}

Tender For Ttps Operation Circle Mpm Ii Acp Stage I, Ii Iii Cleaning Of Filters, Cooling Coils, Condensers, Cooling Towers And Greasing Of Bearings In Ac Plants And Periodical Overhauling Of Pumps, Equipments From 01.04.2024 To 31.03.2025, Tuticorin-Tamil Nadu

Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Tender For Ttps Operation Circle Mpm Ii Acp Stage I, Ii Iii Cleaning Of Filters, Cooling Coils, Condensers, Cooling Towers And Greasing Of Bearings In Ac Plants And Periodical Overhauling Of Pumps, Equipments From 01.04.2024 To 31.03.2025. Submission Date for this Tender is 18-01-2024. Mechanical engineering Service Tenders in Tuticorin Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

41445448
Tender For Ttps Operation Circle Mpm Ii Acp Stage I, Ii Iii Cleaning Of Filters, Cooling Coils, Condensers, Cooling Towers And Greasing Of Bearings In Ac Plants And Periodical Overhauling Of Pumps, Equipments From 01.04.2024 To 31.03.2025
Open Tender
Indian
Tamil Nadu
Tuticorin
18-01-2024

Tender Details

Ttps Operation Circle Mpm Ii Acp Stage I, Ii Iii Cleaning Of Filters, Cooling Coils, Condensers, Cooling Towers And Greasing Of Bearings In Ac Plants And Periodical Overhauling Of Pumps, Equipments From 01.04.2024 To 31.03.2025

Key Value

Document Fees
Refer document
EMD
INR 7600.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: TTPS – Operation Circle - MPM II – ACP – Stage I, II & III – Cleaning of filters, cooling coils, condensers, cooling towers and greasing of bearings in AC Plants and periodical overhauling of pumps, equipments from 01.04.2024 to 31.03.2025
Sl. No. Item Description
1Filter cleaning work: Charges for Filter cleaning work in stage I & II - Removing the filters from the frames of AHUs/Package units - Cleaning the filters with air and water - Re-fixing the filters in the filter frames - If necessary, replacing the damaged filters with new/reconditioned filters.
2Filter cleaning work: Charges for filter cleaning work in Stage III - Removing the filters from the frames of AHUs/Package Units - Cleaning the filters with air and water - Re-fixing the filters in the filter frames -If necessary, replacing of the damaged filters with new/reconditioned filters.
3Cooling coil cleaning work: Charges for cleaning the cooling coil of the AHUs/Package Units, in stage I & IIby Soap water washing.
4Cooling coil cleaning work: Charges for cleaning the cooling coil of AHUs in Stage III, by Soap water washing
5Condenser Cleaning Work: Charges for cleaning the condensers of AC plants and Package units in Stage I, II & III. Dismantling the end covers at both sides of condenser - Providing dummy plates in pipes for arresting water leak - Admitting water & air into the tubes and cleaning the inner surfaces of tubes using brush - removing dummy plates and re-fixing the end covers by providing the rubber gaskets.[Materials - Contractor scope].
6Material Cost: ( Contractor’s Scope) Rubber Gasket 5 mm thick for pumps.
7V" - Belt and Bearing Related Work: Charges for checking the performance of the bearings and Alignment of "V" Beltsin AHUs and Package units - If necessary, Replacing the bearings and "V" belts.
8Grease Application Work: Charges for greasing the bearings in AHUs and package Units.
9Compressor Oil related work: Charges for compressor oil related work in the AC plant - Draining oil from oil chamber of compressor - Removing oil chamber cover - Cleaning/renewing the suction and discharge oil filters - Cleaning the oil lines - Fixing the oil chamber cover - Topping up of oil - Leak testing and commissioning.
10Cooling Tower Cleaning Work: Charges for complete cleaning of cooling towers. Draining the water - Removing the choking particles like slurry, mud, scales of rust etc in tank - Scrubbing and removing the algae growth in Louvers and surroundings -Admitting fresh water.
11Pump overhauling Work: Charges for overhauling Chiller/CW pumps at Unit III, Conference Hall, DCS I,DCS II, ServiceBuilding and switch yard I with motor capacity of 3.7 KW to7.5 KW. Decoupling the pump from motor - Dismantling the pump parts - Cleaning the internal parts, replacing the damaged parts, bearings etc. if necessary - Re-assembling and checking - Coupling with motor and commissioning.
12Pump overhauling Work: Charges for overhauling Chiller/CW pumps at Unit IV & V CW and chiller pump and Unit I &II CW pumps with motor capacity of 15 KW. Decoupling the pump from motor - Dismantling the pump parts - Cleaning the internal parts, replacing the damaged parts, bearings etc. if necessary - Re-assembling and checking - Coupling with motor and commissioning.
13Material Cost: (Contractor’s Scope) Gland rope of various sizes.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail