| 1 | Labour charges for earth work excavation(manual) for retriving of3core, 300Sq.mm 11KV(HT)UG cable, 31/2 core, 300Sq.mm, 3 1/2 core, 70Sq.mm 1.1KV( LT)UG cable at a depth of maximum 1.5Mtrs. including refilling, retriving of cable covering protection items like brick, trough etc., coiling of cable in the cable drum if any and transportation of cable, brick, trough etc. to the new location within lead of maximum 2KM,s including cost of all material including supply of empty cable drum if any, labour, transport, fuel etc |
| 2 | Labour charges for earth work excavation(manual) for retriving of4core, 25Sq.mm 1.1KV ( LT)UG cable at a depth of maximum 1.5Mtrs. including refilling, retriving of cable covering protection items like brick etc., coiling of cable in the cable drum if any and transportation of cable to admin building within lead of maximum 4KM including cost of all material including supply of empty cable drum if any, labour, transport, fuel etc |
| 3 | Labour charges for earth work excavation(manual) for retriving of110mm dia PVC water pipe line at a depth of maximum 1.5Mtrs. including refilling,dismantling of PVC pipes as per standard length including joining accessories etc. and transportation of pipes to admin building within lead of maximum 4KM including cost of all material includinglabour, transport, fuel etc |
| 4 | Labour charges for earth work excavation and refilling for laying of31/2 core, 300Sq.mm & 3 1/2 core, 70Sq.mm 1.1KV( LT)UG cable at a depth of maximum 1Mtr. including unreeling of cable from the cable drum, providing covering protection items like brick, trough etc.,including cost of all material including supply of empty cable drum, labour, transport, fuel etc |
| 5 | Labour charges for laying of3core, 300Sq.mm 11KV(HT)UG cable & 3 1/2 core, 300Sq.mm 1.1KV( LT)UG cable at a depth of maximum 1Mtr. in the existing excavated trench / RCC cable trench including unreeling of cable from the cable drum, providing covering protection items like brick, trough etc.,including cost of all material including supply of empty cable drum, labour, transport, fuel etc |
| 6 | Labour charges for laying of 110mm dia PVC water pipe line in the existing excavated trench / RCC cable trench as per standard length including supply of joining accessories etc. and transportation of pipes from admin building to site within lead of maximum 4KMincluding cost of all material including labour, transport, fuel etc |
| 7 | Supply and providing of 3 core, 300Sq.mm HTUG cable heat shrinkable straight through joint kit complete with all accessories including ferrules suitable for XLPE aluminium cable |
| 8 | Supply and providing of 31/2 core, 300Sq.mm LTUG cable heat shrinkable straight through joint kit complete with all accessories including ferrules suitable for XLPE aluminium cable |
| 9 | Removing of 11Mtr RCC light Pole(9Mtr. Above ground level) along with foundation, Removing oflight fittings & wires, shifting of poles to scrap yard & light fittings to admin. building within lead of maximum 4Km and keep safely including Materials, Labour, fuel, tools etc |