Tender For Rate Contract For Servicing And Maintenance Of Firefighting Equipments At Nrpl Karnal, karnal-Haryana

Indian Oil Corporation Limited-IOCL has published Tender For Rate Contract For Servicing And Maintenance Of Firefighting Equipments At Nrpl Karnal. Submission Date for this Tender is 09-01-2024. Hand Glove Tenders in karnal Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

41302773
Tender For Rate Contract For Servicing And Maintenance Of Firefighting Equipments At Nrpl Karnal
Open Tender
Indian
Haryana
karnal
09-01-2024

Tender Details

Rate Contract For Servicing And Maintenance Of Firefighting Equipments At Nrpl Karnal-Ffes Maintenance At Karnal 2 Checking, Inspection, Servicing And Maintenance Of Fire Fighting System, Equipment, Hydrants, Extinguishers Of All Type , Water / Foammonitor As Per Oisd / Isi Standards To Providebest Functioning Of The Equipments Always Inbest Healthy Condition Inclusive Of Per Iodically Cleaning , Checking / Inspection / Oiling / Greasing Of Assembliessuch As Coupling, Nozzles , Valves, Hydrants, Extinguishers, H Ose Pipes , Water / Foam Monitors, Nozzles Foam Monitor, Hose Boxes , Sand Buckets Etc, Updation Ofthe Data & Identificationtags , R Ecording The Status Of Checking In History Register Etc. As Directed By The Engineers In Chargewith All Labors , Tools And Tackles And Materials Etc. Complete ( Inspection And Servicing Of The Equipment / Fire Fightingfacilitiesis To Be Doneperiodically As Men Tionedagainst Each ) :- 3 Maintenance And Inspection Of Double Headed Hydrants As Per Direction Of Eic. Reporting To Be Done As Per Owner Supplied Format Incl Uding Oiling , Greasing , Testing As Per Direction Of Eic Inclusive Of All Tools & Tackles, Consumable, Transportation, Labour Char Ges Etc 4 Maintenance And Inspection Of Fire Extinguishers Of All Types & Capacity As Per Direction Of Eic. Reporting To Be Done As Per Owner Supplied Format Including Cleaning, Filling Of Dcp Powder, Replacement Of Co2 Cartridge / Washer / Cap / Discharge Pipe / Squeezing Grip Etc . If Required As Per Direction Of Eic Inclusive Of All Tools & Tackles, Consumable, Transportation, Labour Charges Etc 5 Maintenance And Inspection Of Fire Hose As Perdirection Of Eic. Reporting To Be Done As Per Owner Supplied Format Including Cleaning , Replacement Of Washer / Spring / Lock Etc. If Required As Per Direction Of Eic Inclusive Of All Tools & Tackles, Consumable, Transport Ation, Labour Charges Etc 6 Maintenance And Inspection Of Hose Box As Perdirection Of Eic. Reporting To Be Done As Per Owner Supplied Format Including Cleaning, Replacement Of Front Glass / Key Box Glass / Key / Rubber Gasket Etc. If Required As Per Direction Of Eic Inclusive Of All Tools & Tackle S, Consumable, Transportation, Labour Charges Etc 7 Maintenance Of All Kind Of Isolation Valves Of All Sizes In Fire Water Line, Hydrants, Monitors, Tank Sprinkler Line And Tank Foam L Ine By Opening The Same, Lapping, Greasing, Oil As Required For The Job With Supply Of All Man, Material, Greases Required For The W Ork. 8 Maintenance And Inspection Of Foam / Water Monitors By Cleaning, Greasing, Oiling, Operating In 360 Deg. For Any Kind Of Blockage / Da Mage As Per Direction Of Eic Inclusive Of All Tools & Tackles, Consumable, Transportation, Labour Charges Etc. 9 Maintenance And Inspection Of Nozzles All Types Including Foam Branch 10 Maintenance Of Sand Buckets With Supply Of Sand For All Bucket. 11 Maintenance Of Foam Trolley & All Foam Tank 200 / 1000 Ltr. Capacity 12 Ppe Maintenance / Up Keep On Monthly Basis Like As Helmets., Breathing Apparatus -, Water Jel Blanket, Resuscitation Set, Fire Proxim Ity Suite-Goggles, Belts, Stretcher And Other Ppes As Per Instruction Of Engineer-In-Charge . 13 Cleaning & Stacking Properly The Afff Foam Containers, Updating Stock, Date Of Expiry, Date Of Manufacturing On Board And In Register, P Lacing Foam Containers At The Foam Monitors And Water Hydrants. 14 Cleaning / De-Chocking Of Nozzles Of Water Spray System At Mlpu Shed, Piping Area, Hook Up Point Area, Substation Area And Water Curt Ain System At Control Roombuilding, Ht Transformer By Opening Nozzle, Dechocking & Refitting The Same As Per Direction Of Site Eng Ineer / Eic Complete In All Respect Including Labour , Tools Tackles , Consumable Etc 15 Taking The Hose Pipe For Hydrotesting, Hydrotest And Keeping It Back In Position After Drying / Rolling Etc. As Per Direction Of Siteengineer / Eic Complete In All Respect Including Labour , Tools Tackles , Consumable Etc. 16 Taking Delivery And Refilling The Extinguishers Of Various Sizes / Capabilities With Dry Or Abc Chemical Powder, Co2 Gas, Clean Agen T / Oxygen / Air, Foam Compound Etc Updating The Data& Identification Tags, Recording The Status Of Checking In History Register Etc A S Per Isi Standard And Replacing The Same As Directed By Engineer-In-Charge ( The Rates Are Inclusive Of All Taxes ) . ( The Co2 / N2 Ga S / Clean Agent / Oxygen / Air Cylinder May To Be Taken Out And Delivered Back Within 10 Days After Re-Filling / Repairing.However Fire Extinguishers Co2 And N2 Are To Be Supplied / Kept Temporary In Place Of Each Fire Extinguisher For Which Taking Out For Re-Filling / Repairing Is Required ) . 17 Supply And Replenishment Of Dry Chemical Powder As Per Relevant Is Code 18 Refilling Of Co2 Gas In Cartridge For Using In Dcp Extinguisher Including All Labour, Transportation Etc. Complete As Per Specificati On And Direction Of Eic / Site Engineer ( Co2 Cartridge Of 200 Gms ) 19 Refilling Of High Pressure Co2 Extinguisher ( Capacity 2.0 Kg ) Through Cce Approved Party And Charging Upto Required Pressure Includi Ng Taking Delivery Of The Cylinder From The Station And Returning The Same Inclusive Of Alllabour Material, Transportation And All. 20 Refilling Of High Pressure Co2 Extinguisher ( Capacity 4.5 Kg ) Through Cce Approved Party And Harging Upto Required Pressure Includin G Taking Deliveryof The Cylinder From The Station And Returning The Same Inclusive Of Alllabour Material, Transportation And All 21 Refilling Of High Pressure Co2 Extinguisher ( Capacity 6.8 Kg / 9.0 Kg ) Through Cce Approvedparty And Charging Upto Required Pressure I Ncluding Taking Deliveryof The Cylinder From The Station And Returning The Same Inclusive Of Alllabour Material, Transportation And All. 22 Refilling Of Clean Agent Fire Extinguisher Of Capacity2kg / 4Kg / 6Kg By Hexafluoropropane ( ( Hfc 227Ea ) Note: Cylinder Refilling Proce Ss Report Must Be Certified / Inspected By An Iocl Nominated Tpi Agency. This Rates Includes Packing And Transportation Charges ( To &Fro ) . Packing Of Cylinders With All Required Accessories For Refilling From Iocl Installation And Packing Of Refilled Cylinders Fro M Filling Station Are To Be Done In Such Way That Cylinders Must Not Be Damaged Or Integrity Of Cylinders Must Not Be Weakened Whiletransporting Between Both Locations. To And From Charges Or Freight Charges Are For Transporation Of Cylinders & Other Required Acc Essories Between Ioclinstallation And Filling Station. 23 Oxygen Filling In Cylinders Of Resuciator Apparatus / Emergency Escape Set 24 Refilling Of Breathing Apparatus Set Cylinder With Dry Compressed Air Up To A Pressure Of 200 / 300 Bar As Per Direction Of Eic, Inclus Ive Of Transportation Handling Charges, Hydrotestingcomplete In All Respect 25 Hydraulic Testing Of Co2 Cylinders Of Sizes 2.0 Kg / 4.5 Kg / 6.8Kg / Breathing Apparatusfrom Cce Approved Party And Charging Upto Requi Red Pressure Including Taking Delivery Of The Cylinder From The Station And Returning The Same Inclusive Of All Labour Material, Tra Nsportation And All As Per Relevant Standards. 26 Hydraulic Testing Of Dcp Cylinders 10 Kg From Cce Approved Party And Charging Upto Required Pressure Including Taking Deliveryof Thecylinder From The Station And Returning The Same Inclusive Of Alllabour Material, Transportation And All As Per Relevant Standards. 27 Hydraulic Testing Of Clean Agent Cylinders ( 2 To 4.5 Kg / Cm2 ) From Cce Approved Party And Charging Upto Required Pressure Including Taking Deliveryof The Cylinder From The Station And Returning The Same Inclusive Of Alllabour Material, Transportation And All As Per Relevant Standards. 28 Refilling & Hydraulictesting Of Dcp Cylinders ( 25 / 45 / 50 / 75 Kg ) From Cce Approved Party And Charging Upto Required Pressure Inc Luding Taking Deliveryof The Cylinder From The Station And Returning The Same Inclusive Of Alllabour Material, Transportation And Al L As Per Relevant Standards. 29 Hydrostatic Testing, Inspection Of Safety Valve, Changing Of Rupture Disc And Refilling Of High Pressure Cylinder Through Cce Approv Ed Party And Charging Upto Required Pressure Including Taking Delivery Of The Cylinder From The Station And Returning The Same Inclu Sive Of All Labour Material, Transportation And All The Other Incidental Expenses ) The Cylinder Is To Be Returned Back To The Stationwithin 15Days From The Date Of Receiving From The Station. ( For 45 Kg Co2 Cyl. ) 30 Supply And Replacing The Spares / Assembles Etc Of The Firefightingequipments System For All Sizes / Capacities Asperisi Stand Ardand Approved Make With All Labours , Materials, , Tools And Tackles Carriages , With All Taxes Duties Etc .Complete 31 Supply And Fixing Pvc Discharge Pipes For 10 Kg Dcp Extinguishers 32 Supply And Fixing Cast Iron Wheel For Hydrants 33 Supply And Fixing Hydrants Seat Washer / Rubber Including Fitting At Site 34 Supply And Fixing Hydrants Coupling Washer 35 Supply And Fixing Pvc Lockfor Extinguishers 36 Supply & Fitting Of Hdpe Discharge Horn For 2.0 / 4.5 / 6.8Kg Capacity Co2 Extinguishers With Fittingsas Per Direction Of Eic. 37 Supply And Fitting Of Co2 Extinguisher Safety Pin Assembly 38 Supply & Fitting Of Discharge Pipe With Horn For All Type Of Co2 Exitinguisher 2.0-4.5Kg 39 Supply & Fitting Of Dcp Extinguisher Cap Washer For 10 Kg Dcp Extinguisher As Per Direction Of Eic. 40 Supply And Replacement Dcp Maincap ( Gun Metal ) 41 Supply And Replacement Squeezing Grip ( Plastic ) 42 Supply And Replacement Of Fire Box Glass ( Front ) 43 Supply And Replacementof Key Box Glass 44 Supply And Fixinghydrant Blind Cap With Chain ( Rubber ) 45 Supply & Fixing Rubber Tube Of Pick Up Tube Of Fb5x With Strainer 46 Supply And Replacement Of Safety Valves 155 Kgf / Cm2 For Co2 Cylinder Bank / 75 Kg Dcp Tank / Air Vessel. 47 Supply And Replacement Dcp Plunger Pin With Spring 48 Supply And Replacement Dcp Plunger Top 49 Supply & Replacemnt ( S&R ) Of 200 Gm Co2 Cartridges. S&R Of New Co2 Cartridges For Using In Dcp Extinguishers Including All Labour, T Ransportation Etc.. Complete As Per Specification And Direction Of Eic / Site-Engineer. ( Co2 Cartridge Of 200 Gms ) 50 Supply & Fitting Of Metal Clamps For Hanging 2Kg / 4.5Kgco2 Extinguisher On Wall Including Labour Charges, Tools Tackles & Consuma Bles Complete In All Respect As Per Direction Of Eic / Se. 51 Supply & Fixingof Hose Box Key 52 Supply& Fixing OfF Keymadefrom8 Mm Size Ms Rods Withpriming / Painting 53 Supply& Fixing Of F Keymadefrom 12 Mm Size Msrods With Priming / Painting 54 Supply& Fixing Of F Keymadefrom 16 Mm Size Msrods With Priming / Painting 55 Supply& Fixing Sandbuckets With Covers 56 Supply& Fixing Winds Socks Only 57 Supply& Fixing Of Smallhammers With Chains For Hoseboxes. 58 Painting Works: Supply And Painting With Two Coats Synthetic Enamel Paint ( Asian Paint ) Fire Paint Including Scrapping Cleaning , One C Oat Of Red Oxide Paint If Required Etc As Per Isi Standards And Approved Make With All Labors , Materials, Carriages, All Taxes Etc Includingletter Writingidentification Marketc Complete: 59 Spray / Brush Painting Of Fire Boxes Includingstand With 2 Coats Luminous Yellow Paint 60 Spray / Brush Painting And Marking Of Fire Bucket Stand With Four Buckets, Canopy Etc Including Nomenclature / Stickers 61 Spray Painting And Marking Of Fire Extinguisher Of All Sizes Including Nomenclature / Stickers. 62 Spray / Brush Painting Of Foam / Water Monitors / Double Hydrant Valves Along With Its Stand Post Including Letter / Number Writing. 63 Spray / Brush Painting Of Fire Siren Including Letter / Number Writing. 64 Removing Old Damaged Wire Mesh In Cold Flare Unit Outlet And Replacing With New One As Directed By Eic Including Tools Tackles All C Omplete. 65 Writing Of Slogans ( In Hindi, English ) At All Heights With Approved Paints And Shade As Per The Direction Of Eic, Date Changing On Walls, Numbering On Hydrant Valve , Post, Direction Marking Etcas Perinstructions Alongwith All Tools, Tackles, Material Etc. Th E Rate Covers Back Ground Painting ( Application Of 1 Coat Primer And 2 Coat Paint On The Board / Wall Before Writing ) 66 Supplying, Fabricating And Fixing M.S Structure Steel Work Made Of Joints, Tubes, Pipes, Channels, Angles, Plates, Flats, Bars Etc F Or Struts, Chain Link Fencing As Per Drawing Including Gate, Ladders, Safety Grills, Walkways, Collapsible Gate, Signboards, Support S For Cable Trench, Making Slots For Barbed Line, Wire Hoisting, Placing In Position, Embedding In Concrete, Applying Two Coat Of Ep Oxy Paint #Epilux 155 High Build Enamel Over A Coat Of Epilux 610 Primer Of M / S Berger Or Any Other Approved Equivalent Make As Per Manufacturer#S Recommendation, Complete In All Respect Including Cutting To Required Size Welding Of Joints, Fixing Anchor, Plates, Bolts, Threading, Nuts, Washers, Sleeves Etc And Necessary Lettering Of Approved Pattern On Main Gate, Signboards Etc. Complete In A Ll Respects Inclusive Of Cost Of All Labour, Materials, Tools, Tackles Etc. As Per Drawings, Specification And Direction Of Site Eng Ineer. ( Excluding The Cost Of Concrete Work ) 67 Supply And Installation Of Display Board Including Acp Sheet / Sun Board, Digital Eco-Solvent Venyl Printing With Lamination And Past Ing With All Tool, Tackle Material As Per Direction Of Eic / Se. 68 Printing Of Flex Banner As Per Direction Of Eic 69 Supply And Pasting Of Radium Sticker Of Required Size As Per Direction Of Eic / Se 70 Painting Any Shade As Directed With Best Quality Synthetic Enamel Of Asian, Berger Or Other Equivalent Approved Make And Brand On St Eel / Timber / Plastic / Metal Including Smoothening The Surface By Sand Papering Etc Complete With All Labour And Materials Complete In A Ll Respects As Directed. Two Or More Coats On Old Work Over An Under Coat Of Suitable Shade With Ordinary Paint Of Approved Brand An D Manufacture. 71 Installation Of Flanged / Rtj Valves / Level Troll / Fire Hydrant / Monitors / Safety Valves Etc. Transportation Of All Types Of Flanged / Rtj Valves, Level Troll, Fire Hydrant, Monitor, Gaskets, Nut Bolts Etc. Either From OwnerSstorage Point To Workshop And / Or Worksite. Installation At Ground Level I.E. Up To A Height Of 5 Meters On Sleepers, Pipe Racks Et C. Or Up To 5 Meters Depth In Trenches Including Assembly Of Valve Accessories, Cleaning Of Flanged Faces, Lapping Of Rtj Rings, Pro Viding New Gasket ( Iocl Supplied ) Or Cutting Of New Gaskets To Proper Size If Required, Placing The Gaskets / Rtj Ring Properly, Ins Tallation In Position With Correct Direction, Tightening Of Studs, Providing Earthing Protection By Way Of Fixing Strips, Complete T He Job In All Respect As Per Drawings And Direction Of The Engineer-In-Charge, Including All Labour, Tools, Tackles, Consumables Andsupervision Etc. And Tightening Of The Gland To Ensure Zero Leak Including Hot Bolting Wherever Applicable. For Job Execution Beyon D 5 Mtr. Elevation Above Or Below Ground Level, Rates Are To Be Escalated By 10% For Every 5 Meters. Requirement Of Scaffolding To B E Envisaged And Decided By Engineer In Charge As Per Site Requirement And Scaffolding Item To Be Paid Separately. For Valves ( Other Than Rtj ) 72 Removal Of Flanged / Rtj Valves / Level Troll / Fire Hydrant / Monitors / Safety Valves Etc. Dismantling And Removal Of All Types Of Flanged Including Rtj Valves, Level Troll, Fire Hydrant, Monitor By Debolting / Cold / Hot Cut Ting Of Fasteners Wherever Required From Pipelines At Ground Level I.E. Up To A Height Of 5 Meters On Sleepers, Pipe Racks Etc. Or U P To 5 Meters Depth In Trenches Including Removal Of Gaskets, Nut Bolts Etc. And Transportation Either To OwnerS Storage Point / Wo Rkshop And / Or Scrapyard Including Loosening Of Studs, Disconnecting Earthing Protection All Complete As Per Direction Of The Engin Eer-In-Charge Including All Labour, Tools, Tackles, Consumables And Supervision Etc. For Job Execution Beyond 5 Mtr. Elevation Aboveor Below Ground Level, Rates Are To Be Escalated By 10% For Every 5 Meters. Requirement Of Scaffolding To Be Envisaged And Decided By Engineer In Charge As Per Site Requirement And Scaffolding Item To Be Paid Separately. 73 Supply Of N2 Gas Refilled Cylinders ( Each Cylinder 50 Liter Capacity ) Including Transportation. 74 Provision Of Reinforcement Pad ( With Welding Electrode E-6010 / E-7018 Or Tig Welding ) Transportation From OwnerS Storage Points To Work Site And / Or Pre-Fabrication Yard And To Site After Pre-Fabrication; Cutting, Gri Nding, Edge Preparation, Welding, Preparation Of Weld Pad / Reinforcement Pad / Supply Of Full Encircled Sleave As Per The Instructions Of The Engineer-In-Charge To His Entire Satisfaction. The Scope Also Includes Supplying Of All Types Of Tools And Tackles, Lifting A Rrangements, Equipment, Material, Machineries, All Consumables And Labour Etc. To Complete The Work In All Respects Including Area P Reparation For Hot Jobs, Area Cleaning After Completion Of Work, Hydrostatic Testing, Restoration Of Site, Cleaning Of Pipes Externa Lly Off All Foreign Materials Like Weld Beads, Clamps Fixtures Etc. Used In Fabrication As Directed By The Engineerin-Charge. Note : 1. Proper Safety Arrangements For Carrying Out The Job Is Under ContractorS Scope And The Same Has To Be Complied With As Per The D Irections Of The Engineer- In-Charge. 2. For Job Execution Beyond 5 Mtr. Elevation Above Or Below Ground Level, Rates Are To Be Escalated By 10% For Every 5 Meters. 3. Requirement Of Scaffolding To Be Envisaged And Decided By Engineer In Charge As Per Site Requirement And Scaffolding Item To Be P Aid Separately. 4. Type Of Welding To Be Used Shall Be Decided As Per Site Conditions By Eic / Site Engineer. 5. Full Sleave Installation To Be Considered As 04 Nos. Of Reinforcement Pad. 75 Branch Size 2 Inch 76 Branch Size 3 Inch 77 Branch Size 4 Inch 78 Branch Size 6 Inch 79 Branch Size 8 Inch 80 Branch Size 12 Inch 81 Supply Of 4 Butterfly Valve For Water Monitor And Hydrant Connected In Fire Water Network. 82 Supply Of Sprinkler Nozzles 83 Supply Of Cotton Hand Gloves ( Ea = Pair ) 84 Low Temperature Hand Gloves For Lpg Handling ( Ea = Pair )

Key Value

Document Fees
Refer document
EMD
INR 23900.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Rate Contract for servicing and maintenance of firefighting equipments at NRPL Karnal (PNP23080)
Sl. No. Item Description
1FFEs Maintenance at Karnal
2Checking, Inspection, Servicing and Maintenance of Fire Fighting System, equipment, hydrants, extinguishers of all type ,Water/ foammonitor as per OISD/ISI Standards to providebest functioning of the equipments always inbest healthy condition inclusive of per iodically cleaning ,checking/inspection/oiling/greasing of assembliessuch as coupling, nozzles ,valves, hydrants, extinguishers, h ose pipes ,water/foam monitors, nozzles foam monitor, hose boxes ,sand buckets etc, updation ofthe data & identificationtags , r ecording the status of checking in history register etc. as directed by the Engineers in chargewith all labors ,tools and tackles and materials etc. complete (inspection and servicing of the equipment/Fire Fightingfacilitiesis to be doneperiodically as men tionedagainst each):-
3Maintenance and inspection of double headed hydrants as per direction of EIC. Reporting to be done as per owner supplied format incl uding oiling , greasing ,testing as per direction of EIC inclusive of all tools & tackles, consumable, transportation, labour char ges etc
4Maintenance and inspection of Fire Extinguishers of all types & Capacity as per direction of EIC. Reporting to be done as per owner supplied format including cleaning, filling of DCP Powder, replacement of CO2 cartridge/washer/Cap/Discharge Pipe/Squeezing Grip etc . if required as per direction of EIC inclusive of all tools & tackles, consumable, transportation, labour charges etc
5Maintenance and inspection of Fire Hose as perdirection of EIC. Reporting to be done as per owner supplied format including cleaning , replacement of washer/spring/lock etc. if required as per direction of EIC inclusive of all tools & tackles, consumable, transport ation, labour charges etc
6Maintenance and inspection of Hose Box as perdirection of EIC. Reporting to be done as per owner supplied format including cleaning,replacement of front glass/key box glass/key/rubber gasket etc. if required as per direction of EIC inclusive of all tools & tackle s, consumable, transportation, labour charges etc
7Maintenance of all kind of isolation valves of all sizes in Fire water line, Hydrants, Monitors, Tank sprinkler line and Tank foam l ine by opening the same, lapping, greasing, oil as required for the job with supply of all man, material, greases required for the w ork.
8Maintenance and inspection of Foam / Water Monitors by Cleaning, greasing, oiling, operating in 360 deg. for any kind of blockage/da mage as per direction of EIC inclusive of all tools & tackles, consumable, transportation, labour charges etc.
9Maintenance and inspection of Nozzles all types including foam branch
10Maintenance of Sand buckets with supply of sand for all bucket.
11Maintenance of Foam Trolley & All Foam tank 200/1000 ltr. Capacity
12PPE maintenance / up keep on Monthly Basis like as helmets., Breathing Apparatus -,Water jel blanket, Resuscitation set, Fire proxim ity suite-Goggles, Belts, Stretcher and other PPES as per instruction of Engineer-in-Charge .
13Cleaning & stacking properly the AFFF foam containers,updating stock,date of expiry,date of manufacturing on board and in register,p lacing foam containers at the foam monitors and water hydrants.
14Cleaning/ De-chocking of nozzles of water spray system at MLPU Shed, Piping Area, Hook up Point Area, Substation Area and water curt ain system at Control RoomBuilding, HT Transformer by opening nozzle, dechocking & refitting the same as per direction of site eng ineer/ EIC complete in all respect including labour , tools tackles , consumable etc
15Taking the Hose Pipe for Hydrotesting, hydrotest and keeping it back in position after drying /rolling etc. as per direction of siteengineer/ EIC complete in all respect including labour , tools tackles , consumable etc.
16Taking delivery and refilling the extinguishers of various sizes /capabilities with dry or ABC chemical powder,CO2 gas, Clean Agen t/Oxygen/Air, foam compound etc updating the data& identification tags, recording the status of checking in history register etc a s per ISI standard and replacing the same as directed by Engineer-in-Charge (The rates are inclusive of all Taxes). (The CO2/N2 ga s/ Clean Agent/Oxygen/Air cylinder may to be taken out and delivered back within 10 days after re-filling /repairing.However Fire extinguishers CO2 and N2 are to be supplied /Kept temporary in place of each fire extinguisher for which taking out for re-filling / repairing is required).
17Supply and Replenishment of Dry Chemical Powder as per relevant IS code
18Refilling of CO2 gas in cartridge for using in DCP extinguisher including all labour,transportation etc. Complete as per specificati on and direction of EIC/Site engineer (CO2 Cartridge of 200 gms)
19Refilling of high pressure CO2 Extinguisher (Capacity 2.0 Kg) through CCE approved party and charging upto required pressure includi ng taking delivery of the cylinder from the station and returning the same inclusive of alllabour material, transportation and all.
20Refilling of high pressure CO2 Extinguisher (Capacity 4.5 Kg) through CCE approved party and harging upto required pressure includin g taking deliveryof the cylinder from the station and returning the same inclusive of alllabour material, transportation and all
21Refilling of high pressure CO2 Extinguisher (Capacity 6.8 Kg/9.0 Kg) through CCE approvedparty and charging upto required pressure i ncluding taking deliveryof the cylinder from the station and returning the same inclusive of alllabour material, transportation and all.
22Refilling of Clean Agent Fire Extinguisher of capacity2Kg/4Kg/6Kg by Hexafluoropropane ((HFC 227ea) Note: Cylinder refilling proce ss report must be certified/ inspected by an IOCL nominated TPI agency. This rates includes Packing and transportation charges (To &Fro). Packing of cylinders with all required accessories for refilling from IOCL Installation and packing of refilled cylinders fro m filling station are to be done in such way that cylinders must not be damaged or integrity of cylinders must not be weakened whiletransporting between both locations. To and From charges or freight charges are for transporation of cylinders & other required acc essories between IOCLInstallation and Filling station.
23Oxygen filling in cylinders of Resuciator Apparatus/emergency escape set
24Refilling of breathing apparatus set cylinder with dry compressed air up to a pressure of 200/300 bar as per direction of EIC,inclus ive of transportation handling charges,hydrotestingcomplete in all respect
25Hydraulic testing of CO2 Cylinders of sizes 2.0 Kg/4.5 Kg/6.8Kg/Breathing Apparatusfrom CCE approved party and charging upto requi red pressure including taking delivery of the cylinder from the station and returning the same inclusive of all labour material, tra nsportation and all as per relevant standards.
26Hydraulic testing of DCP Cylinders 10 Kg from CCE approved party and charging upto required pressure including taking deliveryof thecylinder from the station and returning the same inclusive of alllabour material, transportation and all as per relevant standards.
27Hydraulic testing of Clean Agent Cylinders ( 2 to 4.5 Kg/Cm2) from CCE approved party and charging upto required pressure including taking deliveryof the cylinder from the station and returning the same inclusive of alllabour material, transportation and all as per relevant standards.
28Refilling & Hydraulictesting of DCP cylinders (25/45/50/75 Kg) from CCE approved party and charging upto required pressure inc luding taking deliveryof the cylinder from the station and returning the same inclusive of alllabour material, transportation and al l as per relevant standards.
29Hydrostatic testing, inspection of safety valve, changing of rupture disc and refilling of high pressure cylinder through CCE approv ed party and charging upto required pressure including taking delivery of the cylinder from the station and returning the same inclu sive of all labour material, transportation and all the other incidental expenses)The cylinder is to be returned back to the stationwithin 15days from the date of receiving from the station.(For 45 Kg CO2 cyl.)
30Supply and replacing the spares /assembles etc of the FireFightingequipments system for all sizes /Capacities asperISI stand ardand approved make with all labours ,materials, ,tools and tackles carriages , with all taxes duties etc .complete
31Supply and fixing PVC Discharge Pipes for 10 Kg DCP Extinguishers
32Supply and fixing Cast Iron Wheel for Hydrants
33Supply and fixing Hydrants seat washer/Rubber including fitting at site
34Supply and fixing Hydrants coupling washer
35Supply and fixing PVC Lockfor Extinguishers
36Supply & fitting of HDPE discharge horn for 2.0/4.5 / 6.8Kg capacity CO2 extinguishers with fittingsas per direction of EIC.
37Supply and fitting of CO2 extinguisher Safety pin assembly
38Supply & fitting of Discharge Pipe with Horn for all type of CO2 Exitinguisher 2.0-4.5Kg
39Supply & Fitting of DCP extinguisher cap washer for 10 Kg DCP Extinguisher as per direction of EIC.
40Supply and Replacement DCP mainCap (gun metal)
41Supply and Replacement Squeezing grip (Plastic)
42Supply and Replacement of fire box glass (front)
43Supply and Replacementof Key Box Glass
44Supply and fixingHydrant Blind Cap with chain(Rubber)
45Supply & fixing Rubber tube of pick up tube of FB5X with strainer
46Supply and Replacement of Safety valves 155 kgf/cm2 for CO2 cylinder bank / 75 KG DCP tank / Air vessel.
47Supply and Replacement DCP Plunger Pin with Spring
48Supply and Replacement DCP Plunger top
49Supply & Replacemnt (S&R) of 200 gm CO2 cartridges. S&R of new CO2 cartridges for using in DCP extinguishers including all labour, t ransportation etc.. complete as per specification and direction of EIC/Site-Engineer. (CO2 Cartridge of 200 gms)
50Supply & fitting of metal clamps for hanging 2Kg / 4.5KgCO2 extinguisher on wall including labour charges, tools tackles & consuma bles complete in all respect as per direction of EIC/SE.
51Supply & Fixingof Hose box key
52Supply& Fixing of"F" keymadefrom8 mm size MS rods withPriming /painting
53Supply& Fixing of "F" Keymadefrom 12 mm size MSrods with Priming/painting
54Supply& Fixing of "F" Keymadefrom 16 mm size MSrods with Priming/painting
55Supply& Fixing Sandbuckets with covers
56Supply& Fixing winds socks only
57Supply& fixing of smallhammers with chains for Hoseboxes.
58Painting Works: Supply and painting with two coats synthetic enamel paint(Asian Paint)Fire paint including scrapping cleaning ,one c oat of red oxide paint if required etc as per ISI standards and approved make with all labors , materials, carriages, all taxes etc includingletter writingidentification marketc complete:
59Spray/ Brush painting of fire boxes includingstand with 2 coats Luminous yellow Paint
60Spray/ Brush Painting and Marking of fire Bucket Stand with four Buckets, canopy etc including nomenclature/stickers
61Spray Painting and Marking of Fire Extinguisher of all sizes including nomenclature/stickers.
62Spray/brush painting of Foam/water monitors/ Double hydrant valves along with its stand post including letter/number writing.
63Spray/ Brush Painting of Fire Siren including letter/number writing.
64Removing old damaged wire mesh in Cold Flare Unit outlet and replacing with new one as directed by EIC including tools tackles all c omplete.
65"Writing of slogans (in Hindi, English) at all heights with approved paints and shade as per the direction of EIC, date changing on walls, numbering on hydrant valve ,post,direction marking etcas perinstructions alongwith all tools, tackles, material etc. Th e rate covers back ground painting (application of 1 coat primer and 2 coat paint on the board/wall before writing)
66Supplying, fabricating and fixing M.S structure steel work made of joints, tubes, pipes, channels, angles, plates, flats, bars etc f or struts, chain link fencing as per drawing including gate, ladders, safety grills, walkways, collapsible gate, signboards, support s for cable trench, making slots for barbed line, wire hoisting, placing in position, embedding in concrete, applying two coat of ep oxy paint #EPILUX 155 High Build Enamel over a coat of EPILUX 610 Primer of M/s Berger or any other approved equivalent make as per manufacturer#s recommendation, complete in all respect including cutting to required size welding of joints, fixing anchor, plates, bolts, threading, nuts, washers, sleeves etc and necessary lettering of approved pattern on main gate, signboards etc. complete in a ll respects inclusive of cost of all labour, materials, tools, tackles etc. as per drawings, specification and direction of Site Eng ineer. (Excluding the cost of concrete work)
67"Supply and installation of display board including ACP sheet/Sun Board, Digital Eco-solvent Venyl printing with lamination and past ing with all tool, tackle material as per direction of EIC/SE.
68"""Printing of flex banner as per direction of EIC"" "
69Supply and pasting of radium sticker of required size as per direction of EIC/SE
70Painting any shade as directed with best quality Synthetic Enamel of ASIAN, BERGER or other equivalent approved make and brand on st eel/timber/plastic/metal including smoothening the surface by sand papering etc complete with all labour and materials complete in a ll respects as directed. Two or more coats on old work over an under coat of suitable shade with ordinary paint of approved brand an d manufacture.
71"INSTALLATION OF FLANGED / RTJ VALVES/ LEVEL TROLL/ FIRE HYDRANT/ MONITORS/ SAFETY VALVES ETC. Transportation of all types of flanged / RTJ valves, level troll, fire hydrant, monitor, gaskets, nut bolts etc. either from owner"sstorage point to workshop and/ or worksite. Installation at ground level i.e. up to a height of 5 meters on sleepers, pipe racks et c. or up to 5 meters depth in trenches including assembly of valve accessories, cleaning of flanged faces, lapping of RTJ rings, pro viding new gasket (IOCL supplied) or cutting of new gaskets to proper size if required, placing the gaskets / RTJ ring properly, ins tallation in position with correct direction, tightening of studs, providing earthing protection by way of fixing strips, complete t he job in all respect as per drawings and direction of the Engineer-in-Charge, including all labour, tools, tackles, consumables andsupervision etc. and tightening of the gland to ensure zero leak including hot bolting wherever applicable. For job execution beyon d 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. Requirement of scaffolding to b e envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately. For Valves (other than RTJ)"
72"REMOVAL OF FLANGED / RTJ VALVES/ LEVEL TROLL/ FIRE HYDRANT/MONITORS/ SAFETY VALVES ETC. Dismantling and removal of all types of flanged including RTJ valves, level troll, fire hydrant, monitor by debolting/ cold/ hot cut ting of fasteners wherever required from pipelines at ground level i.e. up to a height of 5 meters on sleepers, pipe racks etc. or u p to 5 meters depth in trenches including removal of gaskets, nut bolts etc. and transportation either to owner"s storage point / wo rkshop and / or scrapyard including loosening of studs, disconnecting earthing protection all complete as per direction of the Engin eer-in-Charge including all labour, tools, tackles, consumables and supervision etc. For job execution beyond 5 Mtr. elevation aboveor below ground level, rates are to be escalated by 10% for every 5 meters. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be paid separately."
73Supply of N2 gas refilled cylinders (each cylinder 50 liter capacity) including transportation.
74"PROVISION OF REINFORCEMENT PAD (WITH WELDING ELECTRODE E-6010/E-7018 or TIG WELDING) Transportation from owner"s storage points to work site and/ or pre-fabrication yard and to site after pre-fabrication; cutting, gri nding, edge preparation, welding, preparation of weld pad/reinforcement pad/supply of full encircled sleave as per the instructions of the Engineer-in-Charge to his entire satisfaction. The scope also includes supplying of all types of tools and tackles, lifting a rrangements, equipment, material, machineries, all consumables and labour etc. to complete the work in all respects including area p reparation for hot jobs, area cleaning after completion of work, hydrostatic testing, restoration of site, cleaning of pipes externa lly off all foreign materials like weld beads, clamps fixtures etc. used in fabrication as directed by the Engineerin-Charge. NOTE : 1. Proper safety arrangements for carrying out the job is under contractor"s scope and the same has to be complied with as per the d irections of the Engineer- in-Charge. 2. For job execution beyond 5 Mtr. elevation above or below ground level, rates are to be escalated by 10% for every 5 meters. 3. Requirement of scaffolding to be envisaged and decided by Engineer in Charge as per site requirement and scaffolding item to be p aid separately. 4. Type of welding to be used shall be decided as per site conditions by EIC/site engineer. 5. Full Sleave installation to be considered as 04 nos. of reinforcement pad."
75Branch size 2 inch
76Branch size 3 inch
77Branch size 4 inch
78Branch size 6 inch
79Branch size 8 inch
80Branch size 12 inch
81Supply of 4" Butterfly Valve for Water Monitor and Hydrant connected in Fire Water Network.
82Supply of sprinkler nozzles
83"Supply of Cotton hand Gloves (EA = Pair)"
84"Low Temperature Hand Gloves for LPG handling (EA = Pair)"
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail