Tender For Construction Of Boundary Wall Length 64.33 M At Tool Room And Training Centre R K Nagar Agartala Tripura 2023 24 Part D, West Tripura-Tripura

Tripura Industrial Development Corporation Limited-TIDCL has published Tender For Construction Of Boundary Wall Length 64.33 M At Tool Room And Training Centre R K Nagar Agartala Tripura 2023 24 Part D. Submission Date for this Tender is 11-01-2024. Wall Construction Tenders in West Tripura Tripura. Bidders can get complete Tender details and download the document.




Tender Notice

41390748
Tender For Construction Of Boundary Wall Length 64.33 M At Tool Room And Training Centre R K Nagar Agartala Tripura 2023 24 Part D
Open Tender
Indian
Tripura
West Tripura
11-01-2024

Tender Details

Construction Of Boundary Wall Length 64.33 M At Tool Room And Training Centre R K Nagar Agartala Tripura 2023 24 Part D

Key Value

Document Fees
INR 10000 /-
EMD
INR 16167.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Construction of Boundary Wallat Training Centre R.K Nagar, Agartala, Tripura During the year 2023-24 - Part D(total length-64.33 m)
Sl. No. Item Description
1Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.All kinds of soil
3Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete.
4Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level: 1:4:8 ( 1 Cement: 4 fine sand : 8 graded stone aggregate 40 mm nominal size)
5Centering shuttering including struttings, propping etc. and removal of form work for:
6Foundations, footings, bases for columns etc. for mass concrete with timber plank
7Lintels, beams, plinth beams, girders, bressumers and cantilevers with wooden plank
8Columns, Pillars, Piers, Abutments, Posts and Struts with wooden plank
9Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement -All work upto plinth level
101:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size)
11Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement.
121:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size)
13Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement
141:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size)
15Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete uptoplinth level.
16Thermo-Mechanically Treated bars of grade Fe-500D or more
17First class brick work in foundation and plinth including cost of all materials as required complete:
18In cement mortar 1:4 ( 1 cement : 4 fine sand )
19First class brick work in superstructure above plinth level & upto floor-five level including cost of all materials as required complete:
20In cement mortar 1:5 ( 1 cement : 5 fine sand )
21Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete:In cement mortar 1:4 ( 1 cement : 4 fine sand )
2212 mm cement plaster of mix.Cement mortar 1:4 (1 cement : 4 fine sand)
2315 mm cement plaster on the rough side of single or half brick wall of mix: Cement mortar 1:4 (1 cement : 4 fine sand)
24Finishing walls with acrylic smooth exterior paint of required shade of approved brand and manufacture [Payment shall be made after submission of Test Certificate issued by the Manufacturer] :New work ( two or more coats applied @ 1.67 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
25Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. complete as required: In grating, frames, guard bar, railing, brackets, gates and similar works, all complete Grill wall
26Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6mm angle iron and 3mm M.S. gusset plates at the junctions and corners, & with cleats with bolts & nuts, rivets, locking arrangement, handles, hooks & eyes, pinlets including embedding in cement concrete of required grade for fixing in position, all necessary fittings, including applying a priming coat of approved steel primer etc. complete as required:Using M.S. angels 40x40x6 mm for diagonal braces Gate
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail