|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. a)In cement mortar |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. |
| 3 | Brick work with non modular fly ash bricks conforming to IS:12894, class designation 10 average compressive strength in super structure above plinth level up to floor V level in : a)Cement mortar 1:6 (1 cement : 6 Coarse sand) |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: a) Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 fine sand derived from natural sources :10 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 6 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 12.5mm nominal size derived from natural sources) |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for : a)Foundations, footings, bases for columns |
| 9 | 12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand) |
| 10 | Providing and laying 75 mm thick compacted bed of dry brick aggregate of 40 mm thick nominal size including spreading, well ramming, consolidating and grouting with jamuna sand, including finishing smooth etc. complete as per direction of Engineer in- charge. |
| 11 | Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface |
| 12 | Providing and laying Vitrified tiles in floor with different sizes (thickness to be specified by the manufacturer), with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately). a) Size of Tile 600x600 mm |
| 13 | Hiring of Hydraulic Excavator(3D) including operator, lubricant, fuel and other relevant tools & plants etc. all complete as per directions of Engineer-in-charge. (Shift of 8 hours) |
| 14 | P/F SFRC railling (Majestic railing \"V\" Shape) of size 1000x100x50 mm of M-30 grade concrete suitability reinforced using vibrio compaction process and fixed in a block of mix 1:2:4 (1 cement : 2 coarse sand: 4 graded stone aggregate 20 mm nominal size)( Cost of CC 1:2:4 will be paid separately). |
| 15 | Providing and placing at or near ground level factory made precast Reinforced cement concrete Jersey road barrierof M-30 grade of required shape and size 3000 mm in length x840 mm in height x 610 mm bottom width and 150 mm top width as per drawing attached i/c 8 mm dia steel reinforcement bars 150 mm centre to centre on both ways two nos 12 mmdia mild steel ring 90 cm. longhorizontally as hooksfor lifting the barrier complete as per direction of Engineer-in-Charge. (The rateincludesthe cost of RCC 12 mm dia hooks, steel reinforcement, steel centering, and shuttering,hoisting, loading , unloading placing in places where required etc. complete) |
| 16 | Note:1) Contractor shall follow the relevant NGT, DPCC orders, and or any other govt. authority enforcing environmental and pollution control orders and if any fine/penalty/challan is imposed by any government agency, the cost of the same shall be solely borne by the contractor. |