}

Tender For Consultancy Services For Preparation Of Detailed Project Report For Intermittent Two Lane Plus Paved Shoulder Stretches To Four Lane In Between Design Km 148+589 (Existing Km 235+070) (Vailoo) To Design Km 176+532 (Existing Km (263+070) Donipaw, anantnag-Jammu And Kashmir

National Highways and Infrastructure Development Corporation Limited-NHIDCL has published Tender For Consultancy Services For Preparation Of Detailed Project Report For Intermittent Two Lane Plus Paved Shoulder Stretches To Four Lane In Between Design Km 148+589 (Existing Km 235+070) (Vailoo) To Design Km 176+532 (Existing Km (263+070) Donipaw. Submission Date for this Tender is 05-03-2024. Road Cargo Transport Tenders in anantnag Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

41467073
Corrigendum : Tender For Consultancy Services For Preparation Of Detailed Project Report For Intermittent Two Lane Plus Paved Shoulder Stretches To Four Lane In Between Design Km 148+589 (Existing Km 235+070) (Vailoo) To Design Km 176+532 (Existing Km (263+070) Donipaw
Global Tenders
Indian
Jammu And Kashmir
anantnag
05-03-2024

Tender Details

Consultancy Services For Preparation Of Detailed Project Report For Intermittent Two Lane Plus Paved Shoulder Stretches To Four Lane In Between Design Km 148+589 ( Existing Km 235+070 ) ( Vailoo ) To Design Km 176+532 ( Existing Km ( 263+070 ) Donipawa Of 8.643 Km Length On Khellani-Khanabal Section Of Nh-244 In The Ut Of Jammu And Kashmir. ; 1 Schedule A ( Fixed Lumpsum Cost ) 2 Remuneration For Local Staff ( Including Per Diem Allowance ) 3 A. Key Professionals 4 Team Leader Cum Senior Highway Engineer ( 1 No ) 5 Senior Bridge Engineer ( 1 No ) 6 Highway Cum Pavement Engineer ( 1 No ) 7 Traffic And Safety Expert ( 1 No ) 8 B. Other Professionals 9 Material Cum Geotechnical Engineer - Geologist ( 1 No ) 10 Senior Survey Engineer ( 1 No ) 11 Environmental Specialist ( 1 No ) 12 Quantity Surveyor / Documentation Expert ( 1 No ) 13 Land Acquisition Expert ( 1 No ) 14 Utility Expert ( 1 No ) 15 Sub-Professional Staff: ( To Be Assessed By Consultant As Per Requirement Of Assignment And One Sub-Professional Be A Fresh Graduate, Minimum 7 To Be Deployed ) 16 Tbn 17 Tbn 18 Tbn 19 Tbn 20 Tbn 21 Tbn 22 Tbn 23 Support Staff ( Fixed Rates ) 24 Office Manager ( 1 No. ) 25 Typist ( 1 No. ) 26 Office Boy ( 1 No. ) 27 Night Watchman ( 1 No. ) 28 Transportation ( Fixed Costs ) 29 The Vehicles Hired By The Consultants Shall Include The Cost For Rental, Drivers, Operation, Maintenance, Repairs, Insurance, Etc. For Use Of Consultants ( 2 Vehicle For 6 Months Each ) 30 Duty Travel To Site ( Fixed Costs ) 31 All Trips 32 Office Rent ( Fixed Costs ) 33 The Rent Cost Includes Operation & Maintenance, Cleaning, Repairs, Etc For Entire Duration Of Services. 