| 1 | Decentralized Material |
| 2 | DEAD END CLAMP WITH I HOOK ABCABLE PCC |
| 3 | STAY CLAMP WITH N&B PCC POLE 8.5MTR |
| 4 | SUSPENSION CLAMP WITH EYE HOOK |
| 5 | MS HALF CLAMP FOR PCC- MS35X5mm,LT,N&B |
| 6 | MS CLAMP PCC WITH N/B FOR SUSP.CLAMP |
| 7 | SHEAR HEAD TYPE IPC 125-25 sq mm |
| 8 | LT BARE N. CONNECTOR PG CLAMP |
| 9 | IPC for 120sq. mm to120 sq mm |
| 10 | MS Clamp withN&B for PCC DeadEnd Clamp |
| 11 | LT Bare N Con.PG Clamp For L-L 95-95sqmm |
| 12 | MS FLAT 35X5MM SET FOR DIST BOX WITH N&B |
| 13 | LT DISTRUBITON BOX 3 PHASE |
| 14 | AL.CRIMPING TYPE LUGS 120 SQ.mm |
| 15 | Aluminium Lugs 0 type 25 mm (4x25) |
| 16 | Labour Charges for laying of Arial Bunch Cable |
| 17 | Cartage of PCC Pole from Store Center Haldwani/Rudrapur to Work Site With Stacking Site in 1Km Distance, Including Loading & Unloading (Distance 5 Km to 80 Km) |
| 18 | Cartage of Small Line Material from Store Center Kashipur/ Haldwani/Rudrapur to Work Site Incliding, Loading & Unloading ( Distance 5 Km to 80 Km) |
| 19 | HEADLOAD CARTAGEPCC POLE(0-1 KM) |
| 20 | HEADLOAD CARTAGE OF MATERIAL(0-1 KM) |
| 21 | Errection of Earthing of support with M.S. Earth rod of 2.5 meter long by hammering of M.S. Rod to proper depth and connecting G.I. wire as per construction manual & Head of the earth rod should be 30cm below the ground level. |
| 22 | Errection of Stay with Fixing , tightening and nozzaling of Stay with pole and stay rod on required tension as per drawing / RESSPO manual. |
| 23 | Grouting of Stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including costof Cemaent,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO Manual. |
| 24 | Erection of PCC Single support pole in proper level and alignment alongwith fixing of all accessories, like top channel,X-bracing & clampsas per RESSPO construction Manual. |
| 25 | Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 (1 cement :4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement,sand andstone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO construction Manual. |
| 26 | DISMANTLING OF LT LINE 1 P 2 W(WEASEL) |
| 27 | DISMANTLING OF LT LINE 2 P 3 W(WEASEL) |
| 28 | DISMANTLING OF LT LINE 3 P 4 W(WEASEL) |
| 29 | DISCONNECTION & RECONNECTIONOF CONsumer |
| 30 | DISMANTLING AND REFIXING OF DIST. BOX |
| 31 | LAYING OF LT PVC CABLES(> 150 SQMM) |
| 32 | LOPPING & CHOPPINGOF TREE BRANCHES |
| 33 | LAYING OF AB CABLE OF SIZE 120 SQMM (LT XLPE AB CABLE 3X120+1X95 SQ.mm.) |