Power Boards / Undertakings / PSU Closing in 0 days TDR #41289826

Construction Of Ht, Lt Line, 11/0.4 Kv Sub Station And L.T. Extension Work To Giving New Connection In Ht/Lt Scheme As Per Uerc Regulation In 33/11 Kv S/S Lalpur Under Electricity Distribution Division, Kichha

Issued by Boards / Undertakings / PSU · lalpur, Uttarakhand
Tender Value
Ref. Documents
Estimated cost
Bid Submission
11 Jan 2024
0 days left
EMD
75000
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
lalpur → Uttarakhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of Ht, Lt Line, 11 / 0.4 Kv Sub Station And L.T. Extension Work To Giving New Connection In Ht / Lt Scheme As Per Uerc Regulation In 33 / 11 Kv S / S Lalpur Under Electricity Distribution Division, Kichha

BOQ

Name of Work:- Construction of HT, LT line, 11/0.4 KV sub station and L.T. Extension work to giving new connection in HT/LT Scheme as per UERC regulation in 33/11 KV S/s Lalpur section under Electricity Distribution Division, Kichha (U.S. Nagar)under the head NSC.(Rates quoted without GST) (GST will paid extra)
Sl. No. Item Description
1Annexure-A (LABOUR CHARGES)
2Earthing of support with M.S. Earth rod of 2.5 meter long by hammaring of M.S. Rod to proper depth and connecting the earth electrod with the help of G.I. wire as per construction manual.
3Excavation of earth for stay pit of size 0.6x0.6x1.2 mtr in all types of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work
4Fixing,tightening and nozzling of stay with pole and stay rod on required tension as per drawing/manual in LT line
5Fixing,tightening and nozzling of stay with pole and stay rod on required tension as per drawing/manual in 11 KV Line
6Grouting of Stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 (1 cement :4 graded stone 20mm nominal size: 8 coarse sand ) block includ ing cost of Cement,sand andstone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO Manual.
7Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all types of soil including prop er dressing of sides and ramming of bottom including etting out the excavated soil and disposal of surplus excavated soil as directed complete work.
8Erection of PCC single support pole in proper level and alignment along with fixing of all accessories like top channel,& clamps as per RESPO manual.
9Erection of SP-23 single support pole in proper level and alignment along with fixing of all accessories like top channel,& clamps as per RESPO manual.
10Erection of SP-33 single support pole in proper level and alignment along with fixing of all accessories like top channel,& clamps as per RESPO manual.
11Erection of SP-55 single support pole in proper level and alignment along with fixing of all accessories like top channel,& clamps as per RESPO manual.
12Erection of SP-72 single support pole in proper level and alignment along with fixing of all accessories like top channel,& clamps as per RESPO manual.
13Erection of PCC double support pole in proper level and alignment along with fixing of all accessories like top channel, X bracings &clamps as per RESPO manual.
14Erection of SP-23 double support pole in proper level and alignment along with fixing of all accessories like top channel, X bracings & clamps as per RESPO manual.
15Erection of SP-33 double support pole in proper level and alignment along with fixing of all accessories like top channel, X bracings& clamps as per RESPO manual.
16Erection of Sp-55 double support pole in proper level and alignment along with fixing of all accessories like top channel, X bracings & clamps as per RESPO manual.
17Muffing of poles size 0.45x0.60 cm radius with 1:3:6(1 cement:3 coarse sand :graded stone 10 mm nominal size) block size 45 cm height from ground level including cost of cement,stone and sand etc.
18Dismantling of Transformers from double pole /plinth including openingof all connections, circuts & earthing strip etc. (25 KVA)
19Dismantling of Transformers from double pole /plinth including openingof all connections, circuts & earthing strip etc. (63 KVA)
20Dismantling of Transformers from double pole /plinth including openingof all connections, circuts & earthing strip etc. (100 KVA)
21Installation of 33/11 KV Metering cubical in the Metering room with groutingand making all connection.
22Loading, unloading & carriage of LT PRMC from Store to pit site & Installation on the double pole with the help of Nut Bolt & Clamp and making to pass LT cable from T/F to PRMC.
23Laying and erection of L.T. PVC Cable including crimping of lugs of size 1x70,120, 150 Sq.mm. (Including all cost of material)
24Digging of trench of size 0.60x0.15 x 1.5 mtr. and laying of underground11 KV XLPE cable with makingof brick housing and fillingof sand including filling of earth with ramming. & repairing of road includingcost of cement sand and stone blast
25Installation / mounting of new 100 KVA Tranformer on pole structure and fixing of channel / angle etc. and making all connections ofHt and LT side and its complete commissioning.
26Installation / mounting of new 63 KVA Tranformer on pole structure and fixing of channel / angle etc. and making all connections of Ht and LT side and its complete commissioning.
27Installation / mounting of new 25 KVA Tranformer on pole structure and fixing of channel / angle etc. and making all connections of Ht and LT side and its complete commissioning.
28Mounting & Fixing of Fuse sets on double pole structures including making of connections complete work
29Fixing of triangular type bracket on 11 KV line
30Laying, Spreading, Stringing and sagging of 11 KV / 33 KV line in 3 phase (3 Phase 3 wire) of ACSR Weasel as phase wire with G.I. earth wire complete including fixing of all accessories in 3 Nos. conductor in parallel with binding and jumpering as per profile and profile and sagging chart.
31Laying, Spreading, Stringing and sagging of 11 KV / 33 KV line in 3 phase (3 Phase 3 wire) of ACSR Rabbit as phase wire with G.I. earth wire complete including fixing of all accessories in 3 Nos. conductor in parallel with binding and jumpering as per profile and profile and sagging chart.
32Laying, Spreading, Stringing and sagging of 11 KV / 33 KV line in 3 phase (3 Phase 3 wire) of ACSR Dog as phase wire with G.I. earthwire complete including fixing of all accessories in 3 Nos. conductor in parallel with binding and jumpering as per profile and pro file and sagging chart.
33Laying, Spreading, Stringing and sagging of L.T. Lines of ACSR Weasel as phase wire(3 phase 4 wire) with G.I. earth wire complete wi th binding and jumpering as per RESSPO Specn
34Laying, Spreading, Stringing and sagging of L.T. Lines of ACSR Weasel as phase wire(2 phase 3 wire) with G.I. earth wire complete wi th binding and jumpering as per RESSPO Specn
35Laying, Spreading, Stringing and sagging of L.T. Lines of ACSR Weasel as phase wire(1 phase 2 wire) with G.I. earth wire complete wi th binding and jumpering as per RESSPO Specn
36Route cleareance by cutting of tree branches / proning, loping and chopping of trees for L.T., 11 & 33 KV line.
37T-off Connection Complete 11 KV line
38Laying,Sagging & binding of AB cable of size 120 sqmm.(Only for cable,additional provisions to be made for matching accessories inst allation,case of any network modification i.e additionalpole etc. and for actual connection,disonnection as per site condition.
39Making of section pole for existing LT/HT/33KV line complete in all respect.
40Jointing and fixing of cable jointing kit indoor/outdoor 11 KV XLPEheat shrinkable cable boxes
41Cartage of PCC Poles from store centre to construction site with loading, unloading at both points and proper stacking.(Distance 21- 50 Km)
42Cartage of ST pole SP-21/23 Poles from store centre to construction site with loading, unloading at both points and proper stacking. (Distance 21-50 Km)
43Cartage of ST pole SP-33 Poles from store centre to construction site with loading, unloading at both points and proper stacking.(Di stance 21-50 Km)
44Cartage of ST pole SP-55 Poles from store centre to construction site with loading, unloading at both points and proper stacking.(Di stance 21-50 Km)
45Cartage of ST pole SP-72 Poles from store centre to construction site with loading, unloading at both points and proper stacking.(Di stance 21-50 Km)
46Cartage of other material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and unloading at both ends(distance 21-50 Km)
47Cartage of the 16/25 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 21-50 Km)
48Cartage of the 63 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 21-50 K m)
49Cartage of the 100 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 21-50 Km)
50Cartage of the 33 KV VCB,feeder panels(O/D),T/F Control panel from store center to construction site with loading and unloading at both points.(Distance 21-50 Km)
51Headload cartage of PCC Pole from road to site(distance 0-1 Km)
52Headload cartage of SP-21/23 Pole from road to site(distance 1-3 Km)
53Headload cartage of SP-33 Pole from road to site(distance 0-1 Km)
54Headload cartage of SP-55 Pole from road to site(distance 0-1 Km)
55Headload cartage of SP-72 Pole from road to site(distance 0-1 Km)
56Head load cartage of small material(distance 0-1 Km)
57Head load cartage of small material(distance 1-3 Km)
58Headload cartage of 25 KVA transformer from road to site(distance 0-1 Km)
59Headload cartage of 63 KVA transformer from road to site(distance 0-1 Km)
60Headload cartage of 100 KVA transformer from road to site(distance 0-1 Km)
61FABRICATION OF STEEL FOR STRUCTURE
62DIGGING OF PIT FOR MAKING TRENCH 0.6X0.15X1.5 MTR FT DEPTH,INCLUDING BRICK AND SAND WORKINCLUDING BACK FILLING AS PER RESPO
63LAYING STRINGING AND SAGGING OF LT AB CABLE 3X70+1X50 SQMM
64Digging of Pit through Hammer at CC, DAMAR Road
65Transportation Charges of 25 KVA including packing, forwarding, loading, unloading, stacking and transit insurance.
66Transportation Charges of 63 KVA including packing, forwarding, loading, unloading, stacking and transit insurance.
67Transportation Charges of 100 KVA including packing, forwarding, loading, unloading, stacking and transit insurance.
68Annexure-B (SUPPLY ITEMS)
69Supply of F CLAMP
70Supply of X ARM CLAMP FOR PCC POLE WITH N/B
71Supply of X ARM CLAMP FOR ST POLE SP-55 WITH N/B
72Supply of LT CLAMP FOR PCC POLE WITH N&B
73Supply of LT CLAMP WITH N&B ST POLE SP-55
74Supply of STAY CLAMP FOR ST POLE WITHNUT BOLT
75Supply of DOUBLE POLE CLAMPS WITH N/B FOR PCC POLE
76Supply of DOUBLE POLE CLAMPS WITH N/B FOR SP-55
77Supply of STAY CLAMP WITH N&B PCC POLE 8.5 MTR
78Supply of STAY INSULATOR 75x90 MM
79Supply of SHACKLE INSULATOR 75X90 MM WITH NUT BOLT
80Supply of Piercing connector for 120-95 SQ.MM
81Supply of Piercing connector for 95-35 SQ.MM
82Supply of LT DISTRUBITON BOX 3 PHASE
83Supply of CRIMPING TYPE Al. LUGS (25-100) SQ.MM
84Supply of MS Flat 40x6 MM

AI Tender Summary

OUR REF NO 41289826
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 11-01-2024
Authority
Authority Name Uttarakhand Power Corporation Limited
Work Description Construction Of Ht, Lt Line, 11 / 0.4 Kv Sub Station And L.T. Extension Work To Giving New Connection In Ht / Lt Scheme As Per Uerc Regulation In 33 / 11 Kv S / S Lalpur Under Electricity Distribution Division, Kichha
Basic Detail
Tender No EDC(USN)48/2023-24
Bidding Type Tender
Location
City lalpur
State Uttarakhand
Key Dates
Publish Date 23 Dec 2023
Submission Date 11 Jan 2024
Open Date 12 Jan 2024
Finance
Tender Value Ref. Documents
Tender Fee 1180
EMD 75000
Exemption Not Available
Document List
BOQ_80570.xls
Drawing.pdf
FormAandB.pdf
General.instruction.48.pdf
Technical.specification1._1.pdf
TechnicalSpecification2.pdf
Tendernotice_1.pdf
TN.tenderdocument.482324.pdf
fd7d60c6-e69a-431e-8c56-a7f4056d4f12.html

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Dec 23, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Jan 11, 2024
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jan 12, 2024

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
xls

BOQ_80570.xls

pdf

Drawing.pdf

pdf

FormAandB.pdf

instruction

General.instruction.48.pdf

specification1

Technical.specification1._1.pdf

pdf

TechnicalSpecification2.pdf

pdf

Tendernotice_1.pdf

tenderdocument

TN.tenderdocument.482324.pdf

html

fd7d60c6-e69a-431e-8c56-a7f4056d4f12.html

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders