Border Roads Organisation-BRO has published Tender For Engaging Technical Consult For Preparation Of (Fs) And (Dpr) On Epc Mode For Const Of Road Tapa-Hush-Dille Gg (New Alignment) From Km 0.00 To Km 58.00 (Net Length 58.00Kms) Green Field Alignt To Nhsl Specifications In 85 Rcc Under 756Tf Of. Submission Date for this Tender is 27-01-2024. Road Work Tenders in Naharlagun Arunachal Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 20-Jan-2024 | Ammentment No.01 | Date | 27-01-2024 |
Sl. No. | Item Description |
1 | Remuneration for Local Staff |
2 | Team Leader cum Senior Highway Engineer |
3 | Senior Bridge Engineer |
4 | Highway cum Pavement Engineer |
5 | Material cum Geotechnical Engineer cum Geologist |
6 | Senior Survey Engineer |
7 | Traffic and Safety Expert |
8 | Enviroment Specialist |
9 | Quantity Surveyor / Documentation expert |
10 | Sub Professional Staff (To be assessed by consultant as per requirement of assignment) |
11 | Position |
12 | Position |
13 | Position |
14 | Position |
15 | Position |
16 | Position |
17 | Position |
18 | Support StaffNote : To be assessed by consultant as per requirement of assignment) |
19 | Office Manager |
20 | Typist |
21 | Office Boy |
22 | Night Watchman |
23 | Transportation (Fixed Cost) |
24 | The Vehicle provided by the consultant shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etcA. For use of Consultants |
25 | Duty travel to Site (Fixed Cost) |
26 | Trips |
27 | Office Supplies, Utilities and Communication (Fixed Costs) |
28 | Office Supplies Drafting |
29 | Supplies Computer |
30 | Running Costs |
31 | Domestic and International Communication |
32 | Office Furniture and Equipment (Rental) |
33 | Office Furniture and Equipment |
34 | Reports and Document Printing |
35 | Monthly Reports (3 Copies per month) |
36 | Inception Report & QAP |
37 | Environment and Social Impact Screening Report |
38 | Draft Feasibility Report |
39 | Final Feasibility Report |
40 | Strip Plan with L.A. Reports |
41 | Draft LA and Clearances I Report |
42 | Final LA and Clearances I Report |
43 | Draft Enviroment Assessment report & RAP |
44 | Final Enviroment Assessment report & RAP |
45 | Draft Detailed Design Report & Drawings etc. |
46 | Draft EMP |
47 | Draft Bidding Document |
48 | Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. Final EMP |
49 | Final EMP |
50 | Final Bidding Documents |
51 | Draft 3(a), 3(A) and 3(D) notification for land acquisition (03 copies each) |
52 | LA & Clearances II Report |
53 | Survey and Investigation |
54 | A. Tropographical Survey (Fixed Cost) |
55 | Tropographical Survey including hire charges for eqipment and supply of survey team comprising of project survey field staff etc. inclusive of cost of materials, labourer |
56 | Detailed topograhic surveys using mobile/aerial LiDAR or equivalent technology |
57 | B. Investigation (Fixed Cost) |
58 | Road and Bridge Inventory |
59 | BBD Test and Pavement Evaluation |
60 | Roughness Survey |
61 | Axle Load Survey |
62 | Material Survey and Investigation |
63 | Sub-grade Investigation |
64 | Traffic Survey |
65 | Socio-economic & Census Survey/Studies |
66 | Land Acquisition Studies |
67 | Any other Investigation/Surveys |
68 | Sub-soil Investigation |
69 | Boring in all type of soils (Other than hard rock) |
70 | Boring in hard rock |
71 | Estimate of Cost for Expatriate Consultants ( Name and Position to be filled in below columns by the bidder)Renumeratrion of Expatriate Satff including per diem allowance |
72 | Position |
73 | Position |
74 | Position |
75 | Position |
76 | Position |
77 | Position |
78 | Mobilization and Demobilization - International Airfares (Fixed Cost) (To be filled by the bidder in below columns) |
79 | Position |
80 | Position |
81 | Position |
82 | Position |
83 | Position |
84 | Position |
85 | Mobilization and Demobilization -Inland Travel in Home Country (Fixed Costs) |
86 | Other Miscellaneous expenses (Like DA, Internal travel expenses other than incidentals) (Fixed Cost) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy