Purchase Of Air Conditioning For The Conference Hall , Variable Refrigerant Flow System , Outdoor Units , 8 Hpvrf Odu - 3 Phase , Indoor Units , Supply Ofwall Mounted Units Of2.0 Tr Capacity With Controls , Supply Ofductable Units Of6.4 Tr Capacity, With Controls , Supply Ofrefrigerant Piping Jointsunits For The Indoor Units , Installation Of Vrf Units , Installation, Testing And Commissioning (Sitc) Ofvrf Outdoor Unit Of 08 Hp Capacity With Controls , Installation, Testing And Commissioning (Sitc) Ofwall Mounted Indoor Units Ofwithcontroller , Installation, Testing And Commissioning (Sitc) Ofducted Indoor Units Ofwithcontroller , Refrigerant And Drain Piping System , Supply,Installation,Testing And Commissioning Of Hard Drawn Soft Refrigerant Piping With Refnet Joints. The Brazing To Be Carried Out With Bleeding Of Nitrogen. The Copper Pipe To Be Insulated With 19 Mm Thick/13 Mm Thick Nitrile Rubber Sleeves Or Sheet , Control/ Communication Wiringusing Sheided Cables Between Indoor And Outdoor Units With Copper Wires In Pvc Conduits For All The Above Units , Sitc Of Hard Pvc Drain Piping. Drain Pipingwith Necessary Clamps, Supports, Hangers, And Fitings Such As Bend, Reducers, Tees, Reducers, Etc. With Sufficient Insulation: Complete In All Respects.( 9Mm Thick Insulation) , Dia 25Mm , Additional Gas Charging R410 , Air Distribution System , 24 Gauge , Duct Insulation & Lining , Supply, Installation &Testing Of Acoustic Insulation Of Ducts Using Open Cell Nitrile Rubber , Supply, Installation &Testing Of Thermal Insulation Of Ducts Using Closed Cell Nitrile Rubber , Supply, Installation, Testingof Air Terminal Devices , Extruded Aluminium Powder Coated Supply/ Return Grills , Canvas Connection , Other Charges If Any , Amc Charges If Applicable