National Highways and Infrastructure Development Corporation Limited-NHIDCL has published Tender For Consultancy Services As Ae For Supervision Of Construction Of Twin Tube Uni-Directional Aizawl Bypass Tunnel Of 2.5 Km And Its Approaches Of 2.1 Km From Km 10.600 To Km 15.200 (P-2) On Sairang - Phaibawk Section Of Nh-6 In The Mizoram. Submission Date for this Tender is 06-03-2024. Consultancy Service Tenders in Aizawl Mizoram. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 17-Jan-2024 | Amendment | Date | 29-01-2024 |
2 | 19-Jan-2024 | AmendmentNo01 | Technical Bid | 13-02-2024 |
3 | 19-Jan-2024 | Repliestoprebidqueries | Other | 13-02-2024 |
4 | 19-Jan-2024 | AmendmentNo1 | Date | 13-02-2024 |
5 | 19-Jan-2024 | Modified BOQ | BOQ | 13-02-2024 |
6 | 09-Feb-2024 | AmndNo2 | Technical Bid | 28-02-2024 |
7 | 09-Feb-2024 | Date extension | Date | 28-02-2024 |
8 | 27-Feb-2024 | Amnd3 | Date | 06-03-2024 |
Sl. No. | Item Description |
1 | A. KEY PROFESSIONALS |
2 | Team Leader Cum SeniorTunnel Expert (1 No) |
3 | Resident Engineer cum Tunnel Excavation Expert (1 No) |
4 | Tunnel Design Engineer (1 No) |
5 | Bridge/Structural Engineer |
6 | Tunnel Safety Expert (1 No) |
7 | Senior Geotechnical Expert (1 No) |
8 | Senior Geologist (1 No) |
9 | Senior Quality cum Material Expert (1 No) |
10 | Senior Contract specialist (1 No) |
11 | B. SUB PROFESSIONALS |
12 | Tunnel ventilation Cum E&M Expert |
13 | Assistant Bridge/Structural Engineer (1Nos. during construction and 1 nos during DLP) |
14 | Instrumentation & Control Expert (SCADA) |
15 | Tunnel Engineer (2Nos. during construction and 1 nos during DLP) |
16 | Tunnel Excavation Expert (1Nos. during construction and 1 nos during DLP) |
17 | Tunnel Lining (2Nos. during construction and 2 nos during DLP) |
18 | Geologist (1Nos. during construction and 1 nos during DLP) |
19 | Quantity Surveyor (2 Nos. during construction and 1 nos during DLP) |
20 | Assistant Highway Engineer (1 no during Construction and DLP) |
21 | Assistant Quality cum material Engineer (1 Nos. During construction and 1 nos during DLP) |
22 | Safety Engineer (2Nos. during construction and 1 nos. during DLP) |
23 | Environmental Engineer |
24 | Survey Engineer (2Nos. during construction and 1 nos. during DLP) |
25 | CAD Expert (1Nos. during construction and 1 nos. during DLP) |
26 | Lab Technician (1Nos. during construction and 1 nos. during DLP) |
27 | Office Rent ( During construction and DLP) |
28 | Support Staff (inclusive of per diem allowance) |
29 | Office Manager (1 No) |
30 | Accountant Cum Cashier (1 No) |
31 | Steno cumComputer operator (1 No) |
32 | Office Boy (1 No) |
33 | Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run |
34 | Scorpio or equivalent 4x4 vehicle(not more than 2 years old) (2nos during Construction Period and 1 nos during Maintenance Period.) |
35 | Bolero or equivalent 4x4 vehicle(not more than 2 years old)(3 nos during Construction Period and 2 nos during Maintenance Period.) |
36 | Duty Travel to Site (Fixed Costs) (For all Lengths of projects) : Professional and Sub-Professional Staff. The employer may require the Key Personnel to visit the Employer’s HQ office or any other office as per direction. The quoted amount should include travel fare for 80 round trip per key personnel to Employer’s Head Office for two working days(including Air fare, Food, Boarding & Lodging charges, TA/DA, Taxi, etc. Complete). |
37 | All Trips |
38 | Office Supplies, Utilities and Communication (Fixed Costs):Office Supplies, Drafting Supplies, Computor Running Costs, Domestic and International Communication including Internet connection |
39 | During Construction Period |
40 | During Maintenance Period |
41 | Office Furniture and Equipment (Rental) : The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input), PCs (8 No., Intel Core i3, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows 8/10, pre-loaded anti-virus etc.), laser/colour printers (3 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc.), Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc |
42 | During Construction Period |
43 | During Maintenance Period |
44 | Reports and Document (Fixed costs) |
45 | Monthly Report |
46 | Half yearly Reports |
47 | Various other reports as provided in the Concession Agreement such as Completion Report |
48 | Cost towards Road Survey Equipment (Network Survey Vehicle/Falling Weight Deflectometer/Mobile Bridge Inspection Unit/Retro Reflectometer) including all required manpower, software & report processing etc. |
49 | Surface defects detection and roughness measurement using Network Survey Vehicle (12.85 kms x 8 times) |
50 | Pavement strength measurement using FWD (12.85 kms x 4 times) |
51 | Bridge inspection using Mobile Bridge Inspection Unit (12.85kms x 8 times) |
52 | Road signs inspection using Retro Reflectometer (12.85 kms x 8 times) |
53 | Contigencies A fixed amount of Indian Rupees Ten Lakh (Rs 10,00,000/-) shall be included in the Financial Proposal |
54 | Grand Total |