| 1 | ACCDAS servers |
| 2 | External RAID Mass storage device (for 24 months online backup) |
| 3 | SAN Switch |
| 4 | Layer III switch |
| 5 | Router one each for interfacing IT system & network |
| 6 | Firewall |
| 7 | IPS |
| 8 | Virtualization |
| 9 | Workstation TFT Monitors along with UPS, table, Chair and software |
| 10 | GPS Time synchronization system |
| 11 | Any other item to meet specification requirements |
| 12 | ACCDAS software |
| 13 | Analytical Software & Tools |
| 14 | Any other item to meet specification requirements |
| 15 | Workstation TFT Monitors along with UPS, table, Chair and software |
| 16 | Router |
| 17 | Switch |
| 18 | Rack for router, switch |
| 19 | Any other item to meet specification requirements |
| 20 | FRTU Database Configuration & Maintenance Software tool, Master Station cum FRTU Simulator & Protocol analyser software tool, Laptop PC for above software tools along with interfacing hardware including Hub |
| 21 | FRTU comprising panels, racks, sub racks, Power supply modules, min 02 card 32-Digital Input module, min 01 card 16-Digital Output module, MCU card, DCAI Card & support all standard protocol IEC (i.e. 103, 61850, 104, Modbus), necessary cables/connectors for successful commissioning with the panels & panel having min. 08 slot for cards and 50% additional space for modules |
| 22 | Modem (5G fallback to 4G/NB-IoT) Dual SIM (Active/Active) |
| 23 | Display MFT front side mounting |
| 24 | Heavy duty relays for CB Trip/close |
| 25 | 11 KV PT |
| 26 | 33 KV PT |
| 27 | 11 KV AB Switch Porcelain 400 Amp with Complete accessories. |
| 28 | 33 KV AB Switch Porcelain 400 Amp with Complete accessories. |
| 29 | 11KV PT Mouning Channel bracket Set |
| 30 | 33KV PT Mouning Channel bracket Set |
| 31 | 11 KV CT |
| 32 | 33 KV CT |
| 33 | Copper Control Cable 4 Core. 2.5 Sq.mm. |
| 34 | Copper Control Cable 2 Core. 2.5 Sq.mm. |
| 35 | Marshaling box with 10 no. connectors |
| 36 | G.I. STRIP 25X3 MM |
| 37 | TTB (Test Terminal Block) 16 Channel |
| 38 | Communicable Winding Temp. Indicator (WTI) |
| 39 | Communicable Oil Temp. Indicator (OTI) |
| 40 | MARSHALLING BOX with 14 No. link Connectors having space to house WTI & OTI along with mounting channel |
| 41 | CMR |
| 42 | Flexible Control Cable 8 Core. 1.5 Sq.mm. |
| 43 | Flexible Control Cable 1 X 1.5 sq.mm each RYB (MFT+ SCADA wiring) |
| 44 | Flexible Control Cable 2 X 0.5 sq.mm |
| 45 | Spring Charge Motor |
| 46 | Limit switch |
| 47 | Auxiliary switch for VCB |
| 48 | TNC Switch |
| 49 | AC DC MCB 16 Amp |
| 50 | Misc. (Clamp, connector, mounting, lugs, glands etc) |
| 51 | Earthing of FRTU (Hard Rock @37% of total count/Black Cotton @63% of total count) |
| 52 | Any other hardware to meet functional/performance requirement of MTS |
| 53 | DC Power Supply (DCPS) system based on SMPS along with 30V DC to 24V DC |
| 54 | Battery bank for above DCPS (VRLA Type) for minimum 8 hrs backup |
| 55 | AC DC Auxiliary supply having suitable MCB, Indicator and backlight fuse |
| 56 | 5G/4G GPRS charges for 5 Years |
| 57 | 40 MBPS Bandwidth charges for Data center for 5 Years |
| 58 | Circle Control Room Link 4 MBPS charges for 5 Years |
| 59 | Training - Operator\"s Training |
| 60 | Training - Maintenance Training |
| 61 | Repair and replacement of VCB equipment’s for 5 years - Spring Charge motor |
| 62 | Repair and replacement of VCB equipment’s for 5 years - Limit Switch |
| 63 | Repair and replacement of VCB equipment’s for 5 years - Auxiliary Switch |
| 64 | Repair and replacement of VCB equipment’s for 5 years - TNC Switch |
| 65 | Repair and replacement of VCB equipment’s for 5 years - AC DC MCB 16 Amp |
| 66 | Operation/FMS charges for ACCDAS systemfor 5 years for Maintaining overall system availability as per TS |
| 67 | Operation/FMS for charges ACCDAS System for 5 years for Maintaining availability of hardware & software applications functions as per TS |