| 1 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M, including all lifts, levelling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I. |
| 2 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I. (Mode of measurement complacted volume). |
| 3 | Supplying and laying (properly as per design and drawing) rip-rap with good quality of boulder duly packed including the cost of materials, royalty all taxes etc. but exvluding the cost of carriage all complete as per specification and deirection of E/I. |
| 4 | Providing and laying cement concrete in tetaining walls, return walls, walls (any thickness) including attached pilasters, columna, piers, abutments, pillars, posts, struts, buttresses, string of lacing couses, parapates, coping, bed blocks, anchor blocks, plain window sills, fillets sunken floor etc. upto floor fice level excluding the cost of centering shuttering and finishing. |
| 5 | Providing random rubble stone masonry in C.M. (1:4) in foundation and plinth with hammer dressed stone of less than 0.03 M3 in volume and clean coarse sand of F.M. 2 to 2.5 including cost of screening, raking out joints to 20mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. |
| 6 | Providing random rubble stone masonry in C.M. (1:4) in superstructure with hammer dressed stone of less than 0.3 M3 in volume and clean coarse sand of F.M. 2 to 2.5 including cost of screening of materials, scafolding, raking out joints to 20mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. |
| 7 | Providing weep holes in brick masonry/plain/reinforced concrete abutment, wing wall with 100 mm dia ac pipe, extending through th full width of the structure with slop of 1v:20H towards and technical specifications. |
| 8 | Providing 25 mm thick cement plaster (1:4) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. |
| 9 | Providing 12 mm thick cement plaster (1:3) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. |
| 10 | Providing tuck pointing (1:3) in cement on stone masonary with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. |
| 11 | Earth filling in foundation trenches and plinth in layers not exceeding 150mm thick well watered, rammed, fully compacted and fine dressed with earth obtained rrom excavation of foundation trenches within a lead of 50 M, and lift of 1.5 M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume). |
| 12 | Carriage of Materials (i) Cement |
| 13 | (ii) Sand |
| 14 | (iii) Chips |
| 15 | (iv) Boulder |
| 16 | Add 18% GST |
| 17 | ADD 1 % LABOUR CESS |