}

Tender For Fixing Aluminium Partition For Covering Up The Records Of Pension Cell For A.C. Installation At Ground Floor Of C.M.O. Buildings., Kolkata-West Bengal

Kolkata Municipal Corporation-KMC has published Tender For Fixing Aluminium Partition For Covering Up The Records Of Pension Cell For A.C. Installation At Ground Floor Of C.M.O. Buildings.. Submission Date for this Tender is 25-12-2023. Aluminium Furniture Tenders in Kolkata West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

41057752
Tender For Fixing Aluminium Partition For Covering Up The Records Of Pension Cell For A.C. Installation At Ground Floor Of C.M.O. Buildings.
Open Tender
Indian
West Bengal
Kolkata
25-12-2023

Tender Details

Fixing Aluminium Partition For Covering Up The Records Of Pension Cell For A.C. Installation At Ground Floor Of C.M.O. Buildings.

Key Value

Document Fees
Refer document
EMD
INR 2800.0 /-
Tender Value
Refer document

BOQ Items

Name of Work:FIXING ALUMINIUM PARTITION FOR COVERING UP THE RECORDS OF PENSION CELL FOR A.C. INSTALLATION AT GROUND FLOOR OF C.M.O. BUILDINGS.
Sl. No. Item Description
1BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 10. Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed.
2BUILDING WORKS ( C ) Brickworks,Concrete Works etc..C. REPAIR AND REHABILITATION WORKS?(a) Applying 2 coats of bonding agent with synthetic multi functional rubber emulsion having adhesive and water proofing properties by mixing with water in proportion (1 bonding agent : 4 water : 6 cement) as per Manufacturer"s specification [Cement to be supplied by the Department]
3SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster
4SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (c) 10 mm thick plaster
5BUILDING WORKS (K) PAINTING, VERNISHING ETC?(B)MISCELLANEOUS ITEMS.(5)(b) Rendering the surface of walls and ceiling with white cement based wall putty of approved make and brand(1.5mm thick)
6BUILDING WORKS (K) PAINTING, VERNISHING ETC?(B)MISCELLANEOUS ITEMS.(1)Removing loose scales, blisters etc. from old painted surface and thoroughly smoothening the surface to make the same suitable for receiving fresh coat of paint.N.B:(Payment against item (1, 2, 3, 4) of subhead B will be made only when done at specific direction of the Engineer- in-charge. Cost of taking out shutter etc.for this item and rehanging the same or changing glass panes cracked or broken in the operation will be deemed to be covered by the rate of this item and no seperate payment therefore shall be made.)
7BUILDING WORKS (G) WOOD AND PVC WORKS G. WALL PANELLING 3. Supplying, fitting and fixing boiling water resistant ply conforming to IS: 303-1989 bonded with phenol formaldehyde synthetic resin of approved make and brand fitted and fixed as per design as per approval and direction of Engineer-in- Charge.[excluding the cost of supporting frame work and teak wood batten/Lipping] In Ground Floor (ii) 6mm .(Note: For Boiling Water Resistant Block Boards reduce the above rates by 5%). For upper floor refer Item H (4) for item 1, 2, 3, 4 under subhead G
8SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 10 Acrylic Distemper to interior wall, ceiling with a coat of solvent based interior grade acrylic primer (as per manufacturer"s specification) including cleaning and smoothning of surface. Two Coats
9SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)
10SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)
11SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS  2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(a) On timber or plastered surface :With super gloss (hi-gloss) -(iv) Two coats (with any shade except white)
12BUILDING WORKS (K) PAINTING, VERNISHING ETC?(A) ORIGINAL WORKS.(2)(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(b) On steel or other metal surface :With super gloss (hi-gloss) -(iv) Two coats (with any shade except white)
13BUILDING WORKS(R) ALUMINIUM WORKS???(1)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized (with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding & casement windows, partitions, formed of basic sections of any ISI embossed / certified make and brand as per direction of Engineer - In-Charge. (Payment will be made on finished length of the work).(A) In 10-12 Micron thickness Annodizing film. I) Natural white.a) 2- track sliding window.i) Bottom frame.
14BUILDING WORKS(R) ALUMINIUM WORKS???(1)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized (with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding & casement windows, partitions, formed of basic sections of any ISI embossed / certified make and brand as per direction of Engineer - In-Charge. (Payment will be made on finished length of the work).(A) In 10-12 Micron thickness Annodizing film. I) Natural white.(a) 2- track sliding window.ii) Top and side frame.
15BUILDING WORKS(R) ALUMINIUM WORKS???(1)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized (with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding & casement windows, partitions, formed of basic sections of any ISI embossed / certified make and brand as per direction of Engineer - In-Charge. (Payment will be made on finished length of the work).(A) In 10-12 Micron thickness Annodizing film. I) Natural white.     d) Shutter for all track sliding window. i) Bottom & Top member.
16BUILDING WORKS(R) ALUMINIUM WORKS???(1)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized (with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding & casement windows, partitions, formed of basic sections of any ISI embossed / certified make and brand as per direction of Engineer - In- Charge. (Payment will be made on finished length of the work).(A) In 10-12 Micron thickness Annodizing film. I) Natural white.     d) Shutter for all track sliding window. ii) Style side member.
17BUILDING WORKS(R) ALUMINIUM WORKS???(1)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized (with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding & casement windows, partitions, formed of basic sections of any ISI embossed / certified make and brand as per direction of Engineer - In-Charge. (Payment will be made on finished length of the work).(A) In 10-12 Micron thickness Annodizing film. I) Natural white.     d) Shutter for all track sliding window. iii) Interlock member.
18BUILDING WORKS(R) ALUMINIUM WORKS???(1)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized (with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding & casement windows, partitions, formed of basic sections of any ISI embossed / certified make and brand as per direction of Engineer - In-Charge. (Payment will be made on finished length of the work).(A) In 10-12 Micron thickness Annodizing film. I) Natural white. i) Fixed partitions. (Unsupported length of vertical member upto 1.5 mtr. Height of both ends of vertical member restrained but panels within 0.9 sq.m.)              i) Top , bottom & side member.
19BUILDING WORKS(R) ALUMINIUM WORKS???(1)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized (with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding & casement windows, partitions, formed of basic sections of any ISI embossed / certified make and brand as per direction of Engineer - In- Charge. (Payment will be made on finished length of the work).(A) In 10-12 Micron thickness Annodizing film. I) Natural white. i) Fixed partitions. (Unsupported length of vertical member upto 1.5 mtr. Height of both ends of vertical member restrained but panels within 0.9 sq.m.) ii) Intermediate member.
20BUILDING WORKS(R) ALUMINIUM WORKS???(1)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized (with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding & casement windows, partitions, formed of basic sections of any ISI embossed / certified make and brand as per direction of Engineer - In-Charge. (Payment will be made on finished length of the work).(A) In 10-12 Micron thickness Annodizing film. I) Natural white. i) Fixed partitions. (Unsupported length of vertical member upto 1.5 mtr. Height of both ends of vertical member restrained but panels within 0.9 sq.m.) iii) Glazing clip.
21BUILDING WORKS(R) ALUMINIUM WORKS???(1)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized(with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding &casement windows, partitions, formed of basic sections of any ISIembossed / certified make and brand as per direction of Engineer - In-Charge. (Payment will be made on finished length of the work).(A) In 10-12 Micron thickness Annodizing film. I) Natural white. k) Movable door shutter.      ii) Shutter :Top rail.
22BUILDING WORKS(R) ALUMINIUM WORKS???(1)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized(with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding &casement windows, partitions, formed of basic sections of any ISI embossed / certified make and brand as per direction of Engineer - In-Charge. (Payment will be made on finished length of the work).(A) In 10-12 Micron thickness Annodizing film. I) Natural white. k) Movable door shutter.      ii) Shutter :Bottom rail.
23BUILDING WORKS(R) ALUMINIUM WORKS???(1)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized (with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding & casement windows, partitions, formed of basic sections of any ISI embossed / certified make and brand as per direction of Engineer - In-Charge. (Payment will be made on finished length of the work).(A) In 10-12 Micron thickness Annodizing film. I) Natural white. k) Movable door shutter.      ii) Shutter :Lock rail
24BUILDING WORKS(R) ALUMINIUM WORKS???(1)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized(with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding & casement windows, partitions, formed of basic sections of any ISIembossed / certified make and brand as per direction of Engineer - In- Charge. (Payment will be made on finished length of the work).(A) In 10-12 Micron thickness Annodizing film. I) Natural white. k) Movable door shutter.      ii) Shutter :Door vertical.
25BUILDING WORKS(R) ALUMINIUM WORKS???(1)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized(with required film thickness and specified colour / natural) matt finishedconforming to IS: 1868-1983 for fabrication of composit door, sliding &casement windows, partitions, formed of basic sections of any ISIembossed / certified make and brand as per direction of Engineer - In-Charge. (Payment will be made on finished length of the work).(A) In 10-12 Micron thickness Annodizing film. I) Natural white. k) Movable door shutter.      ii) Shutter :Glazing cleap.
26BUILDING WORKS(R) ALUMINIUM WORKS??(2)Labour charge for fabrication and installation of composite door,window, partitions made from annodized extruded alloy aluminiumsections for the following units:-(A) Glazed aluminium sliding windows made of extruded and annodizedalloy aluminium sectios, fabrications, including cutting to proper shapeand size, drilling and aligning of window shutter frame fitted with in builtlocking arrangements, sliding rollers and other necessary fittings, fixture,adhesives and joineries along with extruded neoprine or EPDMgasketing in between window frame and masonry work (walls, column,beam.lintels etc.) as well as between glass and shutter frame for fixingglass and Polysulphide sealant and in between shutter and window framewhere necessary including cutting to requisite size and fixing glass asper drawing, specification and direction of EIC.The rate includes the hire charge of all tools and plants, including allincidental charges, adhesive, joineries such as screw, cleat angle etc. butexcluding the cost of extruded aluminium sections, glass, neoprene /EPDM gasket, locking arrangement and rollers. i ) 2 track sliding window.Note: Add extra for each Addl. Floor over the rate of item 2A, 2B, 2Cand 2D except 2A(vi)i) Upto 4th Floor Rs.12.00 per Sq.mii) Above 4th Floor Rs.16.00 per Sq.m
27BUILDING WORKS(R) ALUMINIUM WORKS??(2)Labour charge for fabrication and installation of composite door,window, partitions made from annodized extruded alloy aluminiumsections for the following units:-(B) Partly glazed partly panelled or fully glazed single leaf alunminiumswing door made of extruded and annodized alloy aluminium sections,fabrication including cutting to proper shape and size, drilling andaligning, fitted with heavy duty hydraulic action floor sping placed in thefloor with mending damages,with top pin assembly of approve make andbrand, fitted with in built locking arrangement, flush bolt, glazing clipsand all other necessary fittings, fixtures, adhesives and joineries, cuttingglass of approved make to requisite shape and size fitting with dry setneoprene or EPDM gasketing, cutting to requisite shape and size panelboard (prelaminated particle block) fixing them with glazing clips as perdrawing, specification and direction of Engineer in charge.The rate includes the hire charge of all tools and plants, adhesive,joineries such as screw, cleat angle etc. but excluding the cost of extrudedalumium sections, glass, panel boards neoprene / EPDM gasket, lockingarrangement, weather gasket / wool pile, floor spring, top pin, handle,tower bolt, glazing clips etc. (10% rate reduction has to be made forswing doors or partitions where floor sping is not used. 10%enhancement of rate is to be made where door frame of extrudedaluminium sections has to be fitted and fixed to masonry wall. 5% rateenhencement may be allowed for double leaf swing door. Payment shallbe made for the shutter area only exept where door frame is fixed theentire opening shall be taken to consideration.Payment for door framesections are to be paid seperately).Note: Add extra for each Addl. Floor over the rate of item 2A, 2B, 2Ci) Upto 4th Floor Rs.12.00 per Sq.mii) Above 4th Floor Rs.16.00 per Sq.m
28BUILDING WORKS(R) ALUMINIUM WORKS??(2)Labour charge for fabrication and installation of composite door,window, partitions made from annodized extruded alloy aluminiumsections for the following units:-(D) Partly glazed and partly panelled partition or fixed glazing made ofextruded and anodised alloy aluminium sections, fabrications afterutting to proper shape and size, drilling and aligning fitted with inbuiltlocking arrangement cutting the glass / board (prelaminated / particle /block) to requisite shape and size moulding the edges fitted and fixednecessary arrangements for fixing the partition to walls, floors, beams,columns polysulphide sealant for water proofing if necessary complete inall respect as per drawing and specifications and direction of theEngineer in charge.The rate includes the hire charge of all tools and plants, adhesive,joineries such as screw, fastener but excluding the cost of extrudedaluminium sections, EPDM gasket, glass, board, glazing clips, lockingarrangement, etc. I) For partitions using section of size:  a) 63.50 mm x 38.10 mm Note: Add extra for each Addl. Floor over the rate of item 2A, 2B, 2Cand 2D except 2A(vi)i) Upto 4th Floor Rs.12.00 per Sq.mii) Above 4th Floor Rs.16.00 per Sq.m
29BUILDING WORKS(R) ALUMINIUM WORKS??(9)Supplying bubble free float glass of approved make and brand conforming to IS: 2835-1987. iii) 5mm thick clear glass.
30BUILDING WORKS (G) WOOD AND PVC WORKS G. WALL PANELLING 13.Providing, fitting and fixing in position, medium density fibre board conforming to IS: 12406-1988 for plain and IS: 14587-1998 for prelaminated made of wood fibre bonded with Urea formaldehyde for interior grade and Phenol Formaldehyde for exterior grade conforming to per IS:848-1974 as per approved make and brand as per direction of Engineer-in-Charge. In Ground Floor (B) One side decorative lamination (II) Interior Grade (i) 8mm.(For upper floors refer to item H(4) for items 13, 14, 15, 16 under subhead G)
31BUILDING WORKS(R) ALUMINIUM WORKS??(12)Supplying 4 lever mortice lock or any approved make and brand as per direction of the Engineer- in -Charge.(ii) 100 mm.
32BUILDING WORKS(R) ALUMINIUM WORKS??(13)(A) Supplying Aluminium casted body hydraulic door closer as per I.S.I. Note:- For Colour anodizing rate of item no. 10, 11, 13A, 13C, 13D,13E to be enhanced by 10%..
33BUILDING WORKS(R) ALUMINIUM WORKS??(13)(C) Supplying Heavy Duty Aluminium Handle (EBCO Type)(Natural White). Note:- For Colour anodizing rate of item no. 10, 11, 13A, 13C, 13D,13E to be enhanced by 10%..
34BUILDING WORKS (G) WOOD AND PVC WORKS D. ACCESSORIES 5. Iron butt hinges of approved quality fitted and fixed with steel screws, with ISI mark (vi) 100mm. X 50mm. X 1.25mm.. (Add Extra 30% for Oxidised Fittings)
35BUILDING WORKS (G) WOOD AND PVC WORKS D. ACCESSORIES 19. (ii) Door stopper (Anodised aluminium)
36BUILDING WORKS(R) ALUMINIUM WORKS??(6)Supplying PVC rollers for sliding windows as per direction of Engineer in charge.
37BUILDING WORKS(R) ALUMINIUM WORKS??(7)Supplying maruti lock (100mm)
38BUILDING WORKS(R) ALUMINIUM WORKS??(8)Supplying EPDM gusket of approved make and brand as per direction ofEngineer in charge.   i) For sliding windows.    a) " T" shaped EPDM gasket for frames.
39BUILDING WORKS(R) ALUMINIUM WORKS??(8)Supplying EPDM gusket of approved make and brand as per direction ofEngineer in charge.   i) For sliding windows.b) "U" shaped EPDM gasket for frames.
40MATERIALS AND LABOUR  1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
41Sub Total
42GST 18%
43CESS 1%
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail