Bharat Heavy Electricals Limited-BHEL has published Tender For Construction Of Bed Plate Foundation In Bay-1 Block-3 And Other Related Works In Heep. Submission Date for this Tender is 29-12-2023. Foundation Work Tenders in haridwar Uttarakhand. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 26-Dec-2023 | Date extension | Date | 29-12-2023 |
Sl. No. | Item Description |
1 | Carriage of materials by mechanical transport including loading, unloading and stacking: Lime, moorum, building rubbish, earth, manure or sludge and excavated rocks:: Lime, moorum, building rubbish:2 km Unit:cum |
2 | Carriage of materials by mechanical transport including loading, unloading and stacking: Lime, moorum, building rubbish, earth, manure or sludge and excavated rocks:: Earth:2 km Unit:cum |
3 | Earth work in excavation over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m; disposed earth to be levelled and neatly dressed:All kinds of soil Unit:cum |
4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth: consolidating each deposited layer by ramming and:watering, lead up to 50 m and lift upto 1.5 m Unit:cum |
5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) Unit:cum |
6 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level:1:1.5:3 (1 Cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) Unit:cum |
7 | Centring and shuttering including strutting, propping etc. and removal of form for:removal of form for: :Foundations, footings, bases of columns etc. for mass concrete. Unit:sqm |
8 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . :Thermo-Mechanically Treated bars. Unit:kilogram |
9 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in ::Cement mortar 1:6 (1 cement : 6 fine sand) Unit:cum |
10 | 15 mm cement plaster on rough side of single or half brick wall of mix : :1:4 (1 cement : 4 coarse sand) Unit:sqm |
11 | Demolishing : R.C.C. work including stacking: of steel" bars and disposal of unserviceable "material within 50 metres lead: Unit:cum |
12 | Supplying and stacking of graded stone aggregate at site of size range :63 mm to 45 mm Unit:cum |
13 | Laying water bound macadam with specified stone aggregate stone screening and blinding material including screening, sorting, spreading to template and consolidation with power road roller of 8 to 10 tonne capacity etc. complete (payment for stone aggregate, screenings, kankar, moorum and red bajri etc. to be made separately) ::Base course with 63mm to 45mm size including stone screening 13.2mm size Unit:cum |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail