}

Tender For Strengthening Of Palayanallur Road(R788) In Korukkai Panchayat Km- 0/0-0/628, kumbakonam-Tamil Nadu

Rural Development And Panchayats Department has published Tender For Strengthening Of Palayanallur Road(R788) In Korukkai Panchayat Km- 0/0-0/628. Submission Date for this Tender is 18-12-2023. Road Work Tenders in kumbakonam Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

41036888
Tender For Strengthening Of Palayanallur Road(R788) In Korukkai Panchayat Km- 0/0-0/628
Open Tender
Indian
Tamil Nadu
kumbakonam
18-12-2023

Tender Details

Tender For Strengthening Of Palayanallur Road ( R788 ) In Korukkai Panchayat Km- 0 / 0-0 / 628; 2 Earth Work Excavation And Depositing On Bank With Initial Leadof 10Metresand Lift Of 2Metres As Per Ss 20A Including Breakingclods, Sectioning, Ramming Etc., Complete As Directed By The Dept. Officers For Formation. ( Si. No.61 ) 3 Picking The Existing Worn Out Bt Surface To An Average Thickness Of 50 Mm Including Labour Charges And Machinery Charges Etc Complete 4 Providing And Laying 75Mm Compacted Thick Wbm Grade Iii Using 1 Cum Of 63Mm To 11.20Mm Irc Hbg Metal And 0.24 Cum Of Gravel For Blindage For 10 Sqm. Of 75Mm Compacted Thick ( The Blindage Material Shall Have Pi Value Less Than 6% ) Including Cost And Conveyance Of All Materials From Approved Quarry To Work Site And Stacking To Departmental Gauge For Pre-Measurement As Directed By The Departmental Officers Including Labour For Spreading Metal And Gravel Hand Packing To Camber And Grade Lines Blinding With Required Quantity Of Gravel, Forming Edge Bunds, Watering With All Leads For Good Water Slurrying, Rolling And Consolidation By Power Roller And Finishing As Per Most 404 ( Iii Revision ) Including Hire And Fuel Charges For Power Roller And Water Sprinkler And All Other Tools And Plants Employed Therefor And All Incidental Charges Etc., Complete For Top Layer 5 Applying Tack Coat Over Wbm Surface ( Not Treated With Primer ) Using 4Kg Of Bituminous Emulsion Per 10 Sqm. Including Cost Of Bituminous Emulsion Which Will Be Supplied Departmentally At Section Stores And Cost Of Which Will Be Recovered At The Rates As Per Special Conditions Appended Herewith Including Conveyance Of Bituminous Emulsion To Actual Work Spot Handling Charges Including Labour Charges For Brushing, Cleaning And Preparing The Surface For Laying The Tack Coat And Labour And Machinery Charges For Applying The Required Quantity Of Bituminous Emulsion Including Hire, Fuel And Running Charges For All Tools And Plants Employed For The Work Including All Other Incidental Charges Such As Barricading And Providing Danger Lights, Flags Etc., Complete As Per Standard Specification. 6 Providing And Laying Open Graded Premix Carpet Of 20Mm Compacted Thick Using 0.18Cum Of 13.20Mm Irc Size Hbg Machine Crushed Chips And 0.09 Cum Of 11.20Mm Irc Hbg Machine Crushed Chips With 14.60Kg Of Bitumen For 10 Sqm. Of Premix Carpet Including Laying Of Seal Coat A Over The Premix Carpet Using 0.09 Cum Of 6.70Mm Irc Size Hbg Machine Crushed Chips With 9.80Kg Of Bitumen Per 10 Sqm. Including Cost And Conveyance Of Chips And Stacking Them To Departmental Gauge For Pre-Measurements Including Cost Of Bitumen Which Will Be Supplied By The Department At Departmental Section Stores And Its Cost Will Be Recovered As Per Special Condition Appended Including Heating The Bitumen And Metal Mixing The Materials In Mini Hot Mix Plant For Premix Carpet Including Spreading The Same And Finishing And Compacting The Same By Power Rolling To The Specified Lines And Grades Including All Labour Charges Application Of Bitumen For Seal Coat Over The Premix Carpet And Spreading The Seal Coat And Power Roller Rollingseparately As Per Most Specification 509 And 513 ( Iii Revision ) Including All Labour Charges Hire And Fuel Charges Formini Hot Mix Plant, Power Roller 80-100Kn Capacity And All Other Tools And Plants Employed Therefor Etc.Com. 7 Providing And Laying Gravel To 100Mm Compacted Thick Including Cost & Conveyance Of Gravel From Approved Sources To Work Site Including Labour For Spreading, Wateringand Compacting By Power Roller To Achieve The Required Proctor Density At 100% Compaction 8 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package }

Key Value

Document Fees
Refer document
EMD
INR 14700.0 /-
Tender Value
INR 14.70 Lakhs /-

BOQ Items

Name of Work:THANJAVUR DISTRICTScheme: PUGF- 2023-2024 Amount :1470000 Part.01.Strengthening of Palayanallur Road(R788) in Korukkai Panchayat -Km- 0/0-0/628
Sl. No. Item Description
1Part.01.Strengthening of Palayanallur Road(R788) in Korukkai Panchayat -Km- 0/0-0/628
2Earth work excavation and depositing on bank with initial leadof 10metresand lift of 2metres as per SS 20A including breakingclods,sectioning,ramming etc., complete as directed by the dept. officers for formation.(SI. No.61)
3Picking the existing worn out BT surface to an average thickness of 50 mm including labour charges and machinery charges etc complete
4Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
5Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
6Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat "A" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rollingseparately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges formini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
7Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, wateringand compacting by Power roller to achieve the required Proctor density at 100% compaction
8GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail