| 1 | Part-1 - SUPPLY |
| 2 | Supply of complete Programmable Logic Control System (PLC System) alongwith its associated Controllers, HMIPIS, Data Communication System (server, firewall etc), Integrated OWS based Annunciationand all hardwares & softwares, System Programming & Documentation system, pheripherals, power supplies,accessories, cables & cable tray ( data, FO, control, power & instrumentation cable for the system supplied by bidder), earthing, desks, panels, and RIO panels, including furniture etc., as per Vol-II of Specs |
| 3 | Supply of UPS, SCVS, 24 VDC SYSTEM, Battery and Battery Chargers (along with racks, earthing) and associated auxiliaries panels etc., as per tender documents. |
| 4 | Supply of complete Vibration Monitoring System( for all HT drives) system and associated special cables and test and calibration kit, analyser, panels etc., |
| 5 | Supply of commissioning spares, Special tools & Tackles and programming kitsif any, calibration and testing of instruments, (for commissioning and after commissioning etc. as per technical specifications) |
| 6 | Part-2 - ERECTION, TESTING & COMMISSIONING |
| 7 | Erection, Testing & Commissioning of complete Programmable Logic Control System (PLC System) along with its associated Controllers, HMIPIS, Data Communication System (server, firewall etc), Integrated OWS based Annunciationand all hardwares & softwares, System Programming & Documentation system, peripherals, power supplies, accessories, cables & cable tray ( data, FO, control, power & instrumentation cable for the system supplied by bidder), earthing, desks, panels, and RIO panels, including furniture etc., as per Vol-II of Specs |
| 8 | Erection, Testing & Commissioningof UPS, SCVS, 24 VDC SYSTEM, Battery and Battery Chargers (along with racks, earthing) and associated auxiliaries panels etc., as per tender documents. |
| 9 | Erection, Testing & Commissioningof complete Vibration Monitoring System( for all HT drives) system and associated special cables and test and calibration kit, analyzer, panels etc., |
| 10 | Erection, Testing & Commissioningof commissioning spares, Special tools & Tackles and programming kitsif any, calibration and testing of instruments, (for commissioning and after commissioning etc. as per technical specifications) |
| 11 | Part-3 - ANNUAL MAINTENANCE |
| 12 | WARRANTY & Annual Maintenance Contract services COST of maintaining complete Plant Control & Monitoring System for FIVE years of trouble free operation of theCHP plant with PLC availability as specified incl.free repair/replacement of all cards/ modules/ peripherals/components /cablesetc., and correction of software problems as per Volume -II of specs incl service providercharges for communication if any. |