Tender For Re-Organisation Of Ld System To Improve The Low Voltage Problem In Village Bhatoli (Soldha) By Providing New 3-Ph Lt Line From Existing 11/0.4Kv 63Kva Dtr Trilokpur In Es Kotla Uesd Kotla (Ts No, 46/2023-24)
Tender Overview
Project Description
Tender For Re-Organisation Of Ld System To Improve The Low Voltage Problem In Village Bhatoli ( Soldha ) By Providing New 3-Ph Lt Line From Existing 11 / 0.4Kv 63Kva Dtr Trilokpur In Es Kotla Uesd Kotla ( Ts No, 46 / 2023-24 )
BOQ
| Sl. No. | Item Description |
| 1 | TS No. 46/2023-24 |
| 2 | Prov. AAAC (7/3.15 50mm²) { Neutral conductor including 1% (Sag, Jumpering and wastage} (Prov. By HPSEBL) |
| 3 | Prov. Steel Tubular Poles (8 m, Working Load > 180 kgf/m²) (Prov. By HPSEBL) |
| 4 | Prov. RCC Muffs |
| 5 | Prov. C.I. X-Arm (600x75x40) i/c Clamp |
| 6 | Prov. Stay set L.T. i/c Egg & Clamp). (Prov. By HPSEBL) |
| 7 | Prov. Stay Wire (7/3.15 m) (6.0 kg Per Stay Set) (Prov. By HPSEBL) |
| 8 | Prov. Earthing set Complete (Prov. By HPSEBL) |
| 9 | Prov, Full Clamp (Prov. By HPSEBL) |
| 10 | Prov. GI Wire (Prov. By HPSEBL) |
| 11 | Prov. D.I. iron (Prov. By HPSEBL) |
| 12 | Prov. Shackle Insulator. (Prov. By HPSEBL) |
| 13 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)] |
| 14 | Prov. Aluminium Paint |
| 15 | Prov. Spiral PVC Spacers(Prov. By HPSEBL) |
| 16 | Erection of ST pole 8 Mtr. long , digging of pit, errection of X-Arm, Shackle insulator, filling of pit , painting of pole & ramming with concerete filling of RCC Muff |
| 17 | Erection of L.T. stay set i.e. digging of pit, fixing of stay road, noseling & titening. |
| 18 | Erection of L.T. earthing set i.e. digging of pit, Fixing of GI Wire To The Earthing System, Filling Of Pit. |
| 19 | Sagging of Conductor i.e. laying, stringing and sagging & binding with insulator (Single wire per KM). |
| 20 | Sagging of GI WIre i.e. laying, stringing and sagging & binding with insulator (Single wire per KM). |
| 21 | Mannual carriage of material 1 KM HT line considering average distance from road to site of work (0.100 Km) |
| 22 | Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart.Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.