34 Office Supplies, Utilities And Communication ( Fixed Costs ) 35 Office Supplies, Drafting Supplies, Computor Running Costs, Domestic And International Communication 36 Office Furniture And Equipment ( Fixed Costs ) 37 Office Furniture And Equipment 38 Reports And Document ( Fixed Costs ) 39 Monthly Report ( 3 Sets ) 40 Inception Report & Qap 41 Environment And Social Impact Screening Report 42 Draft Feasibility Report 43 Final Feasibility Report 44 Strip Plan With L.A. Reports 45 Draft La And Clearances I Report 46 Final La And Clearances I Report 47 Draft Environmental Assessment Report & Rap 48 Final Environmental Assessment Report & Rap 49 Draft Detailed Design Report & Drawings Etc. 50 Draft Emp 51 Draft Bidding Documents 52 Final Detailed Project Report With Bill Of Quantities, Cost Estimates, Updated Drawings Etc. 53 Final Emp 54 Final Bidding Documents 55 Draft 3 ( A ) , 3 ( A ) And 3 ( D ) Notification For Land Acquisition ( 3 Copies Each ) 56 La & Clearances Ii Report 57 Survey And Investigation 58 A.Topographical Survey ( Fixed Rate ) 59 Complete Topographic Survey Using Mobile / Aerial Lidar Or Equivalent / Better Technology For Project Approach Area Including Hire Charges For Equipment And Supply Of Survey Teams Comprising Of Project Survey Filed Staff Etc. Inclusive Of Cost Of Materials, Labourer, Preparation Of Drawings And Their Submission As Per Contract Provision. 60 B. Investigation ( Fixed Cost ) 61 All Investigations / Surveys Including Road And Bridge Inventory, Fwd Test And Pavement Evaluation, Roughness Survey, Axle Load Survey, Material Survey And Investigation, Sub-Grade Investigation, Traffic Survey, Socio-Economic & Census Survey / Studies, Land Acquisition Studies, Etc. 62 Schedule B ( Item Rate Costs ) 63 Sub-Soil Investigation & Other Works 64 Sub-Soil Investigation 65 A ) Boring In All Type Of Soils ( Other Than Hard Rock ) 66 B ) Boringinhard Rock 67 Network Survey And Gpr 68 Net Work Survey Of The Existing Highways As A Repository For Civil Work As Per Directions From Authority. 69 Gpr Survey For Detection Of Under Ground Utilities 70 Cost Of Supply And Fixing Boundary Pillars 71 Procuring And Fixing Boundary Pillars And Its Installation, Complete In All Respect As Per Irc:25, 1967: Wherever The Proposed Alignment Follows The Existing Alignment, The Boundary Pillars Shall Be Fixed At An Interval Of 200M On Either Side Of Proposed Right Of Way. Wherever There Is A Proposal Of Realignment Of The Existing Highway And / Or Construction Of New Bypasses, Consultant Shall Fix Boundary Pillars Along The Proposed Alignment On The Extreme Boundary On Either Side Of The Project Highway At 50 M Interval. 72 Land Acquisition Team Including Support Staff And Logistics / Transportation 73 A. Land Acquisition Team Including Support Staff 74 Ex-Land Revenue Inspector / Officer Or Equivalent ( 1 No ) 75 Ex-Kanoongo / Girdawar Or Equivalent ( 1 No ) 76 Ex-Patwari Or Equivalent ( 1 No ) 77 Typist ( 2 Nos ) 78 Peon ( 1 No ) 79 B. Logistics For Land Acquisition Team 80 Computer Including Necessary Peripherals ( 2 Nos ) 81 Printers ( 2 Nos ) 82 Vehicles ( Bolero Or Equivalent ) Withmonthly Running Limit Of 4000 Km ( 1 No ) 83 Grand Total ( Schedule A+B )

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 19-Feb-2024 Amendment No. 1 Date 05-03-2024

