Power Development Department has published Tender For Survey,Supply, Transportation, Carriage, Erection,Testing And Commissioning For Creation Of 100 Kva Sub Station Alongwith Erection Of 11 Kv Line On 9 Mtr. Longst Poles, 30Mm Sqacsrweasel Conductor & Lt Line On 8 Mtr. St Poleat Wss Ladda Under J. Submission Date for this Tender is 27-01-2024. Electrification Work Tenders in jammu Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 06-Jan-2024 | Date Extension Notice I | Date | 12-01-2024 |
2 | 12-Jan-2024 | Date Extension Notice II | Date | 19-01-2024 |
3 | 20-Jan-2024 | Date Extension Notice III | Date | 27-01-2024 |
Sl. No. | Item Description |
1 | Survey, Supply, Transportation, Carriage, Erection,Testing and Commissioning for Erection of 11 KV line on 9 mtr. long ST poles, 30mm² ACSR Conductor at WSS Ladda (Stage First). |
2 | 9 mtr. Long ST Pole (ST-410 SP-33) |
3 | GI V Cross -arm with top Bracket including clamps |
4 | GI Channel X-arm including clamps and Angle for braces |
5 | 30mm² ACSR Weasel Conductor |
6 | 11 KV GO AB Switch 3 phase, 3 pole, 200 Amp, vertical |
7 | PG Clamps |
8 | 11 KV Polymer composite Pin Insulator 12 KV, 5 KN, lighting impulse 75 KV Positive and 80 KV Negative, Creepage distance 320mm. |
9 | 11 KV Polymeric Composite Disc insulator 12 KV, min failing load 45 kn, lightening impulse 75KVPositive and 80 KV Negative, creepage distance 320mm with fitting |
10 | Galvanized Nuts and Bolts |
11 | Danger Plates with Clamps |
12 | Anti climbing device with clamps |
13 | Earthing complete byGI Rod 20 mm, 2.5 mtr long through G.I. Strip 25X3 mm |
14 | Painting of 9 mtr ST poles with two coats of Aluminiumpaint. |
15 | Cement bottoming 1:2:4 mix as per REC standard 0.5 cum per pole |
16 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
17 | Survey, Supply, Transportation, Carriage, Erection,Testing and Commissioning for Installation of 100 KVA Substation at WSS Ladda(Stage-First) |
18 | 11/0.433 KV, 3-phase distribution Transformer 100 KVA with Bimetallic Terminal Connectors Energy Level-2 AluminiumWound, & with LV Cable box having detachable Aluminium Gland plate |
19 | Gapless surge Arrestor, 9 kv, 10 KA , LA with polymer housing stn. Type |
20 | 11 KV GO AB Switch 3 phase, 3 pole, 200 Amp, vertical |
21 | 11 KV Horn gap fuse set 3 phase 200 A |
22 | 185mm² 1.1 KV Grade, PVC insulated stranded conductor FRLS Type |
23 | 9 mtr. Long ST pole (ST-410 SP-33) |
24 | 11 KV Polymeric Composite Disc insulator 12 KV, min failing load 45 kn, lightening impulse 75Positive and 80 KV Negative, creepage distance 320mm with fitting |
25 | GI Channel /Angle/flat of sizes including clamps |
26 | Galvanized Nuts and Bolts. |
27 | Earthing of sub stn. Excavation of earth pit of dia 650mm & depth 3000mm installation of earthing pipe of 40mm Nominal bore & 4mm wall thickness & length 2.5 mtr. Long as per IS 1239. G.I Strip for neutral earthing of size 25mmx3mmfor connection of transforemr body, GO Set & lightening arrestor as per IS 2629/85, GI Nuts & bolts refilled with earth enhancement materials and earth chamber with RCC Slab cover |
28 | 11 KV Poloymer composite pin insulator, 12 KV, 5KN Lightening impulse 75 KV Positve and 80 KV Negative, creepage distance 320mm |
29 | LT distribution box for 100 KVA DTR with MCCB for incomer and SFU"s for outgoing circuits |
30 | Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete |
31 | PG Clamps |
32 | Danger Plates with Clamps |
33 | GI Barbed wire for Anticlimbing |
34 | 3-phase 4-wire Prodigy meter with box |
35 | Cement bottoming 1:2:4 mix as per REC standard 0.5 cum per pole |
36 | Painting of ST poles 9 mtr. Long with 2 coat of Al. paint |
37 | Survey,supply, Transportation, Carriage, Erection,Testing and Commissioning for Erection of 3 Phase 4 Wire LT line on 8 mtr. ST poles at WSS Ladda (Stage First). |
38 | 8 mtr. Long ST poles (ST-410 SP15) |
39 | GI M Clamps for shackle insulator |
40 | 30mm²ACSR Weasel Conductor |
41 | Shackle insulator |
42 | Galvanized Nuts and Bolts. |
43 | Danger Plates with Clamps |
44 | Anti climbing device with clamps |
45 | Earthing complete byGI Rod 20mm 2.5 mtr. Long through GI Strip |
46 | Painting of 8 mtr ST poles with two coat of Aluminium Paint |
47 | Cement bottoming 1:2:4 mix as per REC standard 0.5 cum per pole |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy