|
| 1 | Annual running, Preventive and Breakdown Maintenance of SIEMENS make PLC control system along with Gate Valves, Electrical Drives & all Control and Instrumentation system of ASH HANDLING SYSTEM Unit no 9, 10, 11, 12 & 13 of 5X200MW, BTPS ,Obra. |
| 2 | Replacement/New Erection of impulse line. |
| 3 | Replacement/New Erection of instrument fitting, adopter, nut & tails, Elbow connector etc. |
| 4 | Overhauling and servicing of B-501/B-601/ SS/ cock valve. |
| 5 | Overhauling/Repairing of Junction Boxes. |
| 6 | Overhauling/Servicing & recalibration/ New Erection of Fuji/Yokogava/ Rosemount/other make Transmitters. |
| 7 | Complete overhauling and Recalibration /New erection of digital Indicators. |
| 8 | Overhauling and Recalibration/ New Erection of Flow meter/ conductivity meter. |
| 9 | Complete overhauling/New Erection of level switches. |
| 10 | Replacement of Pressure switch/Gauge/ Vibration switch after dismantling from site, its testing, checking and calibration with termination of cable after proper dressing and clamping etc /New Erection of pressure switches/Gauge/vibration switch. |
| 11 | Removal of temp gauges/switches & thermocouple from site, its Erection and commissioning after their testing, calibration with termination of cable after proper dressing and clamping etc/Replacement//New Erectionof temp. gauges/switches & thermocouple. |
| 12 | Replacement/new erection/overhauling & cleaning of union & isolating valve/forged body valve. |
| 13 | Cleaning/blowing of tapping points of different pressure transmitters/Switches after opening it associated pipe line. |
| 14 | Fabrication/ Repairing of Instruments platform at Boiler 0 to 52 M of size 3.5ft X 4.5 ft /higher size. |
| 15 | Laying/ Patrolling of instrumentation cable of size 2C to 20 C X 0.5mm2 to 1.5 mm2 . |
| 16 | Servicing and maintenance of 3 Ton/1.5 ton Air conditioner of Unit No. 9,10, 11, 12 & 13. (One Job per month) |
| 17 | Cleaning of control room & PLC system of unit No. 9,10, 11, 12 & 13. (One Job per month) |
| 18 | Repairing/servicing of UPS and Float Battery charger installed in PLC system of Ash Handling System of Unit No.9,10 &11. (One job means once in a quarter) |
| 19 | Servicing/Replacement of faulty/damaged butterfly valves along with Actuator. |
| 20 | Servicing/Replacement of faulty/damaged Diaphragm type valve. |
| 21 | Changing spindle/Gland of root valves. |
| 22 | Cleaning & blowing of Impulse pipe lines by air from tapping point to instrument termination of different services/samples. |
| 23 | Attending of leakage from steam/Water/Air lines of different services. |
| 24 | Replacement of pressure gauges/temperature gauges/pressure switches/ temperature switches etc. |
| 25 | Servicing, testing & calibration of pressure gauges |
| 26 | Servicing, testing & calibration of pressure Switches. |
| 27 | Servicing, testing & calibration of temperature gauges. |
| 28 | Servicing, testing & calibration of temperature switches. |
| 29 | Replacement of thermocouples of different services. |
| 30 | Cleaning / Servicing of terminal blocks of different services in compressor house/SWAS system. |
| 31 | Changing of SS root valves. |
| 32 | Servicing of valves 10mm Size high pressure / Low pressure, manifold valves, 3 - way valves etc |
| 33 | Replacement of valves 10mm Size high pressure / Low pressure, manifold valves, 3 - way valves etc. |
| 34 | Removal of choking/replacement of impulse line as required. |
| 35 | Erection / Replacement of PVC armoured control / compensating cables. |
| 36 | Dismantling/Replacement/Remounting of Universal Digital indicators (Pressure/ Temperature/Dew point Indicator etc) as per site requirement. |
| 37 | Servicing/Replacement of faulty/damaged four-way valve with Rotex make Actuator 6\" (14 R1, 51400-6-2G) of Compressor. |
| 38 | Dismantling /Replacement/Remounting of +24Vdc SMPS in compressors as per site requirement. |
| 39 | Dismantling/Replacement/Remounting of Combination timer of Compressors as per site requirement. |
| 40 | Servicing of Sample Cooler DHx18 of SWAS and its re commissioning. |
| 41 | Servicing of Sample Cooler DHx12 of SWAS and its re commissioning. |
| 42 | Servicing of Sample Cooler DHx06 of SWAS and itsre commissioning. |
| 43 | Misc. Mechanical fabrication. |
| 44 | Maintenance, testing, calibration and transportations of actuators of butterfly valve. |
| 45 | Maintenance and upkeep of terminal box of actuator motors. |
| 46 | Maintenance, upkeep, dismantling and re-erection work of butterfly valve actuator motors. |
| 47 | Revisioning and Maintenance of MARP/DCS panels. |
| 48 | Revisioning, upkeep and testing of various types of switches of local control panels. |
| 49 | Maintenance, Revisioning, upkeep and Testing of 0.4KV power supply module. |
| 50 | Maintenance, upkeep and repair of junction box of CW pump butter fly valve. |
| 51 | Checking, cleaning and servicing of MOV Motor, Actuator, Limit Switch assembly, Terminal box etc. |
| 52 | Checking, cleaning cable dressing etc. of Interlock & Annunciation relay panel and modules of MOV Motor. |
| 53 | Overhauling, cleaning & Reconditioning of various size (200AH- 600AH) batteries (350V-360V DC) installed in UPS for 5X 200MW. |
| 54 | Load test Once in Six months for various size battery bank of UPS installed for 5X 200MW (01 Job/ battery bank) |
| 55 | Cleaning, reconditioning of Bus bars, tightness checking & replacement of damaged/burnt switches/ MCB’s etc along with other associated works involved in ACDB panels of each UPS system. |
| 56 | Cleaning & Painting of the wooden battery stands of UPS installed for 5X 200MW (01 Job/ battery bank). |
| 57 | The running maintenance of window type / Split type Air Conditioners (10 nos.) including attending all defects, repairing and servicing along with cost of all material, labour & T&Ps etc. required for proper M&R and smooth running. The work will also include changing of parts and accessories required for smooth running of air conditioners. |
| 58 | Gas Charging: - Work will include taking out Air Conditioners, cutting, gas charging, brazing and remounting of air conditioner, Refrigerant gas for charging shall be arranged by the contractor at his own cost. |
| 59 | Rewinding of burnt fan motor:- Work will include taking out Air Conditioners, dismantling burnt fan motor and installing the air conditioners. It will also include rewinding of burnt fan motor, replacement of petty spares like switches, relays, condensers etc. |
| 60 | Misc. Mechanical fabrication. |