Supplying Of Construction Materials For The Work Of Nrlm Shed In Moodidoddikoppa Grama Panchayat, Soraba Taluk - Add Sundries Charges At 1 Percent On Material/,Add Watering Charges At 1 Percent On Material/,Mixer (Concrete) - 1 Cum Capacity/,Portland Cement/,Coarse Sand (Zone Iii)/,Broken Stone Aggregate 12 Mm To 10 Mm Size/,Broken Stone Aggregate 20 Mm Size/,Broken Stone Aggregate 40 Mm Size/,Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3 Percent On Cost Of Paint/,Add Hom Of Welding And Grinding Machine At 4 Percent On Material/,Welder Grade I/,Fitter Class I/,Ms Flat/,M.S Rods/,Binding Wire/,Tmt Bars Fe 500/,Formwork, Centering & Scaffolding For Chejjas, Canopy & Other Architectural Projections Of Minor Sections - 45 Percent/,Solid Concrete Block (40X15x20 Cms)- 5.00 N/Sqmm/,Add Sundries Charges At 2 Percent On Material/,Add Handling , Loading And Unloading At 1Percent On Material/,Stone Chistler Class Ii/,Mason Class Ii (With Tools)/,Mason Class I (With Tools)/,Latrite/,Formwork, Centering & Scaffolding For Columns & Piers - 10 Percent/,Formwork, Centering & Scaffolding For Roof (Straight & Arched) - 20 Percent,Formwork, Centering & Scaffolding For Beams & Lintels Of Building - 20 Percent/,Hom Of Vibrator 0.71 Days/,Plasticizer / Super Plasticizer/,Add Watering Charges At 1 Percent On Labour/,Add Sundries Charges At 1Percent On Labour/,Mixer (Concrete Small Used In Culvert)/,Transportation/Loading And Unloading Of Material/Lifting Of Material /Wastage/Unforeseen Charges/Miscellaneous Which Are Necessary During Execution/,White Cement Based Putty At 2Sqm / Kg At Rs. 1050 Per Kgs/,Stone Dresser (With Tools)/,Machine Polished Granite Stone Slabs 20 Mm/,Adhesive For Joints/,High Bond Tile Adhesive For Vitrified Tiles/,Vitrified Tiles 600X600 Mm/,Formwork, Centering & Scaffolding For Plastering & Painting Of Ceiling - 25Percent/,Mathi/Nandi Wood Scantling/,Add Hom Of Welding And Grinding Machine At 2 Percent On Material/,Fabricator/,Add 15Percent Wastage For Glass/,Chrominum Plated Screws/,Cleat Angles/,Alluminium Handles - 15 Mm/,Alluminium Tower Bolt - 20 Cm/,Nylon Rollers/,Aluminium Window Frame Section 1.20 Mm Thick/,Soild Partical Board Flush Doors 30 Mm Thick/,Hom Of Machinaries For Planing/,Add Cutting And Other Wastage 5Percent,Mathi/Nandi Wood Planks For Panels 25 Mm Thick/,Add Brush At 1 Percent On Cost Of Paint/,Add Handling , Loading And Unloading At 2Percent On Material/,Add Providing And Removing Scaffolding At 3 Percent On Labour/,Painter Class I/,Aqua Nylon Mesh/,Handling Loading And Unloading 3 Percent On Material/,Labour Charges For Lifting And Placing In Position And Making Connection At 7 Percent On Material/,Granite Sink 23Cm Thick/,Licenced Plumber With Tools/,Lead Or Pvc Connection Pipe 32Mm Dia (For Wash Basin)/,Brass Stop Cock/,Cp Brass Waste 32 Mm Of Standard Pattern/,Cp Brass Chain With Plug/,Copper Plated Brass Piller Tap 15Mm/,White Vitreous China Clay Flat Back Wash Basin Size 550X400mm/,Black Plastic Seat With Lid As Specified/,White Glazed/Viterous China Clay 10Lts Low Lwvwl Flushingcistern, With Fittings And Brackets And 40 Mm White C.P. Flush Pipe/,European Type Water Classet Of Specific Make/,Add White Lead Paint, Gasket, Cement, Sand For Making Good The Wall And Floor At 2 Percent On Material/,Mosquito Proof Coupling 25Mm/,Special For Overflow Pipe/,M.S. Holder Bat Clamp 32Mm/,G.I. 32Mm Dia Telescopic Flush Pipes With Fittings Specials/,C.I. / M.S. Brackets For Flushing Cistern/,P.V.C. Flushing Cistern 10 Lts Low Level With Fitting/,Orissa Pattern Of Size 580X440mm With Integral Type Foot Rests/,Unit Cost As Per The Specification/,Formwork, Centering & Scaffolding For Plastering & Painting Of New Walls - 25 Percent/,Add Brush, Putty, Sand Paper, Roller At 5 Percent On Cost Of Paint/,Charcoal/,Polyenthylene Water Storage Tank Of Specified Capacity L/,C.I. / M.S. Brackets For Flushing Cistern///,G.I. Overflow Pipe 20Mm Dia/,S Or P Trap 100Mm/,Enamel Paint/,Plastic Emulsion Paint/,Thick Plain Glass 5.50 Mm/,Pvc Beading/,Rubber Beading For Shutters Beading/,Enamel Metal Paint/,Ready Mix Primer Paint (Ready Mix Red Lead Paint)/,Casurina Poles 100 - 150 Mm/,Boulders/,Bond Stone 20 X 20 X 45 Cm/,Gst/,Eletrification/,Add Over Head Charges 10 Percent/,Pvc Pipe Of 10Kg/Cum,90 Mm/,Rcc Cap 1000 Mm Dia, 100 Mm Thick/,Labour Charges For Handing Errection Of Rcc Rings Etc. At 5 Percent/,Transportation Charges Of Materials Beyond 5 Km At 10 Percent/,Fabrication Charges/,Cost Of 6.5Mm M.S. Coil/,Size Stone 20 X 20 X 25 Cms/