Key Value

Document Fees
INR 5900 /-
EMD
INR 200000.0 /-
Tender Value
Refer document

BOQ Items

Name of the Project: Consultancy Services for Preparation of Detailed Project Report for intermittent Two Lane plus Paved Shoulder stretches to Four Lane in between Design Km 148+589 (Existing Km 235+070) (Vailoo) to Design Km 176+532 (Existing Km (263+070) Donipawa of 8.643 Km Length on Khellani-Khanabal Section of NH-244 in the UT of Jammu and Kashmir.
Sl. No. Item Description
1Schedule A (Fixed Lumpsum Cost)
2Remuneration for Local Staff (including per diem allowance)
3A. KEY PROFESSIONALS
4Team Leader Cum Senior Highway Engineer (1 no)
5Senior Bridge Engineer (1 no)
6Highway cum Pavement Engineer(1 no)
7Traffic and Safety expert (1 no)
8B. OTHER PROFESSIONALS
9Material cum Geotechnical Engineer - Geologist (1 no)
10Senior Survey Engineer (1 no)
11Environmental Specialist (1 no)
12Quantity Surveyor / Documentation Expert (1 no)
13Land Acquisition Expert (1 no)
14Utility Expert (1 no)
15Sub-Professional Staff: (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate, Minimum 7 to be deployed)
16TBN
17TBN
18TBN
19TBN
20TBN
21TBN
22TBN
23Support Staff (Fixed Rates)
24Office Manager (1 No.)
25Typist (1 No.)
26Office Boy (1 No.)
27Night Watchman (1 No.)
28Transportation (Fixed costs)
29The vehicles hired by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for use of consultants (2 Vehicle for 6 months each)
30Duty Travel to Site (Fixed Costs)
31All Trips
32Office Rent (Fixed Costs)
33The rent cost includes operation & maintenance, cleaning, repairs, etc for entire duration of services.
34Office Supplies, Utilities and Communication (Fixed Costs)
35Office Supplies, Drafting Supplies, Computor Running Costs, Domestic and International Communication
36Office Furniture and Equipment (Fixed costs)
37Office Furniture and Equipment
38Reports and Document (Fixed costs)
39Monthly Report (3 sets)
40Inception Report & QAP
41Environment and Social Impact Screening Report
42Draft Feasibility Report
43Final Feasibility Report
44Strip Plan with L.A. Reports
45Draft LA and Clearances I Report
46Final LA and Clearances I Report
47Draft Environmental Assessment report & RAP
48Final Environmental Assessment report & RAP
49Draft Detailed Design Report & Drawings etc.
50Draft EMP
51Draft Bidding Documents
52Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
53Final EMP
54Final Bidding Documents
55Draft 3(a) ,3(A) and 3(D) notification for land acquisition( 3 copies each)
56LA & Clearances II Report
57Survey and Investigation
58A.Topographical Survey (Fixed Rate)
59Complete Topographic Survey using mobile/ aerial LiDAR or equivalent/better technology for project approach area including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer, preparation of Drawings and their submission as per contract provision.
60B. Investigation (Fixed cost)
61All investigations/surveys including Road and Bridge Inventory,FWD Test and Pavement Evaluation,Roughness Survey,Axle Load Survey,Material Survey and Investigation, Sub-grade Investigation, Traffic Survey, Socio-economic & Census Survey/Studies,Land Acquisition Studies, etc.
62Schedule B (Item rate costs)
63Sub-soil Investigation & Other Works
64Sub-Soil Investigation
65a)Boring in all type of soils (other than hard rock)
66b) Boringinhard rock
67Network Survey and GPR
68Net work Survey of the existing Highways as a repository for civil work as per directions from Authority.
69GPR Survey for detection of under ground utilities
70Cost of supply and fixing Boundary Pillars
71Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval.
72Land Acquisition Team including support staff and logistics/transportation
73A. Land acquisition Team including support staff
74Ex-Land Revenue Inspector/Officer or equivalent (1 no)
75Ex-Kanoongo/ Girdawar or equivalent (1 no)
76Ex-Patwari or equivalent (1 no)
77Typist (2 nos)
78Peon (1 no)
79B. Logistics for Land acquisition Team
80Computer including necessary peripherals (2 nos)
81Printers (2 nos)
82Vehicles (Bolero or equivalent) with monthly running limit of 4000 km (1 no)
83Grand Total (Schedule A+B)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail