Tender For Repairs And Routine Maint Of Central Package Ac Plants At Various Centres Including Manning And Operation Of Ac Plants At Naval Dockyard Mumbai Under Ge Nw Kunjali Colaba Mumbai, kunjali-Maharashtra

Military Engineer Services-MES has published Tender For Repairs And Routine Maint Of Central Package Ac Plants At Various Centres Including Manning And Operation Of Ac Plants At Naval Dockyard Mumbai Under Ge Nw Kunjali Colaba Mumbai. Submission Date for this Tender is 13-01-2024. Air Conditioner Tenders in kunjali Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

41177754
Corrigendum : Tender For Repairs And Routine Maint Of Central Package Ac Plants At Various Centres Including Manning And Operation Of Ac Plants At Naval Dockyard Mumbai Under Ge Nw Kunjali Colaba Mumbai
Open Tender
Indian
Maharashtra
kunjali
13-01-2024

Tender Details

Repairs And Routine Maint Of Central Package Ac Plants At Various Centres Including Manning And Operation Of Ac Plants At Naval Dockyard Mumbai Under Ge Nw Kunjali Colaba Mumbai

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 04-Jan-2024 Corrigendum No 1 Other 13-01-2024

Key Value

Document Fees
INR 1000 /-
EMD
INR 218000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: REPAIRS ANDROUNTINE MAINTOF CENTRAL/PACKAGE AC PLANTS AT VARIOUS CENTRES INCLUDING MANNING AND OPERATION OF AC PLANTSAT NAVAL DOCKYARD UNDER GE (NW) KUNJALI, COLABA, MUMBAI
Sl. No. Item Description
1Sch A PART- I (MANNING AND OPERATION) Manning & operation of 02 Nos (two numbers) Central AC Plants in one shift per day ((i.e 0900 to 1700 Hrs) operated by one Refrigeration Mechanic including maintaining periodicalrecords (ie daily check, monthly, quarterly and half yearly)run at a time two compressors and other two and oneare stand by for smooth functioning of entire system of Centres and to maintain the specific temperature 20+2ºC, RH 50+- 5%run for 8hrs daily except Sunday and Holiday and taking care of cleaning , any pilferage, theft or damage etc completeall as specified and directed by Engr-in-Charge,central AC plants installed at(i) 2 x 30 TR capacity Make Voltas, Model 5H120& (ii)2x 30 TR Make Accelat Naval Dockyard (C.NO.70/ MMER Ist floor)
2Manning & operation of Central AC Chiller Plant of 3 x 100 TR capacity (C.NO.54/Wecors, Main bldg 1st Phase, Gr. floor, East Wing run at a time two compressors and other oneis stand by for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% , 8hrs daily except Sunday and Holiday in one shift.(i.e 0900 To 1700 Hrs) with one AC plant operator ( Ref/Mech) per shift andtaking care of cleaning, any pilferage, theft or damage etc completeall as specified and directed Engr-in-Charge.
3Manning & operation of Central AC Plant of capacity 80 Ton (4 x 20 TR capacity) at Naval Dockyard C. No 51 /Wecors ARF Bldg,Ventillation Plant at Terrace, run at a time three compressor and other one is stand by for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% , 08 hrs daily except Sunday and Holiday in one shift.(i.e 0900 to 1700 Hrs) with one AC plant operator ( Ref/Mech)per shift andtaking care of cleaning, any pilferage, theft or damage etc completeall as specified and directed Engr-in-Charge.
4Manning & operation of Central AC Chiller Plant 6x 135 TR capacity, Make : York at C. No 51 /Wecors ARF Bldg, Chiller Plant run at a time three compressors and other are stand by for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5%08hrs daily except Sunday and Holiday in one shift.(i.e 0900 To 1700 Hrs) one AC plant operator ( Ref/Mech)per shift andtaking care cleaning , any pilferage, theft or damage etc completeall as specified and directed Engr-in-Charge.
5Manning & operation of 03 Nos Central Chiller AC Plants 3 x 25.4 TR capacity each plant at C. No 43 /MECI Plant No 1, 2 & 3 IInd Floorrun at a time two compressors and other one is stand by of each plant for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% , 08hrs daily except Sunday and Holiday in one shift.(i.e 0900 To 1700 Hrs) one AC plant operator ( Ref/Mech) per shift andtaking care of cleaning , any pilferage, theft or damage etc completeall as specified and directed Engr-in-Charge.
6Manning & operation of Central AC Plants 3x 30 TR capacity each at C. No 29 /MAST 3rd Floorrun at a time two compressors and other one is stand by of each plant for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% , 08hrs daily except Sunday and Holiday in one shift.(i.e 0900 To 1700 Hrs) one AC plant operator ( Ref/Mech)per shift andtaking care of cleaning, any pilferage, theft or damage etc completeall as specified and directed Engr-in-Charge.
7Manning & operation of Central Chiller AC Plants 3x37.7 TR capacity each at C. No 25 /MOUTrun at a time two compressors and other one is stand by of each plant for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5%08hrs daily except Sunday and Holiday in one shift.(i.e 0900 To 1700 Hrs) one AC plant operator per shift andtaking care of cleaning, any pilferage, theft or damage etc completeall as specified and directed Engr-in-Charge.
8Manning & operation of following 02 Nos (two in numbers)(i) Central AC Plants 3x 40 TR capacity Make Blue Star and (ii) Package AC plant 3x 7.5 TR Make Blue Star Model PAW installed at C. No 32 /MDAG (Main Office)1st Floor & Test House of C. No 32 /MDAG run in one shift per day (shift 08 hrs) each operated by one Refg Mech except including periodical(ie daily check, monthly, quarterly and half yearly)central AC plant run at a time two units of eah plant and other two and oneare stand by for smooth functioning of entire system of Centres and to maintain the specific temperature 20+2ºC, RH 50+- 5%run for 8hrs daily except Sunday and Holiday in one shift.(i.e 0900 to 1700 Hrs) one AC plant operator per shift and including taking care of cleaning, any pilferage, theft or damage etc completeall as specified and directed Engr-in-Charge.
9Manning & operation of following 02 Nos Package AC Plants 2x 7.5 TR & 3x 15 TR capacity at C.No 48 /MEPS Ist Floor Near SSK & C.No 48 /MEPS Ist Floor Near Workshop(one & two units run at a time of both plant and other one is stand by of each plant for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% AC plant consists of the items fitting/ fixtures/ device components for operation 08hrs daily except Sunday and Holiday in one shift.(i.e 0900 To 1700 Hrs) one AC plant operator per shift andtaking care of cleaning, any pilferage, theft or damage etc completeall as specified and directed Engr-in-Charge.
10Manning & operation of Central AC Plants 3x 10 TR capacity each at C. No 36 /MRAC (Instrumentation Bay) Ground Floor, two units run at a time (two compressors and other one is stand by) of each plant for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5%08 hrs daily except Sunday and Holiday in one shift.(i.e 0900 To 1700 Hrs) one AC plant operator per shift andtaking care of cleaning, any pilferage, theft or damage etc completeall as specified and directed Engr-in-Charge.
11Manning & operation of Central AC Plants 3x 15 TR capacity each at C. No 33 /MDAG (GT fuel & Pressure Test Bay)1st Floor, two units run at a time (two compressors and other one is stand by) of each plant for smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5%08 hrs daily except Sunday and Holiday in one shift.(i.e 0900 To 1700 Hrs) one AC plant operator per shift andtaking care of cleaning, any pilferage, theft or damage etc completeall as specified and directed Engr-in-Charge.
12Manning & operation of Central chiller type AC Plant 2X 40TR capacity each at C. No 51 /Wecors Main Slog, Phase -1, Ground Floorrun in single shift dailyfor smooth functioning of entire system and to maintain the specific temperature 20+2ºC, RH 50+- 5% 08 hrs daily except Sunday and Holiday in one shift.(i.e 0900 To 1700 Hrs) one AC plant operator per shift andtaking care of cleaning, any pilferage, theft or damage etc completeall as specified and directed Engr-in-Charge.
13Sch A PART- II Material and labour for dismantling condenser connections for descaling, plugging them and providing 15 mm bore tee outlet for local circulation of mild acid solution in the condenser (separate container and small pump set to circulate mild acid solution through the condenser tubes).The PH value of solution shall be 4 and it shall be checked frequently i.e. every 1 hour during the operation.The Scalgun WS solution or equivalent solution as approved by the GE shall be used for descaling purpose.After 2 to 3 hours of cleaning, if the PH value remains less than 7, flush with fresh water and clean condenser. After above process, both side end covers shall be opened and condenser tubes shall be cleaned with Nylon brush, subsequently after closing the end covers, circulate mild acid solution as specified above and PH value shall be maintained as above, flushing the same with fresh water including recharging of stored refrigerantupto required pressure completeall as specified and directed Engr-in-Charge for condensor of AC Plant 2 x 240 TR capacity (C.NO.51/Wecors,Gr. floor, East Wing, NAVAL DOCKYARD,). Notes:The quoted rates shall also be deemed to include the following elements :- (a) The solution shall be warmed upto 35 Degree Celsius. (b) During the entire process of cleaning, the PH value ofwater shall be 7. (c) Provision of solution for descaling, rubber gaskets, washers, nuts, bolts etc as directed.
14-diito- all as per item No.13.00 here in before butfor Condenser of AC Plant of 3x120 TR Capacity, C.No.51/Wecors, ARF bldg.
15-diito- all as per item No.13.00 here in before butfor Condenser of AC Plant of 3x100 TR Capacity, C.No.54/Wecors, ARF bldg.
16-diito- all as per item No.13.00 here in before butfor Condenser of AC Plant of 2x80 TR Capacity, C.No.51/Wecors, ARF bldg.
17-diito- all as per item No.13.00 here in before butfor Condenser of AC Plant of 1x40 TR & 2x40 TR Capacity, CNo 19 MOUT & C.No.25/MOUT, C.No.51/Wecors, Main Slog,Gr. Floor
18-diito- all as per item No.13.00 here in before but for Condenser of AC Plant of 1 x 12.5TR Capacity , C.No.85/Wecors, Phase-IV, 1 floor.
19-diito- all as per item No.13.00 here in before butfor Condenser of AC Plant of 3x30 TR Capacity, C.No.29/MAST, 3rd floor.
20-diito- all as per item No.13.00 here in before butfor Condenser of AC Plant of 1x25 TR Capacity, C.No.51/Wacors, 1st floor.
21-diito- all as per item No.13.00 here in before butfor Condenser of AC Plant of 3x10 TR Capacity, C.No.36/MRAC, Gr.floor (Instrumantation bay).
22-diito- all as per item No.13.00 hereinbefore butfor Condenser of AC Plant of 2x18 TR Capacity, C.No.43/MECI Plant No.1, 2nd near Auto Control Bay floor (Instrumantation Bay).
23-diito- all as per item No.13.00 here in before butfor Condenser of AC Plant of 3x20 TR & 2 x20 TRCapacity, C.No.43/MECI Plant No.2, 2nd near Electric Bay floor (Instrumantation Bay). And C No- 70 (IstFloor)
24Disconnecting unserviceable burnt motor from base of compressor or water pump set after disconnect of all electric connections and removing for re-winding the burnt electric motor capacity 75/100/125 HP, 3 phase, 50Hz, 415 Volts, rewinding with ISI marked new super enameled copper winding wire of existing gauge from approved workshop, replacement of un serviceable front and rear bearings including loading, unloading and transportion to and fro Workshop & Plant including varnishing, heating for drying, testing on load complete after completion of rewinding work and back to installation including refixing, alignment the motor at its original location and electric connection completeall as specified and directed Engr-in-Charge. NOTES: The quoted rates shall also be deemed to include the following elements:- (a) Disconnecting & removing the electric motor from installed position includingloading, unloading and transporting to approved workshop. (b) Dismantling the existing burnt winding from the motor including winding with new super enamelled copper winding wire of existing gauge, also including provision of all insulating material such as insulation paper, sleeves, tape, varnish etc complete in all respects for class ’F’ insulation. (c) Transporting the motor back to the location, reinstalling in original position including making alignment, electric connection etc complete, commissioning and testing for 8 hours continuously to check the RPM to the satisfaction of Engineer-in-Charge.(Note : Any damage caused during handling and rewinding etc will be made good by the contractor at his own cost). (d)The existing motors are installed at , NAD Mine Workshop & Wacors ARF Bldg
25-ditto- all as per item No.14.00 above but175/200/220 HP capacity motor
26-ditto- all as per item No.14.00 above but 30/ 40/45 HP capacity motor
27-ditto- all as per item No.14.00 above but20/25 HP capacity motor
28-ditto- all as per item No.14.00 above but 10 /15 HP capacity motor.
29-ditto- all as per item No.14.00 above but 7.5 HP capacity Motor.
30-ditto- all as per item No.14.00 above but 5 HP capacity Motor.
31-ditto- all as per item No.14.00 above but 3 HP capacity Motor.
32-ditto- all as per item No.14.00 above but 2 HP capacity Motor.
33Dismantling of Monoblock pump of under mentioned capcity from connected suction/delivery pipes and electric connections etc, taking to workshop, overhauling of the same and replacing unserviceable spares/parts/components, bearings bushes, cleaning of brass impeller or replacement of u/s impeller, greasing reassembling, bringing providing packing necessary nuts & bolts etc and reconnecting, recommissioning and testing for smooth functioning. (Notes:Cost of all the elements (material cost as well as labour cost) for making the pumps completely functional except the following shall be deemed to be included in the quoted rates:
3420 to 25 HP Capacity
3510 to 15HP Capacity
365.0 to 7.5 HP Capacity
372.0 to 3.5 HP Capacity
38M&L for repair/overhauling and including replacement of unserviceable spares of AC Plantcompressor reciprocatingtype model SMC 6-65 of ACCEL Make by dismantling complete assembly, after pumping down refrigerant R-22, checking of all spares and segregate of serviceable and unserviceable spares overhaulingthe compressor includingreplacement of unserviceable spares, alsoincluding machining of crank shaft bearing,polishing, replacing of gasketspacking,reassembling complete and rechargingof pumpeddown Refrigerant, also charging of additional refrigerant upto the required pressure & topping up if required to maintain the required standingcharged pressure of compressor oil and gas, testing for smooth functioning etc completeall as specified and directed Engr-in-Charge. Location :C.No.29/MAST,3rd Floor, behind CHF workshop (Note: Cost of all the elements (material cost as well as labour cost) for making the compressors completely functional except the following shall be deemed to be included in the quoted rates : (a) Supply only spares for compressor reciprocating type model SMC- 6-65, Make : ACCELincluded under item Nos 16.01 to 16.17 here-in-after. (b) Supply only additonal refrigerant required for recharging of pumped down refrigerant, if required and paid under relevent item here-in-after. (c) Supply only compressor oil for topping up, if required and paid under relevent item here-in-after.
39Crank shaft Cat Part No 20-F
40Piston Cat Part No 20-H
41Oilrings Cat Part No 20-H/1
42Shaft seal assembly Cat Part No 21
43Liner assembly Cat Part No 20-A To J
44Oil pump assembly Cat Part No 23
45Rockers arm Cat Part No 24
46Loader/unloader spring Cat Part No K-58
47Piston rings Cat Part No U-10
48Suction valve reeds Cat Part No 25-A To X
49Discharge valve reeds Cat Part No 17-B
50Oil filter Cat Part No 17-C
51Suction strainer Cat Part No 17-D
52Oil pressure regulating valve Cat Part No 20-F
53Connecting rod Cat Part No 18-A To F
54Gasket set Cat Part No 18-B
55Compressor safety valve Cat Part No 18-D
56M&L for repair/overhauling and including replacement of unserviceable spares of AC Plantcompressor reciprocatingtype model SMC 4-65 of ACCEL Make by dismantling complete assembly, after pumping down refrigerant R-22, checking of all spares and segregate of serviceable and unserviceable spares overhaulingthe compressor includingreplacement of unserviceable spares, alsoincluding machining of crank shaft bearing,polishing, replacing of gasketspacking,reassembling complete and rechargingof pumpeddown Refrigerant, also charging of additional refrigerant upto the required pressure & topping up if required to maintain the required standingcharged pressure of compressor oil and gas, testing for smooth functioning etc, completeall as specified and directed Engr-in-Charge. Location :C.No 70 (MMER ,2nd Floor/ C.No 36 MRAC Gr Floor (Note: Cost of all the elements (material cost as well as labour cost) for making the compressors completely functional except the following shall be deemed to be included in the quoted rates : (a) Supply only spares for compressor reciprocating type model SMC- 4-65, Make : ACCELincluded under item Nos 17.01 to 17.17 here-in-after. (b) Supply only additonal refrigerant required for recharging of pumped down refrigerant, if required and paid under relevent item here-in-after. (c) Supply only compressor oil for topping up, if required and paid under relevent item here-in-after.
57Crank shaft Cat Part No 20-F
58Piston Cat Part No 20-H
59Oilrings Cat Part No 20-H/1
60Shaft seal assembly Cat Part No 21
61Liner assembly Cat Part No 20-A To J
62Oil pump assembly Cat Part No 23
63Rockers arm Cat Part No 24
64Loader/unloader spring Cat Part No K-58
65Piston rings Cat Part No U-10
66Suction valve reeds Cat Part No 25-A To X
67Discharge valve reeds Cat Part No 17-B
68Oil filter Cat Part No 17-C
69Suction strainer Cat Part No 17-D
70Oil pressure regulating valve Cat Part No 20-F
71Connecting rod Cat Part No 18-A To F
72Gasket set Cat Part No 18-B
73Compressor safety valve Cat Part No 18-D
74M&L for repair/overhauling and including replacement of unserviceable spares of compressor reciprocatingtype model JS63FQ508Make YORK by dismantling complete assembly, after pumping down refrigerant R-22, checking of all spares and sagregate of serviceable and unserviceable spares overhaulingthe compressor includingreplacement of unserviceable spares, alsoincluding machining of crank shaft bearing,polishing, replacing of gasketspacking,reassembling complete and rechargingof pumpeddown Refrigerant, also charging of additional refrigerant upto the required pressure & topping up if required to maintain the required standingcharged pressure of compressor oil and gas, testing for smooth functioning etc, completeall as specified and directed by Engr-in-Charge. Location :C.No.51/WECORS, ARF bldg. (Note: Cost of all the elements (material cost as well as labour cost) for making the compressors completely functional except the following shall be deemed to be included in the quoted rates : (a) Supply only spares for compressor reciprocating type model JS63FQ508Make YORKincluded under item Nos 18.01 to 18.17 here-in-after. (b) Supply only additonal refrigerant required for recharging of pumped down refrigerant, if required and paid under relevent item here-in-after. (c) Supply only compressor oil for topping up, if required and paid under relevent item here-in-after.
75Crank shaft Cat Part No JS-647216
76Piston Cat Part No 6446538
77Piston rings Cat Part No 2915177000
78Main sealing bearing(Set of two) Cat Part No 2911097
79Liner assembly Cat Part No 6642166700
80Oil pump assembly Cat Part No 2635003000
81Loader/unloader spring Cat Part No 22913487
82Piston pin Cat Part No 22919841
83Suction valve reeds .Cat Part No 6421898
84Discharge valve reeds Cat Part No 2291324100
85Oil filter Cat Part No 364452700
86Connecting rod Cat Part No 364-49012000
87Gasket set Cat Part No 36447453000
88Compressor safety valve Cat No 6446538
89Returing Plate
90Compressor coil winding
91Mother board Circuit
92Labour only for repair/overhauling and including replacement of unserviceable spares of compressor reciprocatingtype model 5H120, CWORO2400MT Voltas Make by dismantling complete assembly, after pumping down refrigerant R-22, checking of all spares and segregate of serviceable and unserviceable spares overhaulingthe compressor includingreplacement of unserviceable spares, alsoincluding machining of crank shaft bearing,polishing, replacing of gasketspacking,reassembling complete and rechargingof pumpeddown Refrigerant, also charging of additional refrigerant upto the required pressure & topping up if required to maintain the required standingcharged pressure of compressor oil and gas, testing for smooth functioning etc, completeall as specified and directed Engr-in-Charge. Location:- C.NO.51/Wecors, Main bldg, East wing.(Note: Cost of all the elements (material cost as well as labour cost) for making the compressors completely functional except the following shall be deemed to be included in the quoted rates : (a) Supply only spares for compressor reciprocating type model 5H120, CWORO2400MT Voltas Make included under item Nos 19.01 to 19.19 here-in-after. (b) Supply only additonal refrigerant required for recharging of pumped down refrigerant, if required and paid under relevent item here-in-after. (c) Supply only compressor oil for topping up, if required and paid under relevent item here-in-after.
93Crank shaft Cat No 6301000
94Piston rings Cat No 6100022
95Piston Cat No 6100010
96Piston Pin Cat No 6100016
97Oil scraper rings Cat No 6100030
98Center bearing Cat No 5H-120
99Connecting rod Cat No 6101200
100Main sealing bearing(Set of two) Cat No 6100008
101Liner assembly Cat No 6101300
102Oil pump assembly Cat No 6303900
103Suction valve spring Cat No 6100068
104Capacity control valve Cat No 61202700
105Suction valve reeds Cat No 6100040
106Discharge valve reeds Cat No 6101302
107Oil filter Cat No 6300124
108Valve plate
109Gasket set Cat No 201408 make Neopene or equivalent as appoved by the GE
110Compressor safety valve Cat No 6302500
111Shaft seal assembly Cat No 6301500
112M&L for repair of leakage of system including pump down the existing refrigerant from the plant of 7.5 TR capacity and carrying out the leakage testing with feeding pressure of dry Nitrogen gas and monitoring for 24 hrs to assess/finding leakages, rectification of leakage by brazing & replacement of necessary gasketswherever required including replacement of Teflon sealing of all refrigerant line control valves like liquid lines valves/ suction valves/ discharge valves of compressors, gland packages of all angle valves, flaring of all connections framing welding etc complete, vaccumizing of the plant by vaccum pump and keep-it upto 24 hours for testing and rectification of leakages if any, finally recharging of existing refrigerant gas to the plant and add for topping up of refrigerant if required to maintain the standard pressure etc complete including testing of the plant for smooth functioning completeall as specified and directed Engr-in-Charge. Location : C.No.75/STH, 1st Floor, Main office,MCR,Lab room,C.No.48/MEPS SSK
113-ditto- all as per item No.20 but 80 TR Capacity, Location: C.No.51/wecors, ARF bldg.
114-ditto- all as per item No.20 but 40 TR Capacity,Location: C.No.51/wecors, Main Slog,Gr. Floor
115-ditto- all as per item No.20 but 12.5TR Capacity ,Location: C.No.85/wecors, Phase-IV, 1 floor.
116-ditto- all as per item No.20 but 30 TR Capacity,Location C.No.29/MAST, 3rd floor.
117-ditto- all as per item No.20 but 10 TR Capacity, Location C.No.36/MRAC, Gr.floor (Instrumantation bay).
118-ditto- all as per item No.20 but 18 TR Capacity,Location C.No.43/MECI Plant No.1, 2nd near auto control bay.floor (Instrumantation bay).
119-ditto- all as per item No.20 but 20 TR Capacity,Location C.No.43/MECI Plant No.2, 2nd near electric bay.floor (Instrumantation bay) andC.No.70 /MMER, 2nd Floor
120M & Lfor replacement of unserviceable Cooling Tower accessories i.e. Nozzles, water inlet/outlet pipe and filter, Fan blade, fan blade housing assembly, GI bolts, nuts, MS frame and ladder etc complete and refitting old PVC fills (serviceable qty shall be reused to the extent available) after cleaning with diluted HCL solution suitable for the existing cooling tower, servicing of fan and motor assembly including removal of dust, oil, scaling of motor body and replacing the unseviceable bearing, painting with anticorrosive paint& reassemblingcomplete cooling tower completeall as specified and directed Engr-in-Charge. Note : Extra PVC fills andPVC spray Nozzels as required to complete the job shall be measured and paid separately as "Supply only" to the extent required and cost of all the other elements to make the cooling towers completely functional shall be deemed to be included in the quoted rates.
121For 240 TR cooling tower Wacors
122For 80 TR cooling tower Location: C.No.51/wecors, ARF bldg.
123For 30 TR cooling towerLocation C.No.29/MAST, 3rd floor.
124For 18 TR cooling tower Location C.No.43/MECI Plant No.1, 2nd near auto control bay.floor
125For 20 TR cooling tower Location C.No.43/MECI Plant No.2, 2nd near electric bay.floor (Instrumentation bay).
126"Supply only" PVC fills of suitable size for existing cooling tower as mentioned in Srl item 22.01 to 22.05 completeall as specified and directed Engr-in-Charge.
127"Supply only" PVC spray Nozzels of suitable size for existing cooling tower as mentioned in srl item 22.01 to 22.05completeall as specified and directed Engr-in-Charge.
128Supply and fixing in repairs FRP induced draft rectangular counter flow type cooling tower capacity 50 TR with FRP basin with squirrel cage, vertical flange mounted extended thread type, induction motor with totally enclosed weather proof enclosure, connecting the inlet & outlet existing water pipe lines including PVC Fills, Eliminator, FRP Fan Deck, hardware etc complete on existing platform of following cpacity after removing old cooling tower as specified in OEM manual & completeall as specified and directed Engr-in-Charge. Locations : C.No.36 MRAC Gd Floor & C No- 70 MMER Ist FloorOF Advance Make, or equivalent
129Replacement of unserviceable MS pipe,heavy grade of following sizes(condenser water tubing fromthe cooling tower area) including provision of all fittings, welding and connected works as required for smooth functioning of AC Plants, completeall as specified and directed Engr-in-Charge. Make : TATA/JINDAL
130150mm bore
131100mm bore
13280 mm bore
13365 mm bore
134S&F in repair unserviceable sluice valves of following sizes flanged end, cast iron body, flanged and drilled and non rising type stainless steel spindle with hand wheel, T-head bolt & nut, long body, class PN 1.6, confirming to IS 14846 of 2000 for following sizes including all flange joint with rubber gasket or fiber board, bolts, nuts and washers complete including accessories etc completeall as specified and directed Engr-in-Charge.
13550 mm bore
13665 mm bore
13780 mm bore
138100 mm bore
139150 mm bore
140S&F in repair unserviceable cast iron body Y type strainer flanged ends to BS 10 Table F, flanged and perforated sheet screen of 3mm hole dia of guided in stainless steel body and cover including large screening area makes the strainer efficient in performance including minimum pressure drop inside body with stud & nut made out by carbon steel confirming to IS:210 Gr FG 200for following sizes including flange joint with rubber gasket or fiber board, bolts, nuts and washers including accessories etc completeall as specified and directed Engr-in-Charge, of following sizes .
14165 mm bore
14280 mm bore
143100 mm bore
144150 mm bore
145Supply and fix in repairs gun metal gate valve with iron wheel head screwed both ends for iron pipe including fittings i.e. union, socket etc completeall as specified and directed Engr-in-Charge of following sizes :-
14640 mm bore
14725 mm bore
14820 mm bore
149Supply and fix in repairs butterfly valve of IS:210 Gr.FG-200 Cast iron body without lugs, gear operated, CF8 SS-304 Disc, Nitrile/EPDM rubber lining with Testing Pressure PN-16 including all fittings accessories etc completeall as specified and directed Engr-in-Charge of following sizes :-
15050 mm bore
15165 mm bore
15280 mm bore
153100 mm bore
154150 mm bore
155Supply and Fixing steel water tubing, galvanised, Medium grade with all fittingssuch as nipple, union, socket, elbow, bends &,laid in trenches including taking down existing rusted pipes for the following sizes completeall as specified and directed Engr-in-Charge.
15625 mm bore
15740 mm bore
15850 mm bore
159M&L for painting of central AC Plants by applying one coat of synthetic enamel paint as per colour code with spray painting including electric panels , central AC plant compressors, electric motors, pumps, pipe lines etc by filling the cavities if any, with filler including preparation of surfaces & indicating markings under mentioned AC plant completeall as specified and directed Engr-in-Charge.
160AC Plant 2X240 TR Wecors
161AC Plant 3X175 TR Wecors
162AC Plant 3X135TR Wecors
163AC Plant 2X80TRWecors
164AC Plant 3X20TR MECL, C.No.43
165AC Plant 3X30TR MAST, C.No.29
166AC Plant 2X40TRMOUT, C.No.25
167AC Plant 2X18TRMECL, C.No.43
168AC Plant 2X30TR MMER C.No.70
169Supply in fixing in repairs sealed compressor 20 TR for 407(a) gas, including necessary conecting copper pipe brazing/welding work for suction line and discharge line including cabling work completeall as specified and directed Engr-in-Charge. Make : DANFOSS / COPELAND. Location : ARF Ventilation plant
170Supply in fixing in repairs sealed compressor 15 TR for 407(a) gas, including necessary connecting copper pipe brazing/welding work for suction line and discharge line including cabling work completeall as specified and directed Engr-in-Charge. Make : DANFOSS / COPELAND Loc C-32
171Supply in fixing in repairs sealed compressor 7.5TR for 407(a) gas, including necessary conecting copper pipe brazing/welding work for suction line and discharge line including cabling work completeall as specified and directed Engr-in-Charge. Make : DANFOSS / COPELAND. Loc C-75/Wecors/C-74
172Supply in fixing in repairs sealed compressor 5 TR for 407(a) gas, including necessary conecting copper pipe brazing/welding work for suction line and discharge line including cabling work completeall as specified and directed Engr-in-Charge. Make : DANFOSS / COPELAND. Location : DOM/C No- 32
173Supply & fix in repairsthermometer complete all as secified.
174Supply and fixing in repairs filter dryer core Make: DANFOSS/Sporlan
175Supply and fixing in repairs MKC-2 solenoid coil complete all as specified Make: DANFOSS/Sporlan
176Supply & fix in repair Water flow switch with necessary flare fittings
177Supply & fix in repair Moisture liquid indicators
178Supply & fix in repair Pressure gauge 0-300PSI
179Supply & fix in repair Pressure gauge 0-150PSI
180Supply and fix water pressure gauges of any size up to 0- 100 PSI/0-7Kg/cm² capacity including taking out unservicable water pressure gauge etc completeall as specified and directed Engr-in-Charge. Make- KI/ H-Guru/Fiebig/Omega/Adarsh
181Supply & fix in repair Water gauge syphon with control valve
182Supply & fix in repair LP/HP cutout switch sensor
183Supply & fix in repair V Belt of different sizes
184Supply & fix in repair Brass Angle Valve size 1/4"x3/8"
185Supply and fixing in repairs thermostatic expansion valve for 63 TR Model No : 63MVE-42-CP-100, Make: Sporlan
186-ditto- as per serial No.48.00 but for 65 TR,Model No MVE-42-CP-100, Make: Sprolan
187-ditto- as per serial No.48.00 but for 40 TR, Model No MVE-42-CP-100,Make: Sprolan
188-ditto- as per serial No.48.00 but for 30 TR Model No MVE-34-CP-100,Make: Sprolan
189-ditto- as per serial No.48.00 but for 7.5 TR,SVE - CP - 100, Make: Sprolan
190Taking down old unserviceable aluminium rectangular grill of any type and make and suuply and fix new air /return air of aluminium rectangular grills complete with wooden frame work made out of II nd class hard wood, volume control damper including gasketand connected accessories completeall as specified and directed Engr-in-Charge.
191S & F in repairs condensor coilfan motor with blade complete suitable for outer unit .
192Dismantling the leaking condenser from 80 TR capacity AC plant replacing with the new air cooled condenser of size 198cm x 112cm x4 row made out of copper tube and aluminium fines. Reconnecting the condenser including brazing/welding inlet and outlet connections. Leak test, pressure test with nitrogen. Vaccumizing & gas charging with F22 refrigerant & testing on load completeall as specified and directed Engr-in-Charge. Loc ARF
193Material and labour for framed work with structural steel sections including nuts, bolts,washers, welding ,bending cold or hot, drilling holes for bolts, in any shape or size as directed including applying two coats of synthetic enamel paint over a coat of red oxide zinc chrome primer completeall as specified and directed Engr-in-Charge.
194S & F in Repairs High velocity commercial air curtain unit for prevention of dust and conditioned air losses single phase 220 Volt 50 Hz made of MS / CRCA sheet of min thickness 18 gauge finished with two coats of red oxide primer and final coat of synthetic enamel paint (over baked) with MS based CRC 18 gauge sq perforated suction grills aluminum alloy fans and single phase electric motor nozzle etc with fittings and accessories so as to produce 1-1.5 M / Sec air velocity at floor level for for door opening 28" x 78"completeall as specified and directed Engr-in-Charge. Make:Technocraft or equivalent as approved
195Supply and fix in repairs blower set including drum and shaft along with anti-vibration spring isolators for minimizing vibrations (Blow/draw through type) as per the existing size and suitable for any CFM ofAHU unit completeall as specified and directed Engr-in-Charge.
196Suuply and fix in repairs volume control damper made out of galvanized ironor anodized aluminium with overlapping leafs to avoid any leakage from the damper as per existing at site completeall as specified and directed Engr-in-Charge.
197Suuply and fix in repairs leather type canvas inAHU ductof any size as per existing at site completeall as specified and directed Engr-in-Charge.
198Taking out old unserviceable AHU body & supply and fixing offactory fabricated double skin powder coated25 mmpuf insulated AHU body including proper door handles, corner supports cutting, bending, welding/ brazing/ wooden work/ structural supportcompleteall as specified and directed Engr-in-Charge.
199Supply and fix in repairs AHU cooling coil of any size and any rows as per existing at site completeall as specified and directed Engr-in-Charge.
200Supply and errect fabricated rectangular square duct made out of 24 gauge GI sheet in L shaped hollow profile including all accessories such as corner, carriage bolt hangers, gasket and seal thelongitudinal joints with and including approved sealant completeall as specified and directed Engr-in-Charge.
201M & L for duct insulation, Cleaning the surface of the duct to be insulated, painting the surface of the duct with aluminium paint andfixed tightly Nitrile rubber(Armaflex) 19/25mm thick with applying adhesive compound on the surface of duct sheet and sealed properly, cover with aluminum foil paper laminated completeall as specified and directed Engr-in-Charge.
202M & L for pipe insulation, cleaning the pipe surface with steel wire brush, apply one coat of zinc chromate paint and allowed to dry, apply two coats of cold setting adhesive compound on around surface of pipe, stick expanded Nitrile 50 mm thick or nitrile sheets tightly pressed, wrapped with one layer of aluminium cladding with 26 guage AL sheet suitable for covering the surface ofpipe line insulation for protection against the demage of PUF insulation slab complete for 250 mm pipe completeall as specified and directed Engr-in-Charge.
203Ditto-all as per item No 65.00 above but 200 mm dia.
204Ditto-all as per item No 65.00 above but 150 mm dia.
205Ditto-all as per item No 65.00 above but 125 mm dia.
206Ditto- all as per item No 65.00 above but 100 mm dia.
207Ditto-all as per item No 65.00 above but 80 mm dia.
208Ditto-all as per item No 65.00 above but 65 mm dia.
209Ditto-all as per item No 65.00 above but 50 mm dia.
210Ditto-all as per item No 65.00 above but 40 mm dia.
211Ditto- all as per item No 65.00 above but 32 mm dia.
212M & L for removing top and side cover panel of AHU for servicing and cleaning the cooling coil fins with nylon wire brush using chemical MAIC solution and fresh water including cleaning surfaces of the AHUs, repairing the base plate of AHU, Dampers, Blowers, blower drums including greasing of pedestal bearings, tightening of belts, blower motor electric connections, connection terminal and repairs of AHU inside insulations with fiber glass of 24kg/cum density insulation sheet and also cover with aluminium cladding of 0.71 mm thick fabricated with screws at edges, cross ribbed of insulated surface, painting the outer surface of AHU with aluminium paint of following location AC Plants completeall as specified and directed Engr-in-Charge.
213Ditto- all as per item No 66.00 above but AC Plant of 2x80 TR Capacity, C.No.51/Wecors, ARF bldg.
214Ditto- all as per item No 66.00 above but AC Plant of 2x40 TR Capacity, C.No.51/Wecors, Main Slog,Gr. Floor
215Ditto- all as per item No 66.00 above but AC Plant of 1 x 12.5TR Capacity , C.No.85/Wecors, Phase-IV, 1 floor.
216Ditto- all as per item No 66.00 above but AC Plant of 3x30 TR Capacity, C.No.29/MAST, 3rd floor.
217Ditto- all as per item No 66.00 above but AC Plant of 3x10 TR Capacity, C.No.36/MRAC, Gr.floor (Instrumantation bay).
218Ditto- all as per item No 66.00 above but AC Plant of 2x18 TR Capacity, C.No.43/MECI Plant No.1, 2nd near Auto Control Bay floor (Instrumantation Bay).
219Ditto- all as per item No 66.00 above but AC Plant of 3x20 TR Capacity, C.No.43/MECI Plant No.2, 2nd near Electric Bay floor (Instrumantation Bay).
220Supply only refrigerant R-22 gas as per requirement, completeall as specified and directed Engr-in-Charge. Make : MAFRON/FLORON/ REFRON/ FREON
221Supply only refrigerant R-407(a) gas as per requirement, completeall as specified and directed Engr-in-Charge. Make : MAFRON/FLORON/ REFRON/ FREON
222Supply only compressor oil and filling/charging in compressor as per requirement i.e. topping up, changing with fresh oil or new charging completeall as specified and directed Engr-in-Charge. Make : Servo, HP, BP, Sheetal MK-04GSLocation-YORK Plants
223Supply only compressor oil and filling/charging in compressor as per requirement i.e. topping up, changing with fresh oil or new charging completeall as specified and directed Engr-in-Charge. Make : Servo, HP, BP, Sheetal N-68, Freezol 36.
224Supply and fix in repairs AHU pre-filters 10 microns fabricated in size 630mm x 500mm x 50mm of AC Plant 240 Ton at C.No.51/ Wecors, 3rd Floor & 4th Floor, Main Bldg.
225Supply and fix in repairs AHU pre-filters 10 microns fabricated in size 610mm x 610mm x 50mm of AC Plants40 Ton , 2 x30 Ton , 2 cat C.No.51/ Wecors, 2nd Floor & 3rd Floor, Main Bldg.
226Supply and fix in repairs 3 phase electronic voltmeter class 1 . Make-L&T CAT No WL132010OOOO or equivalent as specified in Appendix B
227Supply and fix in repairs 3 phase electronic amperemeter, class 1 Make-L&T CAT No WL131010OOOO or equivalent as specified in Appendix B
228Supply and fix in repairs selector switch including connection of 3 phasefor amperemeter, voltmeter class 1
229Supply and fix in repairs Over Load Relay suitable for any capacity of starter electric panel
230Supply and fix in repairs Single phase preventer suitable for any capacity of electric starter panel
231Supply and fix in repairs electric motor starter electronic timer type ET100 range 9-30 sec
232Supply and fix in repairs 3 TF50 VDE - 06603 Phase volatage 380 V50 KA
233Supply and fix in repairs electric motor starter star delta starter contactor AC1, type ML-1.5 with auxillay contacts 2NO+2NC and coil volt 220V Make - L&T Cat No SS91851 or equivalent make as specified in Appendix B
234Supply and fix in repairs electric motor starter star delta starter contactor AC1, type ML-2 with auxillay contacts 2NO+2NC and coil volt 220V Make - L&T Cat No SS90701 or equivalent make as specified in Appendix B
235Supply and fix in repairs electric motor starter star delta starter contactor type ML-4 with auxillay contacts 2NO+2NC and coil volt 220V Make - L&T Cat No SS90910 or equivalent make as specified in Appendix B
236Supply and fix in repairs electric motor starter star delta starter contactor type ML-6 with auxillay contacts 2NO+2NC and coil volt 220V Make - L&T Cat No SS90921 or equivalent make as specified in Appendix B
237Supply and fix in repair replacement of unserviceable electric motor starter star delta starter contactor AC1 rating 25A, type ML- 12 with auxillay contacts 2NO+2NC and coil volt 220V Make - L&T Cat No SS91010
238Supply and fix in repairs MCCB 200 Amp 4 Pole 36kA, Thermal megnetic protection OL/SC, confirming to IS/IEC60947-2& IEC 60947-2 including spreader Terminal, internal and external accessories complete for AC Plant electric panel completeall as specified and directed Engr-in-Charge.
239Supply and fix in repairs MCCB 160 Amp 4 Pole 36kA, Thermal megnetic protection OL/SC, confirming to IS/IEC60947-2& IEC 60947-2 including spreader Terminal, internal and external accessories complete for AC Plant electric panel completeall as specified and directed Engr-in-Charge.
240Supply and fix in repairs MCCB 125 Amp 3 Pole, 25kA,Thermal megnetic protection OL/SC, confirming to IS/IEC60947-2& IEC 60947-2 including spreader Terminal, internal and external accessories complete for AC Plant electric panel completeall as specified and directed Engr-in-Charge.
241Supply and fix in repair replacement of unserviceable MCCB 100 Amp 4 Pole 25kA, Thermal megnetic protection OL/SC, confirming to IS/IEC60947-2& IEC 60947-2 including spreader Terminal, internal and external accessories complete for AC Plant electric panel completeall as specified and directed Engr-in-Charge.
242Supply and fix in repairs MCCB 63 Amp 16kA, 4 Pole hermal megnetic protection OL/SC, confirming to IS/IEC60947-2& IEC 60947-2 including spreader Terminal, internal and external accessories complete for AC Plant electric panel completeall as specified and directed Engr-in-Charge.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail