Tender For Topographical Survey And Geo-Technical Investigation Works, damanjodi-Odisha

National Aluminium Company Limited-NALCO has published Tender For Topographical Survey And Geo-Technical Investigation Works. Submission Date for this Tender is 29-01-2024. Geotechnical Investigation Tenders in damanjodi Odisha. Bidders can get complete Tender details and download the document.




Tender Notice

41132961
Corrigendum : Tender For Topographical Survey And Geo-Technical Investigation Works
Open Tender
Indian
Odisha
damanjodi
29-01-2024

Tender Details

Topographical Survey And Geo-Technical Investigation Works Topographical Survey And Geotechnical Investigation Works For Red Mud Filtration Plant N Dry Mud Stacking, Damanjodi, Odisha

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 11-Jan-2024 PRE BID CLARIFICATION Other 22-01-2024
2 19-Jan-2024 CORRIGENDUM 2 FOR EXTENSION OF BID SUBMISSION AND OPENING DATE Date 29-01-2024

Key Value

Document Fees
Refer document
EMD
INR 60000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work:TOPOGRAPHICAL SURVEY AND GEOTECHNICAL INVESTGATION WORKS
Sl. No. Item Description
1ANNEXURE-1: TOPOGRAPHICAL SURVEY WORK
2Traverse and topographic survey within the survey limit as shown in the tender drawing no “TCE.13309A-CV-3000-SI-30001” or as directed at site, including taking spot levels at 25 m or at closer intervals as necessary, plotting contours at 0.25m intervals, setting up of base zero and grid lines, survey of on/overground features, roads, railway tracks, drains, overhead pipelines, power lines etc., complete in all respects, as specified and as directed
3Setting out, construction and levelling benchmark/grid pillars as shown in the tender drawing or as indicated at site, complete in all respects.
4Submission of three (3) prints of each sheet of final survey drawings as specified,together with two soft copies in separate CDs.
5ANNEXURE-2: GEOTECHNICAL INVESTIGATION
6MOBILISATION
7Mobilization of hydraulic boring and drilling rig with suitable casing up to desired depth, other in-situ test equipment, personnel etc. for carrying out investigations on land and demobilization on completion of work and removal from site.
8FIELD INVESTIGATION
9Setting up of boring rig at each borehole location including moving between borehole positions, locating, and marking the location on the ground by actual survey (by using precision position instruments such as GPS and Total Station), setting up all field test equipment and bringing all personnel to the location, making area good for setting up rig etc. complete all as per the IS Specification and as directed by Engineer. Any criss-cross or back and forth movement of the rig can take place. No additional compensation will be paid for such movements. The break-ups for 40 Nos Boreholes of 20m and 15m depths (Total 650 RM)are given below:
10Boring vertically through all kinds of soils, weathered rock, and soft rock with suitable and adequate equipment of diameter 150mm or 200mm, for depths as measured below existing ground level at rig location etc. all as per the IS Specification and as directed by Engineer:
110-10mThis shall include collection of disturbed samples at every change in stratum and preserving the same in airtight container with proper labelling for conducting required laboratory tests.
1210-20m This shall include collection of disturbed samples at every change in stratum and preserving the same in airtight container with proper labelling for conducting required laboratory tests.
13Drilling vertically through boulders and hard rock strata using NX size diamond bit, usingtriple tube core barrel with suitable core catcher, including collection and logging of cores, placing them in wooden core boxes in a proper sequence, numbering each core etc. all as per IS Specifications for the following depths measured from existing ground level. Item includes all the handling charges and dispatching of the core’s boxes/ samples to store/ laboratory etc. all as per the IS Specification and as directed by engineer in charge. Note: Experienced geologist shall supervise the core logging and shall also describe the rock in their fresh condition with presence of discontinuity, fracture etc.
140-10m
1510 - 20m
16Obtaining 100 mm diameter 450 mm long undisturbed soil samples at every 3m interval up to 10 m depth or at change of strata alternate to SPT from boreholes and sealing and labelling the container. In case of UDS sample could not be extracted for a depth that shall be replaced with SPT for the respective depth as per drawing, IS specification and as directed by Engineer.
17Conducting Standard Penetration Tests (SPT) in soil, soft and weathered rock at 3m intervals or at every change of strata alternate to undisturbed sampling and collecting the disturbed sample. Packaging and labelling the disturbed soil as per drawing, IS specification and as directed by Engineer.
18Conducting Field Permeability Tests (FPT) in borehole at specified depth as per layer encountered during progress or as per drawing, IS specification and as directed by Engineer.
19Collecting ground water samples from boreholes at specified depth including all provision of sampling, packing, sealing, and labelling as specified and including handling charges etc. all as per the IS Specification and as directed by Engineer. Water samples shall be collected in a five-litre polythene or glass container and shall be labelled, preserved, and sent to the laboratory for chemical analysis.
20Conducting Field California Bearing Ratio (CBR) test as per specified depth or at a depth of 500mm below natural ground level at soaked condition all as per the specification and as directed by Engineer.
21Excavating 3.0m x 3.0m x 3 to 4m deep trial pits at the locations specified by the Engineer in charge including visual inspection for description of the strata encountered and backfilling the trial pits to make the area clear after inspection and collecting soil and water samples at 0.5-1m intervals for analysis, including mobilisation of all the necessary equipments, excavation and inspection for soil classification including providing necessary shoring, side-slopes etc complete. Collecting site photographs (at least two nos. for each pit from different direction) of the strata encounter and enclosing the same with the report etc., carrying out field density test, all as per the specification and as directed by Engineer.
22Conducting Eletrical Resistivity Tests (ERT) by Wenner’s four electrode method as per IS 3043. The tests at each location shall be conducted as a series of tests with the distances between the electrodes as 1.5m, 3m and 6m each on either side along each row axis etc. all as per the specification and as directed by Engineer. Note: Test shall be considered completed and shall be count as one number only if it is conducted in all 8 directions
23Supply and installation of Standpipe inside the bore hole after field testing and sample collection up to desired depth. The installation is inclusive of all filter materials, screen pipes, geotextiles cover, fixed capping arrangement at top etc as per drawing or as directed by Engineer.No bentonite/ polymeric drilling fluid shall be used for stabilization of borehole walls. The temporary casing pipe shall be used up to end of borehole and withdrawn during standpipe installation after the filling of filter material as per drawing or as directed by the Engineer. The PVC-U standpipe for casing and screen shall be in accordance with IS 12818 and as per availability of diameter from manufacturer.
24Conducting Down-Hole Seismic Test (DHST) including the borehole preparation, equipment (Geophones, Seismic Source, cables, connectors etc), manpower, geophysical expert, data processing, interpretation and reporting, at specified depths for the identified boreholes or as directed by Engineer in accordance with ASTM D7400.
25LABORATORY TESTS Note: The numbers of laboratory test may be revised based on the actual site sampling after the completion of borehole.
26Grain size analysis:
27Hydrometer analysis
28Sieve analysis
29Liquid limit, plastic limit, plasticity index.shrinkage limit and shrinkage ratio.
30Laboratory CBR test
31Field density and moisture content.
32Proctor Density (MDD & OMC)
33Standard
34Modified
35Specific gravity of soil.
36Free swell index measurement
37Swelling pressure test
38Laboratory permeability test
39Unconfined compressive strength test on undisturbed soil samples or soil samples compacted to specified density.
40Direct Shear test on soil samples compacted to specified density.
41Tri-axial Compressive Strength test on undisturbed soil samples or soil samples compacted to specified density:
42Unconsolidated undrained test.
43Consolidated undrained test.
44Consolidated drained test.
45Consolidation test on undisturbed soil samples or on soil samples compacted to specified density, giving full test results including unit weights, specific gravity, e-log p curve, virgin curve, p0, e0, Cc, Cv and mv for all pressure increments, etc.(Tests without presentation of these results will not be paid for.)
46Full chemical analysis of undisturbed soil samples or disturbed SPT soil samplesincluding sulphates as SO3, chlorides and pH.
47Full chemical analysis of ground water including colour, odour, pH value, sulphates, chlorides, carbonates, nitrates, and organic matter, etc.
48Specific gravity of rock sample
49Unit weight of rock sample
50Water absorption & porosity of rock samples.
51Point Load Index Test on core samples
52Unconfined compression strength of rock core:
53Without saturation
54With at least 7 days saturation
55PREPARATION OF REPORT
56Preparation and submission of Soft Copies & Hard copies Draft & Finalreport of geotechnical investigations, interpretation, ground improvement and foundation recommendations for both shallow and deep foundation NOTE: The final report in soft copies in pdf / word format shall be submitted along with hard copies.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail