}

Corrigendum Design, Supply, Installation, Commissioning, Testing Of 3 X 18 Mw / 22 Mwh Grid Connected Battery Energy Storage System (Bess), Energy Management System (Ems) And Associated Work To Setup Bess Along With Integrated Comprehensive Technical Supp-Multi State

Adani Group-AG has published Corrigendum Design, Supply, Installation, Commissioning, Testing Of 3 X 18 Mw / 22 Mwh Grid Connected Battery Energy Storage System (Bess), Energy Management System (Ems) And Associated Work To Setup Bess Along With Integrated Comprehensive Technical Supp. Submission Date for this Tender is 20-01-2024. Energy Management System Tenders in Multi State. Bidders can get complete Tender details and download the document.




Tender Notice

41388100
Corrigendum Design, Supply, Installation, Commissioning, Testing Of 3 X 18 Mw / 22 Mwh Grid Connected Battery Energy Storage System (Bess), Energy Management System (Ems) And Associated Work To Setup Bess Along With Integrated Comprehensive Technical Supp
Open Tender
Indian
Multi State
20-01-2024

Tender Details

Corrigendum Design, Supply, Installation, Commissioning, Testing Of 3 X 18 Mw / 22 Mwh Grid Connected Battery Energy Storage System (Bess), Energy Management System (Ems) And Associated Work To Setup Bess Along With Integrated Comprehensive Technical Support For 12 Years

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail