Tender For Supply Of Equipment/Material, Design, Erection, Testing & Commissioning For Sop Tonagar Panchayat Jawali For Dumping Site At Jawali By Providing 11/0.4Kv 25Kva Sub Station A/W Ht And Lt Linein Electrical Section Jawali Uesd Jawali (Ts No. 133/2, jawali-Himachal Pradesh

Himachal Pradesh State Electricity Board-HPSEB has published Tender For Supply Of Equipment/Material, Design, Erection, Testing & Commissioning For Sop Tonagar Panchayat Jawali For Dumping Site At Jawali By Providing 11/0.4Kv 25Kva Sub Station A/W Ht And Lt Linein Electrical Section Jawali Uesd Jawali (Ts No. 133/2. Submission Date for this Tender is 16-01-2024. Electrification Work Tenders in jawali Himachal Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

41424756
Tender For Supply Of Equipment/Material, Design, Erection, Testing & Commissioning For Sop Tonagar Panchayat Jawali For Dumping Site At Jawali By Providing 11/0.4Kv 25Kva Sub Station A/W Ht And Lt Linein Electrical Section Jawali Uesd Jawali (Ts No. 133/2
Open Tender
Indian
Himachal Pradesh
jawali
16-01-2024

Tender Details

Tender For Supply Of Equipment / Material, Design, Erection, Testing & Commissioning For Sop Tonagar Panchayat Jawali For Dumping Site At Jawali By Providing 11 / 0.4Kv 25Kva Sub Station A / W Ht And Lt Linein Electrical Section Jawali Uesd Jawali ( Ts No. 133 / 2023-24 ) -11 Kv Ht Line 2 Prov. Acsr ( 6 / 1 / 3.35, 50 Mm² ) { Neutral Conductor Including 1% ( Sag, Jumpering And Wastage } 3 Prov. Steel Tubular Poles ( 9 M, Working Load > 200 Kgf / M² ) 4 Prov. Muffs With Concerete Filling 5 X-Arm: [ Channel Iron ( 75X40x6 Mm ) , Length : ( 2800 Mm X 4 Nos ] For Supporting Do Fuse Unit & Go Switch 6 Go Switch Handle Supporting: [ Channel Iron ( 75X40x5 Mm ) , Length : 460 Mm 7 Cross Arm: [ Channel Iron ( 100X50x6 Mm ) , Length: 1270 Mm I / C Tolerance Of 100 Mm Either Side ) 8 Angle Iron ( 50X50x6 Mm ) , Length: 750 Mm X 2 No. X 8 Structures 9 Pole Top Bracket [ Msci:100X50x6 Mm- 100 Mm ] 10 Prov. & Fabrication Of Belt Set - Ms Angle Iron: 50X50x6, Length :1800 Mm & X-Bracing Set - Ms Angle Iron: 50X50x6, Length: 2125 Mm Fordoub. Pole Str. I / C Clamp ( 2 No. Per Set ) 11 Prov. X-Arm ( Horizontal ) - Ms Channel Iron: 100X50x6, Length: 2340 Mm X 2 No. ] ? Formation 12 Prov. Pin Insulator With Gi Pin 13 Prov. Disc Insulator Set Cleave & Tounge Halicaly Formed Fitting 14 Prov. Go Ab Switch Unit ( 11Kv, 400A, ) O / D Type ( Prov. By Hpsebl ) 15 Prov. D.O Fuse Unit 16 Prov.Stay Set Complete Ht I / C Egg 17 Prov. Stay Wire ( 7 / 3.15 Mm ) ( 7.0 Kg Per Stay Set ) ( Prov. By Hpsebl ) 18 Prov. Ht Earthing Set Complete 19 Prov. Gi Wire 8 Swg. ( Prov. By Hpsebl ) 20 Prov. Half Clamps: [ On Double Pole Dead End Structure: 4 No; On Run Thro Structure: 2 No ] 21 Prov. Full Clamps: [ On Double Pole Dead End Structure: 4 No, Single Pole Run Thro Structure: 2 No ] 22 Prov. Danger Plate ( 250X200x1.6 Mm ) ( Prov. By Hpsebl ) 23 Prov. Nuts And Bolts Of Various Sizes ( Galvanised / Coated ) [ Preferably 16 Mm F Or More ( With Flat And Spring Washers ) ] 24 Prov. Barbed Wire 25 Prov. Aluminium Paint 26 Erection Of 9 Mtr. St Pole Single Structure I.E. Digging Of Pit, Fixing Of Insulator, X-Arms, K.B. Set, Top Clamp, Barbed Wire, Danger Plate, Drilling Of Holes And Filling Of Pit + Rammingcomplete In All Respect. 27 Erection Of 9 Mtr. St Pole Double Structure I.E. Digging Of Pit, Fixing Of Insulator, X-Arms, K.B. Set, Top Clamp, Barbed Wire, Danger Plate, Drilling Of Holes And Filling Of Pit + Rammingcomplete In All Respect. 28 Erection Of Stay Set Ht I.E. Digging Of Pit, Fixing Of Stay Road, Filling Of Pit, Nozzeling & Tightning. 29 Erection Of Ht Earthing Set Complete 30 Erection Of G.O. Switch 400 Amp. Comp. 31 Fixing Of Jumper 32 Sagging Of Conductor I.E. Laying, Stringing And Sagging & Binding With Insulator ( Single Wire Per Km ) . 33 Sagging Of Gi Wire I.E. Laying, Stringing And Sagging & Binding ( Single Wire Per Km ) . 34 Mannual Carriage Of Material 1 Km Ht Line Considering Average Distance From Road To Site Of Work ( 0.100 Km ) 35 25 Kva Trsanformer 36 Prov. Distribution Transformer ( Ordinary ) , 11 / 0.4 Kv, 25 Kva 37 Prov. Steel Tubular Poles ( 9 M, Working Load > 200 Kgf / M² ) 38 Prov. Muffs With Concerete Filling 39 Prov. X-Arm: [ Channel Iron ( 100X50x6 Mm ) , Length : 2800 Mm X 2 Nos ] For Incomer Line 40 Prov. Ms Angle Iron ( 50X50x6 Mm ) , Length: ( 2800 Mm ) X1 Nos For LaS 41 Prov. X-Arm: [ Channel Iron ( 75X40x6 Mm ) , Length : ( 2800 Mm X 4 Nos ] For Supporting Do Fuse Unit & Go Switch 42 Prov. Transformer Bed, Belting & Knee Bracing 43 Prov. X-Arm: [ Channel Iron ( 100X50x6 Mm ) , Length : 2800 Mm X 2 Nos ] For Transformer Bed 44 Prov. X-Arm [ Channel Iron ( 100X50x6 Mm ) , Length : ( 460Mm ) X 2 Nos For Supporting Main Channel Of Transformer ] 45 Prov. Ms Angle Iron ( 50X50x6 Mm ) , Length : ( 2800 Mm ) X 2 Nos 46 Prov. Ms Angle Iron ( 35X35x5 Mm ) , Length : ( 460 ) X 2 Nos 47 Prov. Ms Angle Iron ( 50X50x6 Mm ) , Length : ( 950 Mm ) X 2 Nos For Bed Knee Bracing 48 Prov. Transformer Lt Distribution Box And Go Switch Fixing Assembly 49 Prov. Ms Angle Iron ( 50X50x6 Mm ) , Length : ( 2800 Mm ) X 2 Nos 50 Prov. Ms Angle Iron ( 50X50x6 Mm ) , Length : ( 450 Mm ) X 1 Nos 51 Prov. Go Switch Handle Supporting: [ Channel Iron ( 75X40x6 Mm ) , Length : 460 Mm 52 Prov. Go Ab Switch Unit ( 11Kv, 400A, 25 Ka ) Tripple Pole O / D Type ( Prov. By Hpsebl ) 53 Prov. D.O Fuse Unit 54 Prov. Lighting Arrester, 9 Kv Station Class ( Porcelain Type ) 55 Prov. Discs Insulator Sets ( Comprising 1 No. Disc: ^^ ( Porcelain, Bs, 12 Kv, 90 Kn ) Including Dead End Clamps Etc. ) 56 Prov. Stay Set Complete 57 Prov. Stay Wire ( 7 / 3.15 Mm ) ( 6.0 Kg Per Stay Set ) ( Prov. By Hpsebl ) 58 Prov. Pipe Earthing Set 59 Prov. Lt Distribution Panel Box Withmccb 40 Amp 3P 35Ka , Ics =100 % Icu, Kit-Kit 200 Amp For 25 Kva Dtr ( Prov. By Hpsebl ) 60 Prov. Half Clamp ( M.S. Flat 50X6 Mm ) 61 Prov. Full Clamps ( M.S. Flat 50X6 Mm ) 62 Prov. Nuts And Bolts Of Various Sizes ( Galvanised / Coated ) [ Preferably 16 Mm F Or More ( With Flat And Spring Washers ) ] 63 Prov. Aluminium Thimble ( Prov. By Hpsebl ) 64 Prov. Aluminium Thimble ( Prov. By Hpsebl ) 65 Prov. Danger Plate ( Prov. By Hpsebl ) 66 Prov. Barbed Wire 67 Prov. Lt Cable ( 3.5 Core ) 95 Mm² 68 Prov. Energy Meter 3-?, 4 Wire Ct Operated Static Tri-Vector Meter With Box ( Ct-100-200 / 5A ) ( Prov. By Hpsebl ) 69 Prov. Aluminum Paint. 70 Prov. Prov. 6 / 1 / 3.35, 50Mm² 71 Prov. Transformer Structure Chain Link Fencing , Angle Iron , Gate Etc & Protection Plinth ( Civil Work As Per Hpsr ) . 72 Erection Of 100 Kva S / Stn. I.E. Digging Of Pit For Pole & Earthing Two No. Poles & 3 Nos. For Earthdrilling Of Holes In X-Arms, Preparation Of Plateform Str. Members C.I., A.L. I.E. X-Arms & K.B. Set, Errection Of D / P, Concreating Of Rcc Muff Errection Of Plateform, Errection Of X-Arms, D.O., L.A., Mccb, Switch Lt Box, Energy Meter, Errection Of Transformer, Earthing Connection To G.O. Switch, Transformer L.A. Etc., Errection Of Stay Set, Jumper, Pipe Earthing 3 Nos Set, L.T. Cable, Barbed Wire And Painting Complete In All Respect. 73 Prov. Transportation Charges & Mannual Carriage Of 25 Kva Pole Mounted Distribution S / Stn. 74 3-Ph Lt Line 75 Prov. Aaac ( 7 / 3.15 50Mm² ) { Neutral Conductor Including 1% ( Sag, Jumpering And Wastage } 76 Prov. Steel Tubular Poles ( 8 M, Working Load > 180 Kgf / M² ) 77 Prov. Rcc Muffs 78 Prov. C.I. X-Arm ( 600X75x40 ) I / C Clamp 79 Prov. Stay Set L.T. I / C Egg & Clamp ) . 80 Prov. Stay Wire ( 7 / 3.15 M ) ( 6.0 Kg Per Stay Set ) ( Prov. By Hpsebl ) 81 Prov, Full Clamp 82 Prov. Gi Wire ( Prov. By Hpsebl ) 83 Prov. D.I. Iron 84 Prov. Shackle Insulator. 85 Prov. Nuts And Bolts Of Various Sizes ( Galvanised / Coated ) [ Preferably 16 Mm F Or More ( With Flat And Spring Washers ) ] 86 Prov. Aluminium Paint 87 Prov. Spiral Pvc Spacers ( Prov. By Hpsebl ) 88 Erection Of St Pole 8 Mtr. Long , Digging Of Pit, Errection Of X-Arm, Shackle Insulator, Filling Of Pit , Painting Of Pole & Ramming With Concerete Filling Of Rcc Muff 89 Erection Of L.T. Stay Set I.E. Digging Of Pit, Fixing Of Stay Road, Noseling & Titening. 90 Sagging Of Conductor I.E. Laying, Stringing And Sagging & Binding With Insulator ( Single Wire Per Km ) . 91 Sagging Of Gi Wire I.E. Laying, Stringing And Sagging & Binding With Insulator ( Single Wire Per Km ) . 92 Mannual Carriage Of Material 1 Km Ht Line Considering Average Distance From Road To Site Of Work ( 0.060 Km ) 93 Office Chair For Esd Jawali And Ed Jawali Office 94 Quantities Are Mentioned Above Are Tentative And Actual Quantity Shall Be Worked Out After Check Survey To Be Carried Out By The Successful Tender And Detailed Engineering And Finalization Of Tower Location Chart.Payment Shall Be Made As Per Approved Bill Of Material / Actual Quantities Measured At Site.

Key Value

Document Fees
INR 590 /-
EMD
INR 8910.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Tender for Supply of equipment/material, design, erection, testing & commissioning for SOP toNagar Panchayat Jawali for Dumping Site at Jawali by providing 11/0.4KV 25KVA Sub Station a/w HT and LT Linein Electrical Section Jawali UESD Jawali (TS No. 133/2023-24)
Sl. No. Item Description
111 KV HT Line
2Prov. ACSR (6/1/3.35, 50 mm²) { Neutral conductor including 1% (Sag, Jumpering and wastage}
3Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²)
4Prov. Muffs with concerete filling
5X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
6GO Switch Handle Supporting: [Channel Iron (75x40x5 mm), Length : 460 mm
7Cross Arm: [Channel Iron (100x50x6 mm), Length: 1270 mm i/c tolerance of 100 mm either side)
8Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x 8 structures
9Pole Top Bracket [MSCI:100x50x6 mm- 100 mm]
10Prov. & fabrication of Belt Set - MS Angle Iron: 50x50x6, Length :1800 mm & X-Bracing Set - MS Angle Iron: 50x50x6, Length: 2125 mm forDoub. Pole Str. i/c clamp (2 No. per set)
11Prov. X-Arm (Horizontal) - MS Channel Iron: 100X50x6, Length: 2340 mm x 2 No.] ? Formation
12Prov. Pin Insulator with GI Pin
13Prov. Disc Insulator Set cleave & Tounge halicaly formed fitting
14Prov. GO AB Switch Unit (11kV, 400A,)O/D type (Prov. By HPSEBL)
15Prov. D.O Fuse Unit
16Prov.Stay set complete HT i/c Egg
17Prov. Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) (Prov. By HPSEBL)
18Prov. HT Earthing set complete
19Prov. GI Wire 8 SWG. (Prov. By HPSEBL)
20Prov. Half clamps: [On Double Pole Dead End structure: 4 No; On Run Thro" structure: 2 No ]
21Prov. Full clamps: [On Double Pole Dead End structure: 4 No, Single Pole Run Thro" structure: 2 No]
22Prov. Danger Plate (250X200X1.6 mm) (Prov. By HPSEBL)
23Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)]
24Prov. Barbed Wire
25Prov. Aluminium Paint
26Erection of 9 Mtr. ST pole Single structure i.e. digging of pit, fixing of insulator, x-arms,K.B. set, Top clamp, barbed wire, danger plate, drilling of holes and filling of pit + rammingcomplete in all respect.
27Erection of 9 Mtr. ST pole double structure i.e. digging of pit, fixing of insulator, x-arms,K.B. set, Top clamp, barbed wire, danger plate, drilling of holes and filling of pit + rammingcomplete in all respect.
28Erection of Stay set HT i.e. digging of pit, fixing of stay road, filling of pit, nozzeling & tightning.
29Erection of HT Earthing set complete
30Erection of G.O. switch 400 Amp. Comp.
31Fixing of jumper
32Sagging of conductor i.e. laying, stringing and sagging & binding with insulator (Single wire per KM).
33Sagging of GI Wire i.e. laying, stringing and sagging & binding(Single wire per KM).
34Mannual carriage of material 1 KM HT line considering average distance from road to site of work (0.100 Km)
3525 KVA Trsanformer
36Prov. Distribution Transformer (Ordinary), 11/0.4 kV,25 KVA
37Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²)
38Prov. Muffs with concerete filling
39Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line
40Prov. MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA"s
41Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
42Prov. Transformer Bed, Belting & Knee Bracing
43Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed
44Prov. X-Arm [Channel Iron (100x50x6 mm), Length : (460mm) x 2 Nos for supporting Main Channel of Transformer]
45Prov. MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
46Prov. MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos
47Prov. MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing
48Prov. Transformer LT Distribution Box and GO Switch fixing Assembly
49Prov. MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
50Prov. MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos
51Prov. GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm
52Prov. GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type (Prov. By HPSEBL)
53Prov. D.O Fuse Unit
54Prov. Lighting Arrester, 9 kV Station Class(Porcelain Type)
55Prov. Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)
56Prov. Stay set complete
57Prov. Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set) (Prov. By HPSEBL)
58Prov. Pipe Earthing Set
59Prov. LT Distribution Panel Box WithMCCB 40 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200 Amp for 25 KVA DTR (Prov. By HPSEBL)
60Prov. Half Clamp (M.S. Flat 50X6 mm)
61Prov. Full Clamps (M.S. Flat 50X6 mm)
62Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)]
63Prov. Aluminium Thimble (Prov. By HPSEBL)
64Prov. Aluminium Thimble (Prov. By HPSEBL)
65Prov. Danger Plate (Prov. By HPSEBL)
66Prov. Barbed Wire
67Prov. LT Cable (3.5 Core) 95 mm²
68Prov. Energy Meter 3-?, 4 wire CT operated Static Tri-Vector meter with Box(CT-100-200/5A) (Prov. By HPSEBL)
69Prov. Aluminum Paint.
70Prov. Prov. 6/1/3.35, 50mm²
71Prov. Transformer structure Chain Link fencing , Angle Iron ,Gate etc & Protection plinth (Civil Work as per HPSR) .
72Erection of 100 KVA S/Stn. i.e. digging of pit for pole & earthing two No. poles & 3 Nos. for earthdrilling of holes in X-arms, preparation of plateform str. Members C.I., A.L. i.e. X-arms & K.B. set, errection of D/P, concreating of RCC muff errection of plateform, errection of X-arms, D.O., L.A., MCCB, Switch LT box, energy meter, errection of transformer, earthing connection to G.O. switch, Transformer L.A. etc., errection of stay set, jumper, pipe earthing 3 Nos set, L.T. cable, barbed wire and painting complete in all respect.
73Prov. Transportation charges & Mannual carriage of 25 KVA pole mounted distribution S/Stn.
743-Ph LT Line
75Prov. AAAC (7/3.15 50mm²) { Neutral conductor including 1% (Sag, Jumpering and wastage}
76Prov. Steel Tubular Poles (8 m, Working Load > 180 kgf/m²)
77Prov. RCC Muffs
78Prov. C.I. X-Arm (600x75x40) i/c Clamp
79Prov. Stay set L.T. i/c Egg & Clamp).
80Prov. Stay Wire (7/3.15 m) (6.0 kg Per Stay Set) (Prov. By HPSEBL)
81Prov, Full Clamp
82Prov. GI Wire (Prov. By HPSEBL)
83Prov. D.I. iron
84Prov. Shackle Insulator.
85Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)]
86Prov. Aluminium Paint
87Prov. Spiral PVC Spacers(Prov. By HPSEBL)
88Erection of ST pole 8 Mtr. long , digging of pit, errection of X-Arm, Shackle insulator, filling of pit , painting of pole & ramming with concerete filling of RCC Muff
89Erection of L.T. stay set i.e. digging of pit, fixing of stay road, noseling & titening.
90Sagging of Conductor i.e. laying, stringing and sagging & binding with insulator (Single wire per KM).
91Sagging of GI WIre i.e. laying, stringing and sagging & binding with insulator (Single wire per KM).
92Mannual carriage of material 1 KM HT line considering average distance from road to site of work (0.060 Km)
93Office Chair for ESD Jawali and ED Jawali office
94Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart. Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail