| 2 | Survey, Soil investigation, Design and Construction of a)Sump well of capacity 6850KL b) construction of clear water pump house c) Installation of clear water pumps for pumping water up to all OHT”s The work shall include construction of substation with 200KVA transformers,completed) Providing, laying, jointing, testing and commissioning of clear water gravity main having length 300 m of dia700 mm and of DI K-7.pipe from taping point to junction of existing 350mm Dia pipe and3700 m of dia600 mm and of DI K-7.pipe fromjunction of existing pipe to proposed sump well near existing WTP.including River and,nalla crossing, excavationrefilling,Highway/ road cutting/dismantling, restoration, providing valves and specials and fittings all complete.e)Providing, laying, jointing, testing, commissioningof clear water pumping main having length of 4889. m of dia100 to 350 mm and of DI K-7.pipe from Sump .to all OHT”s.including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials and fittings all complete.f)Providing, laying, jointing, testing, commissioningof clear water pumping main having length of 4889. m of dia100 to 350 mm and of DI K-7.pipe from Sump .to all OHT”s.including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials and fittings all complete.g) Construction of overhead reservoirs having capacities of 1000KL &820 KL and staging height of 16.mat ......h) Providing, laying, jointing, testing, commissioning of distribution network having length of 13450 mof .HDPE pipe from90 mmdia . to 250mm dia including excavation, refilling, road cutting/dismantling, restoration, providing valves, specials and fittings all complete.i)Providing house service connections j)Control Instrumentation andPLC- SCADA based automation system for sump pumps feeremains and OHT’s for monitoring and controlling of water supply system |