 Micron (DFT) Safe guard universal ES grey tie coat 01 Coat – 100 Miscron (DFT) Sea Quantum pro-u light red- 01 coat – 150 micron (DFT) (Silyl Acrylate Anti-fouling self-polishing paint) Sea quantum pro-u-dark red – 01 coat – 150 micron (DFT) (Silyl Acrylate anti-Fouling self-polishing paint) Metal oxide paint & primer to jet units. Under water portion anti-fouling paint (Safe Guard Universal ES Grey, Pen Guard HB Primer, Sea Quantum Pro-U, Light Red, Sea Quantum Pro-U Dark Red) to be required as per international maritime organization (IMO) scheme.
105All above water painting as vessel requirement i) Above water level complete cleaning surface finishing and lamination wherever required and painting as per vessel painting scheme.
106All vessel outer body required painting ii) Vessel outer body cleaning and complete painting in disruptive pattern as per original painting scheme.
107LMG & MMG fitting and LMG & MMG Protection shilled NIJ – level-III & safety guard of gun mount required re-fitted.
108Bollard and cleat serviced/if defective same to be replaced.
109Charges for Dry docking /Piloting/Inspection & Insurance
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail