}

Tender For Manning And Opr Of Ac Plants At Wed And Repairs And Maint Of Ahu, Chiller Pumps, Cooling Tower And Control Panels Of Ac Plant At Nad (T), Wed, Dsrv Area And Compre Repairs To Ext And Int Fire Ftg System And Connected Eqpts Under Ge (Nw) Ma, mankhurd-Maharashtra

Military Engineer Services-MES has published Tender For Manning And Opr Of Ac Plants At Wed And Repairs And Maint Of Ahu, Chiller Pumps, Cooling Tower And Control Panels Of Ac Plant At Nad (T), Wed, Dsrv Area And Compre Repairs To Ext And Int Fire Ftg System And Connected Eqpts Under Ge (Nw) Ma. Submission Date for this Tender is 15-01-2024. Control Panel Tenders in mankhurd Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

41029409
Corrigendum : Tender For Manning And Opr Of Ac Plants At Wed And Repairs And Maint Of Ahu, Chiller Pumps, Cooling Tower And Control Panels Of Ac Plant At Nad (T), Wed, Dsrv Area And Compre Repairs To Ext And Int Fire Ftg System And Connected Eqpts Under Ge (Nw) Ma
Open Tender
Indian
Maharashtra
mankhurd
15-01-2024

Tender Details

Manning And Opr Of Ac Plants At Wed And Repairs And Maint Of Ahu, Chiller Pumps, Cooling Tower And Control Panels Of Ac Plant At Nad ( T ) , Wed, Dsrv Area And Compre Repairs To Ext And Int Fire Ftg System And Connected Eqpts Under Ge ( Nw ) Mankhurd

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 23-Dec-2023 BOQ CORRIGENDUM BOQ 08-01-2024
2 08-Jan-2024 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 15-01-2024

Key Value

Document Fees
INR 1000 /-
EMD
INR 197200.0 /-
Tender Value
INR 1.22 Crore /-

BOQ Items

Name of Work: MANNING AND OPERATION OF AC PLANTS AT WED AND REPAIRS AND MAINTENANCE OF AHU, CHILLER PUMPS, COOLING TOWER AND CONTROL PANELS OF AC PLANT AT NAD (T), WED, DSRV AND MANKHURD AREA AND COMPREHENSIVE REPAIRS TO EXTERNAL & INTERNAL FIRE FIGHTING SYSTEM AND CONNECTED EQUIPMENTS UNDER GE (NW) MANKHURD
Sl. No. Item Description
1Mannual Rescue and Operation Rescue of Central AC Plants [Installation consisting of AC Plant of direct expansion type 42 TRcapacity having 03 Nos compressors each of 21 TR capacity (02 Nos. working at a time and 01 No. standby) with all connected equipments and machineries as per Serial No 1 of Annexure "A" to Particular Specifications] round the clock through out the monthin three shifts (including Sundays and Holidays) by employing one operator cumAC machenic per shift of eight hours including carrying out routine maintenance and upkeeping the Installation / AC Plants in operation condition complete in all respects as specified and directed :- Location :Store House SSK & (5 & 6) Building at WED Mankhurd: (i)1stshift-0600 hrs to 1400 hrs (ii)2nd shift - 1400 hrs to 2200 hrs (iii)3rdshift- 2200 hrs to 0600 hrs
2Mannual Rescue and Operation Rescue of Central AC Plants [Installation consisting of AC Plant with chilled water system 60 TRcapacity having 03 Nos compressors each of 30 TR capacity (02 Nos. working at a time and 01 No. standby) with all connected equipments and machineries as per Serial No 3 of Annexure "A" to Particular Specifications] round the clock through out the monthin three shifts (including Sundays and Holidays) by employing one operator cumAC machenic per shift of eight hours including carrying out routine maintenance and upkeeping the Installation / AC Plants in operation condition complete in all respects as specified and directed :- Location :Store House No. (8 & 9) & (10 & 11) at WED Mankhurd: (i)1stshift-0600 hrs to 1400 hrs (ii)2nd shift - 1400 hrs to 2200 hrs (iii)3rdshift- 2200 hrs to 0600 hrs
3Mannual Rescue and Operation Rescue of Central AC Plants [Installation consisting of AC Plant with chilled water system 76 TRcapacity having 03 Nos compressors each of 38 TR capacity (02 Nos. working at a time and 01 No. standby) with all connected equipments and machineries as per Serial No 5 of Annexure "A" to Particular Specifications] round the clock through out the monthin three shifts (including Sundays and Holidays) by employing one operator cumAC machenic per shift of eight hours including carrying out routine maintenance and upkeeping the Installation / AC Plants in operation condition complete in all respects as specified and directed :- Location :WED Mankhurd (DSRV) : (i)1stshift-0600 hrs to 1400 hrs (ii)2nd shift - 1400 hrs to 2200 hrs Notes for ITEM NOS 01 TO 03: Quoted rates shall also be deemed to include the following elements:- (i) To provide uniform, tools & plants, safety means like glove etc to the employees and also alternative employee (reliever) for Manning and Operation of AC Plants/Installation so that the other employees can avail the facility of weekly leave etc. (ii)To keep the AC Plant Room & allied area in clean and tidy condition during the operation period. (iii)To carryout the routine maintenance, minor repairs, oiling, greasing and to rectify the minor defects to keep the plants / Installation in serviceable condition all as directed by the GE and Engineer-in-Charge.However, the major repairs, replacements, overhauling, gas charging, topping-up oil etc are not included in the scope of the above items. (iv)To keep necessary documentation duly signed by all the concerned. (v) To hand over the entire plant in serviceable condition at the time of completion.
4M & L for dismantling condenser connections for descaling, plugging them and providing 15 mm bore tee outlet for local circulation of mild acid solution in the condenser (separate container and small pump set to circulate mild acid solution shall be used).The PH value of solution shall be 4 and it shall be checked frequently i.e. every 1 hour during the operation.The Scalgun WS solution or equivalent solution as approved by the GE shall be used for discaling purpose.After 2 to 3 hours of cleaning, if the PH value remains less than 7, flush with fresh water added with sodium carbonate. After above process, the end covers shall be opened and condenser tubes shall be cleaned with Nylon brush, subsequently after closing the end covers, circulate mild acid solution as specified above and PH value shall be maintained as above, flushing the same with fresh water including recharging of stored refrigerantupto required pressure complete all as specified and directed for AC Plant ofcondensor 3 x 13 TR capacity (Rukmai Mahul). Notes:The quoted rates shall also be deemed to include the following elements :- (a)The solution shall be warmed upto 35 DegreeCelsius. (b)During the entire process of cleaning, the PH value ofwater shall be 7. (c) Provision of solution for descaling, rubber gaskets, washers, nuts, bolts etc as directed.
5All as per item No.4.00 hereinbefore butfor Condensar of AC Plant of 2 x 40 TR Capacity (Store 5 & 6 WED).
6All as per item No.4.00 hereinbefore but for Condensar of AC Plant of 3 x 30TR Capacity , (Store 8 & 9, WED) & (Sonobway, WED).SSK
7All as per item No.4.00 hereinbeforebut for Condensar of AC Plant of 3 x 38TR Capacity DSRV WED
8All as per item No.4.00 hereinbefore but for Condensar of AC Plant of 3 x 80TR Capacity MTS Mahul
9Disconnecting chiller connection for descaling, providing 2 Nos of 15mm dia tee and plugging for circulating mild acid solution in the chiller(Separate container and small pump set shall be used to circulate mild acid solution with PH value 4). The Scalgun WS/Cleansol or equivalent solution as approved by the GE shall be used for descaling purpose.After 2 to 3 hours of cleaning if the PH value remains less than 7, flush with fresh water added with sodium carbonate till PH value attains to 7 for the chiller connection of AC plants of 3 x 80 TR Capacity (MTS TS Mahul) complete all as specified and directed. Notes:The quoted rates shall also be deemed to include the following elements :- (a) The solution shall be warmed upto 35 Degree Celsius (b)During the entire process of cleaning, the PH value ofwater shall be 7. (c) Provision of solution for descaling, rubber gaskets, washers, nuts, bolts etc as directed.
10All as per item No.9.00 hereinbefore hereinbefore above but for the chiller connection of AC Plant of 2 x 40 TR Capacity (Store 5 & 6, WED).
11All as per item No.9.00 hereinbefore but for the chiller connection of AC Plant of 3 x 30 TR Capacity (Store 8 & 9, WED) (Sonoboy WED).
12All as per item No.9.00 hereinbefore but for the chiller connection of AC Plant of 3 x 38 TR Capacity (DSRV WED)
13All as per item No.9.00 hereinbefore but for the chiller connection of AC Plant of 2 x 38/39 TR Capacity (Rukmani Mahul)
14Supply only compressor oil as per requirement, complete all as specified and directed, Make :Servo, HP, BP, Sheetal N-68, Freezol 36
15Supply only refrigerant (R-22) gas as per requirement, complete all as specified and directed. Make : MAFRON/FLORON/ REFRON/ FREON Note-: The quantity of the above items shall only be operated to the extent required for topping-up as specified in the relevant other connected items of BOQ.
16Supply only refrigerant (R-407C) gas as per requirement, complete all as specified and directed. Make : MAFRON/FLORON/ REFRON/ FREON Note-: The quantity of the above items shall only be operated to the extent required for topping-up as specified in the relevant other connected items of BOQ.
17Supply and fixing in repair Scrooll Compressor for 11 to 22 TR capacityfrom the unit after disconnecting electrical wiring & piping connecting nut & bolts etc refixing & installed ofscroll compressor and connecting pipe line for existing pipe brazing & electric connecting etc andtesting for smooth functioning etc, complete all as specified and directed.
18Dismantlingcooling coil section for 33 to 39 TR capacity of AHU for descaling and provision of 2 Nos 15mm tee outlet for local circulation of mild acid solution in the coil.Separate container and small pump set shall be used to circulate mild acid solution with 4PH value. The Scalgun WS/Cleansol or equivalent solution as approved by the GE shall be used for descaling.If the PH value remains less than 7, flush with fresh water added with sodium carbonate till PH value attains to 7.Refixing the coil section in position, carryout minor repairs includingfixing arrangement etc.AHU coil fins shall be cleaned by Sealgum solution by spraying the solution with washing pump upto the required level for 160 TR Capacity of AHU Plant (Mahul).
19All as per item No.18.00 hereinbefore but for 60 TR capacity (Location : WED )
20All as per item No.18.00 hereinbefore but for 40 TR capacity(Location : WED)
21All as per item No.18.00 hereinbefore but for 38 TR capacity(Location :DSRV WED)
22All as per item No.18.00 hereinbefore but for 36 TR capacity(Location Rukmani Mahul)
23Re-winding of 100 HP capacity compressor electric motor 3 phase, 50Hz, 415 Volts of pump set complete all as specified and directed. NOTES: The quoted rates shall also be deemed to include the following elements:- (a) Disconnecting & removing the electric motor from installed position includingloading, unloading and transporting to approved workshop. (b) Dismantling the existing burnt winding from the motor including winding with new super enamelled copper winding wire of existing gauge, also including provision of all insulating material such as insulation paper, sleeves, tape, varnish etc complete in all respects for class ’F’ insulation. (c) Transporting the motor back to the location, reinstalling in original position including making alignment, electric connection etc complete, commissioning and testing for 8 hours continuously to check the RPM to the satisfaction of Engineer-in-Charge. (Note : Any damage caused during handling and rewinding etc will be made good by the contractor at his own cost).
24All as per item No.23.00 hereinbefore but40 HP capacity motor.
25All as per item No.23.00 hereinbefore but20/25 HP capacity motor
26All as per item No.23.00 hereinbefore but 10 HP capacity motor.
27All as per item No.23.00 hereinbefore but 7.5 HP capacity Motor.
28All as per item No.23.00 hereinbefore but 5 HP capacity Motor.
29All as per item No.23.00 hereinbefore but 3 HP capacity Motor.
30Supply and fix in repairs automatic capacity control pilot solenoid valve suitable for the liquid line of AC Plants of various capacity complete all as specified and directed,Make :- Rotex, Avcon, SPORLAN, DANFOSS.
31M & L for thermal insulation over 150mm bore chiller water piping with 50mm thick fibre glass wool, crown 150 and of density 24 Kg/Cum, the glass wool shall be covered with and including 24 SWG aluminium sheet cladding, complete all as specified and directed, Make: Lloyd"s / TWIGA/ FGP Ltd.
32All as per item No.31.00 hereinbefore but over 80mm bore chiller water piping
33All as per item No.31.00 hereinbefore butover 50mm bore chiller water piping
34Dismantling of Monoblock pump of under mentiuoned capcities from connected suction/delivery pipes and electric connections etc, taking to workshop, overhauling of the same and replacing unserviceable spares/parts/components, cleaning of impeller, greasing reassembling, bringing providing paking necessary nuts & bolts etc and reconnecting, recommissioning and testing for smooth functioning. (Notes:Cost of all the elements (material cost as well as labour cost) for making the pumps completely functional except the following shall be deemed to be included in the quoted ratess: (a)Supply only spares included under item Nos. 34.01 to 34.04 hereinafter.
3540 HP Capacity
3620/25 HP Capacity
3710 HP Capacity
387.5 HP Capacity
39Supply only following spares /components/parts for monoblock pump set all as specified and directed :-
40Gun metal bushes for 40 HP capacity
41Gun metal bushes for 20/25 HP capacity
42Gun metal bushes for 10 HP capacity
43Gun metal bushes for 7.5 HP capacity
44Gland packing set for 40 HP capacity
45Gland packing set for 20/25 HP capacity
46Gland packing set for 10 HP capacity
47Gland packing set for 7.5HP capacity
48Bearing for 7.5 HP capacity Make : SKF, TATA, NBC
49Bearing for 10HP capacity Make : SKF, TATA, NBC
50Water seal packing for 7.5 HP capacity
51Water seal packing for 10 HP capacity
52TakingdownAC Plantcompressor reciprocatingtype model SMC-4-100of ACCEL Make by dismantling complete assembly, after pumping down refrigerant R-22,overhaulingthe compressor includingreplacement of unserviceable spares, alsoincluding machining of crank shaft bearing,polishing, replacing of gasketspacking,reassembly and rechargingof pumpeddown Refrigerant, also charging of additional refrigerant upto the required pressure& topping up if required to maintain the required standingcharged pressureof compressor oil, testing for smooth functioning etc, complete all as specified and directed. Location :Sonu Bouy WED (Note: Cost of all the elements (material cost as well as labour cost) for making the compressors completely functional except the following shallbe deemed to be included in the quoted rates : (a)Supply only additonal refrigerant required for recharging of pumped down refrigerant, if required. (b)Supply only compressor oil for topping up, if required.
53Supply only following spares for compressor reciprocating type model SMC- 4-65, Make : ACCEL :
54Supply & fix Crank shaft duly remetalised, grinded, polished and made to size to match with the existing.
55Piston rings Cat No. N-5959
56Piston Cat No. V-6138
57Piston Pin Cat No. F-6701
58Piston Oil rings Cat No. B-1470
59Connecting rod bearing Cat No. F-8363
60Main bearing(Set of two) Cat No. F-6085A
61Liner assembly Cat No. F-8371
62Oil pump assembly Cat No. V-6166
63Rocker arm Cat No. F-7152
64Loader/unloader spring Cat No. F-6085
65Suction valve reeds Cat No. F-6080
66Discharge valve reeds Cat No. F-7399
67Oil filter Cat No. V-6168
68Suction Filter Cat No. V-6132
69Oil pressure regulating valve Cat No. F-8368
70Gasket set of make Neopene or equivalent as appoved by the GE
71Compressor safety valve Cat No. V-8759
72Shaft seal assembly, Cat No. V-8405
73Piston sleeves bushing with collars, Cat No. V-8783 Note : The quantity of item Nos 37.01 to 37.20 shall be operated only to the extent required replacement for compressors under item No. 38.00 here-in-before. Unless othewise spcified in the BOQ, these shall be of make ACCEL & of mentioned Cat No in the BOQ and shall be suitable for the compressors under item No 38.00 all as directed and approved by the GE.
74TakingdownAC Plantcompressor reciprocatingtype model SMC-4-65 of ACCEL Make by dismantling complete assembly, after pumping down refrigerant R-22,overhaulingthe compressor includingreplacement of unserviceable spares, alsoincluding machining of crank shaft bearing,polishing, replacing of gasketspacking,reassembly and rechargingof pumpeddown Refrigerant, also charging of additional refrigerant upto the required pressure& topping up if required to maintain the required standingcharged pressureof compressor oil, testing for smooth functioning etc, complete all as specified and directed. Location :Store house 5 & 6 at WED (Note: Cost of all the elements (material cost as well as labour cost) for making the compressors completely functional except the following shallbe deemed to be included in the quoted rates : (a) Supply only spares included under item Nos 37.01 to 37.20here-in-after. (b)Supply only additonal refrigerant required for recharging of pumped down refrigerant, if required. (c)Supply only compressor oil for topping up, if required.
75Supply only following spares for compressor reciprocating type model SMC- 4-65, Make : ACCEL :
76Supply & fix Crank shaft duly remetalised, grinded, polished and made to size to match with the existing.
77Piston rings Cat No. N-5959
78Piston Cat No. V-6138
79Piston Pin Cat No. F-6701
80Piston Oil rings Cat No. B-1470
81Connecting rod bearing Cat No. F-8363
82Main bearing(Set of two) Cat No. F-6085A
83Liner assembly Cat No. F-8371
84Oil pump assembly Cat No. V-6166
85Rocker arm Cat No. F-7152
86Loader/unloader spring Cat No. F-6085
87Suction valve reeds Cat No. F-6080
88Discharge valve reeds Cat No. F-7399
89Oil filter Cat No. V-6168
90Suction Filter Cat No. V-6132
91Oil pressure regulating valve Cat No. F-8368
92Gasket set of make Neopene or equivalent as appoved by the GE
93Compressor safety valve Cat No. V-8759
94Shaft seal assembly, Cat No. V-8405
95Piston sleeves bushing with collars, Cat No. V-8783 Note : The quantity of item Nos 39.01 to 39.20 shall be operated only to the extent required replacement for compressors under item No. 38.00 here-in-before. Unless othewise spcified in the BOQ, these shall be of make ACCEL & of mentioned Cat No in the BOQ and shall be suitable for the compressors under item No 38.00 all as directed and approved by the GE.
96TakingdownAC Plantcompressor reciprocatingtype model SMC- 8-100 of ACCEL Make by dismantling complete assembly after pumping down refrigerant R-22,overhaulingthe compressor includingreplacement of unserviceable spares, alsoincluding machining of crank shaft bearing,polishing, replacing of gasketspacking,reassembly and rechargingof pumpeddown Refrigerant, also charging of additional refrigerant upto the required pressure& topping up if required to maintain the required standingcharged pressureof compressor oil, testing for smooth functioning etc, complete all as specified and directed. Location : TS Mahul (Note: Cost of all the elements (material cost as well as labour cost) for making the compressors completely functional except the following shallbe deemed to be included in the quoted rates : (a)Supply only additonal refrigerant required for recharging of pumped down refrigerant, if required. (b)Supply only compressor oil for topping up, if required.
97Supply only following spares for compressor reciprocating model SMC- 8-100, Make : ACCEL :
98Piston Cat No. F-6503
99Piston Oilrings Cat No.F-6523
100Main sealing bearing(Set of two) Cat No. F-7276
101Liner assembly Cat No. F-7167
102Oil pump assembly Cat No. F-6501
103Rocker arm Cat No. F-7166
104Loader/unloader spring Lock Cat No. F-7277
105Piston sleeves bushing with collar, Cat No.F-7165
106Suction valve reeds Cat No. F-8162
107Discharge valve reeds Cat No. F-6504
108Oil filter Cat No. F-7796
109Suction Filter Cat No. F-7167
110Oil pressure regulating valve Cat No. F-6507
111Connecting rod bearing Cat No. F-7164
112Gasket set of make Neopene or equivalent as appoved by the GE
113Compressor safety valve Cat No. F-7278
114Shaft seal assembly, Cat No. F-7646 Note : The quantity of item Nos 41.01 to 41.17 shall be operated only to the extent required replacement for compressors under item No. 40.00 here-in-before. Unless othewise spcified in the BOQ, these shall be of make ACCEL & of mentioned Cat No in the BOQ and shall be suitable for the compressors under item No 40.00 all as directed and approved by the GE.
115M & L for preparation of old painted steel surfaces of AC Plant including scraping, cleaning and applying two coats of synthetic enamel paint of approved shade & colour over a coat of red oxide primer including markingand writing SM & MES No/ letters, other details etc. complete all as specified and directed
116Pumping down theexisting refrigerant fromthe plant of 150/160 TR capacity, carrying out theleakage testing of plant with the pressure of Nitrogen gasand monitoring for 24hrs to assessleakages, rectification of leakage by brazing & replacement of necessary gasketswherever required, vacumizing of the plant by vaccum pump and keep-it upto 24 hours for testing and rectification of leakages if any, finallyrecharging of existing refrigerant gas to the plant and topping up of refrigerant if requiredtomaintain the standard pressure etccomplete including testing of the plant for smooth functioning complete all as specified & directed.
117Pumping down theexisting refrigerant fromthe plant of upto 80/76 TR capacity, carrying out theleakage testing of plant with the pressure of Nitrogen gasand monitoring for 24hrs to assessleakages, rectification of leakage by brazing & replacement of necessary gasketswherever required, vacumizing of the plant by vaccum pump and keep-it upto 24 hours for testing and rectification of leakages if any, finallyrecharging of existing refrigerant gas to the plant and topping up of refrigerant if requiredtomaintain the standard pressure etccomplete including testing of the plant for smooth functioning complete all as specified & directed.
118Pumping down theexisting refrigerant fromthe plant of 60/42 TR capacity, carrying out theleakage testing of plant with the pressure of Nitrogen gasand monitoring for 24hrs to assessleakages, rectification of leakage by brazing & replacement of necessary gasketswherever required, vacumizing of the plant by vaccum pump and keep-it upto 24 hours for testing and rectification of leakages if any, finallyrecharging of existing refrigerant gas to the plant and topping up of refrigerant if requiredtomaintain the standard pressure etccomplete including testing of the plant for smooth functioning complete all as specified & directed.
119Pumping down theexisting refrigerant fromthe plant of 30/40 TR capacity, carrying out theleakage testing of plant with the pressure of Nitrogen gasand monitoring for 24hrs to assessleakages, rectification of leakage by brazing & replacement of necessary gasketswherever required, vacumizing of the plant by vaccum pump and keep-it upto 24 hours for testing and rectification of leakages if any, finallyrecharging of existing refrigerant gas to the plant and topping up of refrigerant if requiredtomaintain the standard pressure etccomplete including testing of the plant for smooth functioning complete all as specified & directed. Notes : (i)Refrigerant required for topping up will be measured and paid seperately as supply only under relevant item.
120S & F in replacement loader / Unloader coil 230 Volt, 50HZ for solenoid valve suitable for compressor SMC 6-65 / 8- 65Model, Make : ACCEL
121Taking down existing unserviceable Shaft Sealassembly and in lieuS & F new Shaft Seal Assembly of Make ACCEL including tear gasket, nuts, bolts, washers etc. and testing for leakage of refrigerant suitable for 75/80 TR Capacity chiller unit,Make -ACCEL, complete all as specified and directed.
122All as per item No. 48.00 here in above but Shaft seal Assembly of Make -ACCELfor 30/40 TR capacity chiller unit
123All as per item No. 48.00 here inabove but shaft seal Assembly of Make -ACCEL for 15/21/18 TR Capacity chillar unit of Make ACCEL.
124S & F in replacement unserviceable worn out "V" belt of model B-107 of make Fenner or equivalent in Nirlon/Dunlopas approved by the GE for Compressor/ AHU etc. complete all as specified and directed. SSK WED
125S & F in replacement unserviceable worn out "V" belt of model C-134 of make Fenner or equivalent in Nirlon/Dunlopas approved by the GE for Compressor/ AHU etc. complete all as specified and directed. TS Mahul 160 TR
126S & F in replacement unserviceable worn out "V" belt of model C-130 of make Fenner or equivalent in Nirlon/Dunlopas approved by the GE for Compressor/ AHU etc. complete all as specified and directed.Sonobouy
127S & F in replacement contactor type ML- 2,415Volt, 50Hzforstar deltastarter for motor of compressor, water pump and chiller pump etc. complete all as specified and directed. Make L & T/ Marline - Garline/ SIEMENS/Schneider
128S & F in replacement contactor type ML- 3,415Volt, 50Hz for star deltastarter for motor of compressor, water pump and chiller pump etc. complete all as specified and directed.Make L & T/ Marline - Garline/ SIEMENS/Schneider
129S & F in replacement contactor for type ML- 6,415Volt, 50Hz for star deltastarter for motor of compressor, water pump and chiller pump etc. complete all as specified and directed. Make L & T/ Marline - Garline/ SIEMENS/Schneider
130S & F in replacement contactor for type LCD-132 / LCD-150,415Volt, 50Hz for star deltastarter for motor of compressor, water pump and chiller pump etc. complete all as specified and directed. Make L & T/ Marline - Garline/ SIEMENS/Schneider
131Supply only PVC fills of size 600mm x 300mm x 150mm complete all as specified and directed.
132Supply only PVC fills of size 600mm x 150mm x 150mm complete all as specified and directed.
133M & Lfor replacement of relay for 100 HP Starter installed in Panel Board of AC Plant Installation, complete all as specified and directed, Make : L & T / SIEMENS.
134M & Lfor replacement of relay for 40 HP Starter installed in Panel Board of AC Plant Installation, complete all as specified and directed, Make L&T / Siemens.
135M & Lfor replacement of relay for 20/25 HP Starter installed in Panel Board of AC Plant Installation, complete all as specified and directed, Make L&T / Siemens.
136M & Lfor replacement of relay for 10 HP Starter installed in Panel Board of AC Plant Installation, complete all as specified and directed, Make L&T / Siemens.
137M & Lfor replacement of relay for 7.5/5 HP Starter installed in Panel Board of AC Plant Installation, complete all as specified and directed, Make L&T / Siemens.
138M & Lfor replacement of relay for 3 HP Starter installed in Panel Board of AC Plant Installation, complete all as specified and directed, Make L&T / Siemens.
139M & Lfor replacement of Timer 800 SD installed in Panel Board of AC Plant Installation, complete all as specified and directed, Make L&T or Siemens
140M & Lfor replacement of Indicator lamp RBY, 230 V, installed in Panel Board of AC Plant Installation, complete all as specified and directed, Make L&T / Siemens/C&S.
141Dismantling the existing 30/60 TR capacity condenser from top of the existing unit, disconnecting the inlet and outlet connections of gas & water, transporting the same to the workshop, opening both flanges, boring, taking out complete existing 95 Nos damaged/choked finned copper tubes each of 1.94 metre long& of size 1/2" dia, replacing all the 95 Nos tubes with new finned copper tube of size 1/2" dia & each of 1.94 metre long,pressure testing at workshop, transporting the repaired condensor to the site,reinstalling at site on the top of existing unit, connecting the inlet & outlet connections, welding,boring etc, pressure testing with nitrogen, vaccumizing, gas charging, testing on load for smooth functioning, complete in all respects, all as specified and directed. Note:Supply only refrigerent for topping-up shall only be paid for separately to the extent required and ordered.
142S & F in repairs pressure gauges HP/LP/OP of following capacitiesetc. complete with all accessories,as specified and directed, Make : PENN / INDOFOSS / RANCO / DANFOSS / JOHNSON
1430-30 Kg/ cm2
1440-12.5Kg/ cm2
1450 to 16kg./cm2
146S & F in repairs for expansion valve suitablefor AC plant of 80TR chillar unit, Make ACCEL, complete all as specified and directed, Make: DANFOSS / SPORLAN / RANCO.
147All as per item No. 70.00 above but for AC 30/40 TR chillar unit, Make : ACCEL
148All as per item No. 70.00 above but for AC15/21/18 TR chillar unit, Make ACCEL
149Supply and fix in replacement single phase preventer, type SPPR Type SZ 5 (7 Wire), 380V suitable for existing panel board for AC Plant, complete all as specified and directed, (Make L&T / SIEMENS).
150Supply and fix in replacement MVPD, 380/415V suitable for existing panel board forvarious AC Plant, complete all as specified and directed, (Make L&T / SIEMENS).
151Supply and fix in replacement MCCB, FP, 415 V, fixed type of undermentioned capacity complete all as specified and directed : (Make : STANDARD/HAVELLS/INDO-ASIAN)
152Supply and fix thermal release adjustable type MCCB 250 Amp, FP,415-V, breaking capacity 35 KA
153Supply and fix thermal release adjustable typeMCCB 100 Amp,FP,415-V, breaking capacity 25 KA
154Supply and fix thermal release adjustable type MCCB 63 Amp, FP, 415-V, breaking capacity 16 KA Note for item Nos 75.01 to 75.03: The quoted rates shall also be deemed to include for taking down of existing MCCB"s from Panels after disconneting of cable and provision of new MCCB"s, reconnecting of cables with and including provision of proper lugs and glands.
155Replacement of unserviceable MS pipe,heavy grade of following sizes(condenser water tubing fromthe cooling tower area) including provision of all fittings, welding and connected works as required for smooth functioning of AC Plants, complete all as specified and directed, Make : TATA/JINDAL :-
156150mm bore
157100mm bore
15880mm bore
15965mm bore
16050mm bore
161Supply, Fabrication, Installation, Testing and Commissioning of ducting for supply/Return made out of GI steel metal 22 gauge, Zinc coated complete with all standard accessories, flanges, G I Hardware, Self Adhesive elastomeric foam gasket, support etc as per IS-655, complete all as specified and directed.
162M&L for duct insulation (50mm thick) with resin bonded fibre glass wool roll of density 24 Kg/Cum, with factory laminated aluminium vapour barrier, as specified and including provisionof the followings : (a)M&L for cleaning the duct surface (to be insulated) by scrapping carefully with wire brush etc to make the surface completely free of miss-scale, dirt, dust, grease and other foreign materials, taking special care so that all duct joints are sealed against any leakage. (b)M&L applying rubber based adhesive CPRX compound. (c)M&L for sealing of all longitudinal joints and circular overlaps with and including aluminium foil tape 50mm wide, to make the insulation leakproof. (d)M&L for securing the insulation with and inculding mechanically fastened nylon / steel straps of size 50mm wide at maximum intervals of 1.2 metre.
163Supply and fix in repairs Cast Iron butterfly valve Class PN-16 including flange, nuts, bolts, rubber, gaskets etc suitable for 50mm bore pipe, complete all as specified and directed.
164Supply and fix in repairs Cast Iron butterfly valve Class PN-16 including flange, nuts, bolts, rubber, gaskets etc suitable for 80mm bore pipe, complete all as specified and directed.
165Supply and fix in repairs Cast Iron butterfly valve Class PN-16 including flange, nuts, bolts, rubber, gaskets etc suitable for 100mm bore pipe, complete all as specified and directed.
166Supply and fix in repairs Cast Iron butterfly valve Class PN-16 including flange, nuts, bolts, rubber, gaskets etc suitable for 150mm bore pipe, complete all as specified and directed.
167Supply and fix in repairs Cast Iron Non-return butterfly valve Class PN-16 including flange, nuts, bolts, rubber, gaskets etc suitable for 100mm bore pipe, complete all as specified and directed.
168Supply and fix in repairs Cast Iron Non-return butterfly valve Class PN-16 including flange, nuts, bolts, rubber, gaskets etc suitable for 150mm bore pipe, complete all as specified and directed.
169Supply and fix in repairs Cast Iron Non-return butterfly valve Class PN-16 including flange, nuts, bolts, rubber, gaskets etc suitable for 80mm bore pipe, complete all as specified and directed. NOTE:Make for items 79 to 85 : KRILOSKER/LEADER/KARTAR /ZOLOTO/AUDCO/SANT
170Repair/ installation upto 75 TR chiller after removing suction/ discharge pipe line of gas / water transporting the chiller to workshop, opening both and flange of chiller, cleaning the shell side of chiller and copper tubes with fresh water, pressure testing with water, keeping chiller 24 hrs of pre testing, chocked copper tubes 3/4"120 nos removed the existing chiller after brazing / weldingclosing the both end flange with new gasket after changing the nuts and bolts ,pressure testing carried out after changing the tubes, transporting the chiller to site complete with new nuts & bolts in orginal position connectingsuction / discharge gas line by welding & brazing, vaccumising the system, pressure testing N2 gas if no leakage found, gas charging with required R22 Insulating the chiller nitrile rubber sheet can chiller body and suction / discharge gas pipeline in orginal position testing the system for smooth functioning all as specified & directed.
171Supply and FixWater Flow Switch with Sensor after removing old unservicable water flow switch. Make Hony well or eqivalant complete all as specified and directed.
172Supply and fix replacement of air filters box type with washable nylon flitters media having 95% efficiency to control dust particles upto 10 microns fitted in aluminum framed with both side wire mesh of size 60X 50x5 mm all as per existing complete
173Supply , assembly and erection of GI sheet with C & SS rectangular/square duct made out of "L" shaped hollow profile, duly factory boxed, incl all accessories such as Corner, Cleat, Carriage bolt, Gasket and appropriate sealant on longitudinal joints etc complete of size 24 Gauge.
174Supply and install Replacement of unserviceable Strainer Y type conforming to IS, complete of size of 150 mm dia for cooling water circulation pipe line
175M & L for replacement pot strainerwith stainless steel wire mesh/ perforated basket flanged endsof size 150mm dia.Make: SANT orEquivalent make
176M & L for dismantling of FRP induced draught type cooling tower of capacity upto 80TR AC plant for servicing with replacement of bearing of suitable cap after necessary machinery work including greasing and replacement of nut bolts and removing and pressurized cleaning of existing PVC fins and refixing and reinstallation of the same after fixing of the U/S parts shall be measured and paid separately under respective items of Schedule
177Supply only PVC fills(Big size )in columns
178Supply only PVC fills(small size )in columns
179Supply only PVC eliminator circle
180Supply only sprinkler pipe with cap and lock nut
181Supply only sprinkler
182Supply only tension Bar
183Taking up or down MS pipes and connections including cleaning, cutting out damaged/wornout ends, etc complete all as specified and directed for the following bore :-
184(a) 100 mm
185(b) 150 mm
186(c) 200 mm
187Supply, lay / fix, connect and testing mild steel ERW Class "C" grade pipes, medium grade, in any length, including supply and fixing all MS fittings like bends, tees, tapers, reducers, flanges etc. ISI marked conforming to relevant IS and fixed to walls / ceiling or laid in trenches / floors, welding joints and applying two coats of synthetic enamel paint (of approved tint as per relevant IS) over a coat of red oxide zinc chrome primer complete all as specified and as directed by the Engineer-in-charge of the following bores:
188100 mm dia (bore)
189150 mm dia (bore)
190200 mm dia (bore)
191Supply and fix 200mm sluice valve classPN1.6 as per IS-14846 andincluding taking out old unserviceable sluice valve complete all as per directed Make: Kirloskar/Kartar/Leader
192Supply and fix 150mm sluice valve classPN1.6 as per IS-14846 andincluding taking out old unserviceable sluice valve complete all as per directed Make: Kirloskar/Kartar/Leader
193Supply and fix 100mm sluice valve classPN1.6 as per IS-14846 andincluding taking out old unserviceable sluice valve complete all as per directed Make: Kirloskar/Kartar/Leader
194Supply and fix fire hose cabinet made out of 18 gauge MS sheet but not less than 800 x 600 x 250mm with double door with 4mm thick glass and door frame made out of 16 gauge MS sheet painted with two coats of synthetic enamel paint of fire red color for external faces and brilliant white for inside faces over a coat of red oxide, including taking out old unserviceable hose box complete all as per directed. Make-:Swati/Newage/Winco
195M&L for prepration of exposed surface of centrfugal pumping set of capacity 20 HP to 40 HP with and including suction and delivery mains 80/100 mm dia GI pipe,NRV upto 10 mtrs length removing rusted scale from body cleaning surface area and applying one coat of red oxide primer and two coats of syenthetic enamel paint of approved make writing MES NO,SL NO,Flow of water on pumping set all as specifed and directed by Engineer-in-charge.
196Supply and fabricate MS flat clamps/ fire standmade out mild steel of size 40 x 5 mm(confirming to Fe 290 Gde-165 ), MS sheet, equal angle including drilling hole, nut, bolts, washer and made to shape of required size.
197Supply and fix in replacement of unserviceable gun metal fire hydrant oblique type single outlet 63mm dia instantenous type"A" conforming to IS: 5290, complete all as per directed Make:Swati/Newage/Essel
198S & F swinging type 36m long First Aid Hose Reel, conforming to IS:884 - 1969, having 19mm NB thermoplastic reinforced hose reel tubing, conforming to IS:12585 -1988, 25mm NB ball valve, stopcock, terminating with gunmetal coupling & nozzle of 6mm NB outlet with shut-off valve, conforming to IS:8090-1976 complete with MS socket for tap-off,red colour drum,brackets (including painting) for fixing on wall with anchor fastener, bolts, nuts, etc.complete as specified and directed by the engineer-in-charge. Make: Newage, Safex, Minimax
199S&F CP Hose 15 Meter length shall be non-percolating type conforming to IS 636,complete all as specified and as directed
200M&L for scraping cleaning surface of fire hose cabinet of any type/size internal, and preparation of entire surface and applying two coat of Synthetic enamel paint ( Red Post Office colour outside and brilliant white colour inside) including writing, marking box Nos in stencil all as directed.
201M&L in repair of MS fire hose box made from MS sheet,glass in front,painted with fire red colour,PCC foundation,structurel supports to accommodate two length of 15 Mtrs hose of following sizes:-
202Size 36""x30""x10""
203Size 30""x24""x10""
204M&L for surface cleaning with wire brush, sand paper, removing dust dirt, washing with water, cleaning, drying surface and applying two coat of synthetic paint (Red Post Office) over a coat of red oxide all as directed.
205200 mm dia MS Pipe
206150 mm dia MS Pipe
207100 mm dia MS Pipe
20863 mm fire hydrants
209Supply and fixing two way fire brigade inlet / colleting heads, ISI Marked, IS No. 904, design pressure upto 24 Kgs / Cm2 operating pressure 7 Kgs / Cm2 made in gunmetel body, with 63 mm dia gun metal, Instanteousinlet, NRV, flanged type suitable to be installed over 100mm dia fire pipe line complete in all respect and all as specified. Make : Newtech / New age /HD fire.
210Supply and fix in repairs unservicablewater pressure gauge4" dia with tube to match with the existing forrange 0 to 14 kgs rating
211Supply and fix in repairs unservicablewater pressure gauge4" dia with tube to match with the existing forrange 0 to 21 kgs rating
212Supply only Electronic hooter 24 Volt DC complete for fire alaram system complete with acessories all as directe by engineer-in charge Make - Safetech, Minimax, ECD, Apollo, Zicom/PCD
213M & L forrepair/ Maintenance of Sluice valve of 200mm size and testing for leakage complete including replacing of parts like as Handwheel, gasket, stem etc all as specified and as directed. Note:(a) Rate quoted includes deployment of skilled manpower fitter andunskilled manpower. (b) Contractor should provide necessary arrangement for cutting equipments at site (c) Excavation and earthworkwill be measured and paid separately.
214All as per item No. 117.00 above but for MS Pipe of capacity 150mm size
215All as per item No. 117.00 above but for MS Pipe of capacity 100mm size
216M & L forrepair of damaged portion of MS pipe of 200mm size by cutting the pipe and welding both internally & externally and testing for leakage complete including removing material/scrap generated during the work, both internally & externally all as specified and as directed. Note:(a)Rate quoted includes deployment of skilled manpower like welder, fitter andunskilled manpower. (b) Contractor should provide necessary arrangement for welding /cutting equipments at siteand prior permission to be taken from Engr-in-charge before starting welding works. (c) Excavation and earthworkwill be measured and paid separately.
217All as per item No. 120.00 above but for MS Pipe of capacity 150mm size
218All as per item No. 120.00 above but for MS Pipe of capacity 100mm size
219M& L for repair of fire hydrent valve assembly 65 mm dia with single flanged end pattern complete including neoprene gasket, nuts, bolts, washers including replacement of following spares
220CI operating Wheel
221Stainless Steel Spindle
222Female coupling with Neoprene washers
223Excavation in trenches not exceeding 1.5 Mtr wide and not exc 1.5 Mtr depth for taking out pipe/laying of pipe and getting out in any type of soil.
224Returning, Filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm. deep as in hard/dense soil .
225Removing excavated material not exc 50 Mtr and depositing where directed at a level not exc 1.5 Mtr above the starting point in soil including spreading in low lying area .
226M&L for cutting existing road/hard standing not exc 45x60 cm in wide & depth getting out excavated material for laying water/ fire tubing returning filling & well rammaing wateringfinish suraface 10 cm from top including provision of PCC 1:3:6 for repairing, including removal of surplase soil all as directed
227Material and labour for Plain cement concrete 1:4:8 type D-2 using 40 mm graded stone aggregate in foundation all as specified and as directed.
228M & L for reneval of valve pit of size up to 80 cm x 80 cm x 80 cm (internal diamension), stone/brick construction including all necessary excavation and earth work in any type of soil,returning,filling in disposal of surplus soil to a distance not exceeding 50m and depositing where directed,PCC in foundation for mix(1:2:4) type D2 brick mansonary in cement mortar(1:4) rendering 12mm duck in cement mortar(1:4) internally ,finished even and fair and polishing flush externally as the work proceeds in the same mortor.Mild steel angle iron 40 x40 x6 mm frame MS sheet cover 3.15mm thick with handle and locking arrangement,painting all exposed MS work with two coats of synthetic enamel paint over a cost of red oxide primer and painting all the MS embeded in PCC with two coats of black bitumenous paint complete all as specified.
229Supply,fix,test and commissioning of manual call points in repair, Addressable manual call point resettable type wall mounting type with dust and moisture proof cover and designed to rise the alarm once the glass is broken complete all as specified and directed by Engineer-in-charge.Make:-Newage industries/Minimax/Safex/Ravel
230Supply,fix,test commissioning in repair Fire Alarm addressabble Sounders/ hooterselectronic type horizontal single stage continous normal operation for atleast 50 minutes with sound level 65 DB to 120 DB measured at 1.5 Mtr with sound output variation of +5 DB 500 mtrs range radius range complete all as specified and directed by Engineer-in-charge.Make:-Naveen or equivelant ISI marked as approved by GE
231Supply,fix,test and commissioning in repair high velocity water spray nozzles having end connection of 10.05 mm BSPT,spray angle of 90 degree brass finish,UL listed suitable for deluge system for fire protection application suitable for max pressure 12.3 kg/sqcm complete all as specified and directed by Engineer-in-charge.
232Supply,fix test and commissioning in repair dynamically balanced siren Fire Alarm Sounders / Sirens electronic type horizontal single stage continous normal operation 24 V/600 RPM,1000 mtrs range radius range for atleast 50 minutes with sound level 65 DB to 120 DB measured at 1.5 Mtr with sound output variation of +5 DB complete with provision of GI mounting arrangements all as specified and directed by Engineer-in-charge.Make:-Kheraj electrical(I) Pvt Ltd. Of equivelant ISI marked as approval By GE
233M&L in repair rechargeable SMF batteries of BP-46,for 20Hours backup for microprocessor based intelligent control panel complete all as directed by Engineer-in-charge of following capacity:- Make:-Exide/Tata/Standerd Farukha
23412 Volts,40 AH
23512 Volts,28 AH
23612 Volts,7 AH
237M&L in repair explosion proof/Flame proof Addressable type detectors with IR detection/explosion proof/Flame proof Addressable type detectors with UV detection capacity with & including sensors UV detectors with the rated voltage of 24 Volts DC,with angle of detection as 90 degree including flame sensing elements and conforming to IP 66 with all fixing arrangments. Make:-Hochiki/Honeywell/Appolo/Siemens Note :-The job including testing,commissioning of detectors to match with the existing deluge fire system complete for smooth working all as directed.
238Supply,fix,testing and commissioning of medium velocity water spary nozzles having end connections of 15 mm BSPT,spray angle of 65 digree brass finish,UL listed suitable for deluge system for fire protection application suitable for maximum working pressure 12.3 Kg/sqcm complete all as specified and directed.Make:-HD fire protect Pvt ltd,Model-A or equivelant
239S&F,test and commissioning microprocessor based intelligent control panel two zone to control sprinkler system including battery backup 20 hours with and including provision of battery charger 2 Nos rechargeable SMF batteries of BP 46,12 volts,40 AH/20 HR in each building complete including glands lugs and indication on cable control wiringall as specified and directed.Make:- Ravel electronics/Tricks fire control/ Notifier/Minimax/ Wizmart/ Seimens/Cerbrus
240All as per item No. 137.00 above above but four zone
241M& L for fabrication, installation of fire stand duly made out of angle iron frame of size 40x6 mm thick for canopy support of length 2 mtr and width 1.5 mtr sloping at middle portion, including canopy cover made out of MS sheet 3 mm thick with provision for hanging 6 Nos Fire buckets incl mounting hook etc complete duly painted with 2 coats of PO synthetic enamel paint redand grouting the supporting legs in PCC 1:3:6 at a location shown at site and comprising of the following: (a) GI fire bucket - 6 Nos. (b) Fire beater - 1 No. (c) Fire hook - 1 No. (d) ABC type fire Extinguisher of 5 Kg - 1 Nos (e) Foam typefire Extinguisher of 5 Kg - 1 Nos (f)CO2 type fire Extinguisher of 5 kg - 1 Nos (g) Excavation & earthwork as required in any strata.
242Supply only 24 Volt addressable MCP VI card for Manual call point, ADD MPC VI Complete all as specified and directed by Engineer-in-charge. Make - PDC Fire System or Equivalent From ZICOM/Apollo/Edward/Safetech,
243Supply only CD32 terminal card operating at 24 Volts as signal covertor, the CD 32 Terminal card Complete all as specified and directed by Engineer-in-charge. Make - PCD fire System or Equivalent From Apollo/Zicom/Edward/Safetech,
244Supply only CDRPT - 64 LED PCB card operating at 24 Volts, the CDRPT Crad shall Complete all as specified and directed by Engineer-in-charge. Make - PCB Fire System or Equivalent from Zicom/Apollo/Edward/Safetech,
245Supply only 485 to 485 transmitting & receiving card operating at 24 Volts for fire laram panel Complete all as specified and directed by Engineer-in-charge. Make - PCD Fire System or equivalent from Zicom/Apollo/Edward/Safetech,
246Supply only Switch Mode Power supply operating at input volatage range 180 to 270 Volts and having maximum out put volatage of 28.5 Complete all as specified and directed by Engineer-in-charge. Make - Proxymon/Omron
247S & F in repairs armoured XLPE Insulated 1.5Sqmm 4 core multi stranded copper conductor cable along the walls, in trenches ducts, ceiling / connection to control panel, manual call point complete with termination, testing and commissioning including taking down old u/s cable all as specified and directed by Engr-in-Charge. Make - Polycab/Havells/Plaza
248Supply,lay,test and commissioning in repair on wall,roof or floor,armoured FRLS cables from detector to panel,panel to hooters,manual call points,deluges valves etc.of size 2 core 4 sqmm PVC insulated and sheathed complete all as specified and directed by engineer-in-charge.Make:-Universal/Finolex/CCI/Incab
249S & F in repairs Detectors Complying with and type certified to EN - 45 Addressable type multisensor detector with heat and smoke combination Photoelectric /Opticalwith base with self built intelligence asper IS: 11360 Complete all as specified and directed by Engineer-in-charge. Make - Apollo/Zicom/Hochuki/Edward/PCD/Safetech
250Supply and fixing in repair Scrooll Compressor 38 TR capacityfrom the unit after disconnecting electrical wiring & piping connecting nut & bolts etc refixing & installed ofscroll compressor and connecting pipe line for existing pipe brazing & electric connecting etc andtesting for smooth functioning etc, complete all as specified and directed.
251Repair/ installation upto 30 TR chiller after removing suction/ discharge pipe line of gas / water transporting the chiller to workshop, opening both and flange of chiller, cleaning the shell side of chiller and copper tubes with fresh water, pressure testing with water, keeping chiller 24 hrs of pre testing, chocked copper tubes 3/4"120 nos removed the existing chiller after brazing / weldingclosing the both end flange with new gasket after changing the nuts and bolts ,pressure testing carried out after changing the tubes, transporting the chiller to site complete with new nuts & bolts in orginal position connectingsuction / discharge gas line by welding & brazing, vaccumising the system, pressure testing N2 gas if no leakage found, gas charging with required R22 Insulating the chiller nitrile rubber sheet can chiller body and suction / discharge gas pipeline in orginal position testing the system for smooth functioning all as specified & directed.
252Repair/ installation upto 21 TR chiller after removing suction/ discharge pipe line of gas / water transporting the chiller to workshop, opening both and flange of chiller, cleaning the shell side of chiller and copper tubes with fresh water, pressure testing with water, keeping chiller 24 hrs of pre testing, chocked copper tubes 3/4"120 nos removed the existing chiller after brazing / weldingclosing the both end flange with new gasket after changing the nuts and bolts ,pressure testing carried out after changing the tubes, transporting the chiller to site complete with new nuts & bolts in orginal position connectingsuction / discharge gas line by welding & brazing, vaccumising the system, pressure testing N2 gas if no leakage found, gas charging with required R22 Insulating the chiller nitrile rubber sheet can chiller body and suction / discharge gas pipeline in orginal position testing the system for smooth functioning all as specified & directed.
253Supply only turn Buckle
254Supply only FRP basin
255Supply and install Replacement of unserviceable Strainer Y type conforming to IS, complete of size of 100 mm dia for cooling water circulation pipe line
256M & L for replacement pot strainerwith stainless steel wire mesh/ perforated basket flanged endsof size 100 mm dia.Make: SANT orEquivalent make
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail